General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 96-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
09/17/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 8-1-2019
REHABILITATION OF THE EAST MICHIGAN STREET VERTICAL LIFT BRIDGE OVER THE MILWAUKEE RIVER.
03/19/2019 03:30 PM UTC
OFFICIAL NOTICE 32-1-2019
WATER MAIN RELAYS AND HYDRANT & WATER MAIN ALTERATIONS at the following locations: S. Chase Av. (WT410180013), W. Lincoln Av. to E. Ohio Av. (13 working days); W. Capitol Dr. (WT410180014), N. 2nd St. to N. Green Bay Av. (2 working days); W. Layton Av. (WT410190004), S. Howell Av. to S. 27th St. (8 working days); S. 92nd St. (WT410190006), W. Howard Av. to W. Forest Home Av. (10 working days); S. 22nd Pl. (WT410190637), W. Layton Av. to W. Barnard Av. (15 working days); W. Capitol Dr. (WT410190671), N. 1st St. to N. 2nd St. (10 working days). (Note: Contractor to furnish and install approximately 1,439 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/15/2019 03:30 PM UTC
OFFICIAL NOTICE 22-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 8” CONCRETE PAVEMENT SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150169 – N. 85th St. - W. Locust St. to W. Burleigh St. ST211180120 – W. Metcalf Pl. - N. 97th St. to N. 100th St.
03/14/2019 03:30 PM UTC
OFFICIAL NOTICE 21-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190102 – 2019 ADA Ramps for High Impact Paving Projects at Various south side Locations. The “high impact” asphalt paving projects are as follows: O.N. 17-1-2019 South 9th Street – West National Avenue to West Virginia Street South 10th Street – West Morgan Avenue to West Ohio Street South 18th Street – West Euclid Avenue to West Oklahoma Avenue South 56th Street – West Oklahoma Avenue to West Stack Drive West Lincoln Avenue – South 35th Street to Railroad tracks west of South 43rd Street O.N. 18-1-2019 South 14th Street – West Edgerton Avenue to West Foster Avenue South 14th Street – West Parnell Avenue to West Grange Avenue South 54th Street – West Wilbur Avenue to West Midland Avenue West Abbott Avenue – South 18th Street to South 19th Street West Carpenter Avenue – South 20th Street to South 27th Street West Foster Avenue – South 14th Street to South 15th Place West Honey Creek Drive – West River Bend Drive to West Morgan Avenue South Pine Avenue – East Layton Avenue to South Whitnall Avenue South Pine Avenue – East Oklahoma Avenue to East Holt Avenue West Wilbur Avenue – South 54th Street to City Limits
03/12/2019 03:30 PM UTC
OFFICIAL NOTICE 20-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190101 – 2019 ADA Ramps for High Impact Paving Projects at Various Northside at the following Locations: The “high impact” asphalt paving projects are as follows: O.N. 15-1-2019 West Good Hope Road – North 107th Street to East Line of Fond du Lac Freeway (Ramp) West Fond du Lac Avenue - North 107th Street to West Fond du Lac Freeway (Ramp) North 8th Street – West North Avenue to West Atkinson Avenue O.N. 16-1-2019 North 21st Street – West Center Street to West Burleigh Street North 38th Street – West Lisbon Avenue to West Brown Street North 45th Street – West Martin Drive to West Juneau Avenue North 45th Street – West Juneau Avenue to West Vliet Street North 46th Street – West State Street to West Martin Drive North 48th Street – West Villard Avenue to West Custer Avenue North 75th Street – West Marine Drive to West Glenbrook Road West Cherry Street – North 35th Street to North 37th Street West Congress Street – North 76th Street to North 84th Street West Glenbrook Road – North 70th Street to North 75th Street West Hadley Street – North 41st Street to North Sherman Boulevard West Hawthorne Drive – North 90th Street to North 92nd Street West Marine Drive – North 75th Street to a point east of North 75th Street West Northridge Lakes Boulevard – North 75th Street to North 76th Street North Sherman Boulevard – West Villard Avenue to West Custer Avenue O.N. 19-1-2019 North 35th Street – West Wisconsin Avenue to West Highland Boulevard North Farwell Avenue – East Locust Street to East Kenwood Boulevard North Holton Street – East Keefe Avenue to East Capitol Drive North Hopkins Street – North 35th Street to two hundred (200) feet north of West Hampton Avenue North Humboldt Avenue – East Brady Street to East Kane Place East Kane Place – North Warren Avenue to North Humboldt Avenue North Prospect Avenue – East Locust Street to East Kenwood Boulevard North Water Street – East Brady Street to North Humboldt Avenue
03/11/2019 03:30 PM UTC
OFFICIAL NOTICE 30-1-2019
HYDRANT AND WATER MAIN ALTERATIONS at the following locations: Locations. W. Morgan Ave. (WT410140011), S. 43rd St. to W. Forest Home Av. (8 working days); S. 60th St. (WT410180011), W. Kinnickinnic River Pk. to W. Morgan Ave. (5 working days); W. Fond du Lac Av. (WT410180012), W. Walnut St. to W. Roosevelt Dr. (6 working days); N. Port Washington Rd. (WT410180015), W. Hampton Av. to 150’ N/O W. Hampton Av. (5 working days); N. Teutonia Av. (WT410190005), W. Garfield Av. to W. Groeling Av. (8 working days); W. Forest Home Ave. (WT410190007) at S. 92nd St. (4 working days) (Note: Contractor to furnish and install approximately 343 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/06/2019 04:30 PM UTC
OFFICIAL NOTICE 29-1-2019
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
03/06/2019 04:30 PM UTC
OFFICIAL NOTICE 29-2-2019
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W. Capitol Dr. and W I-94
03/06/2019 04:30 PM UTC
OFFICIAL NOTICE 29-3-2019
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits
03/06/2019 04:30 PM UTC
OFFICIAL NOTICE 9-1-2019
REHABILITATION OF THE WEST BURLEIGH STREET BRIDGES OVER THE MENOMONEE RIVER
02/28/2019 04:30 PM UTC
731 - 740 of 1500 Solicitations
1 2 70 71 72 74 76 77 78 149 150