General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 46-1-2019
FORESTRY CENTER WALL CLADDING 5230 WEST STATE STREET MILWAUKEE WI
04/23/2019 03:30 PM UTC
OFFICIAL NOTICE 31-1-2019
Century City Roof Repairs - Building 36
04/22/2019 03:30 PM UTC
OFFICIAL NOTICE 17-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190105 – S. 7th St. - W. Maple St. to W. Lapham Blvd. S. 9th St. - W. National Ave. to W. Virginia St. S. 10th St. - W. Morgan Av. to W. Ohio St. S. 18th St. - W. Euclid Ave. to W. Oklahoma Ave. S. 56th St. - W. Oklahoma Ave. to W. Stack Dr. W. Lincoln Ave - S. 35th St. to Union Pacific Railroad R.O.W. w/o S. 43rd St.
04/18/2019 03:30 PM UTC
OFFICIAL NOTICE 58-1-2019
WATER MAIN RELAYS at the following locations: N. 86th St. (WT410190611), W. Keefe Av. to 240’ N/O W. Melvina St. (74 working days); N. 84th St. (WT410190612), W. Vienna Av. to W. Capitol Dr. (34 working days); N. 82nd St. (WT410190613), W. Keefe Av. to 250’ N/O W. Nash St. (29 working days); N. 80th St. (WT410190614), W. Townsend St. to W. Nash St. (37 working days); N. 78th St. (WT410190615), W. Lisbon Av. to W. Nash St. (53 working days); N. 75th St. (WT410190616), W. Nash St. to W. Melvina St. (32 working days); W. Vienna Ct. (WT410190617), 200’ SW/O N. 75th St. to N. 75th St. (9 working days); N. 90th St. (WT410190635), W. Townsend St. to W. Metcalf Pl. (24 working days); W. Keefe Av. (WT410190636), N. 90th St. to N. 91st St. (11 working days); N. 82nd St. (WT410190682), W. Vienna Av. to W. Melvina St. (23 working days). (Note: Contractor to furnish and install approximately 11,817 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/17/2019 03:30 PM UTC
OFFICIAL NOTICE 14-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: TD03780001 – W. Kilbourn Ave. - Milwaukee River to N. 6th St. W. Wisconsin Ave. - N. Water St. to N. 10th St.
04/16/2019 03:30 PM UTC
OFFICIAL NOTICE 52-1-2019
WATER MAIN RELAYS at the following locations: W. Daphne St. (WT410190660), N. Hastings St to N. 89th St. (26 working days); N. Hastings St. (WT410190659), W. Acacia St. to W. Kiehnau Ave. (7 working days); W. Acacia St. (WT410190658), N. Hastings St. to N. 89th St. (18 working days); W. Kiehnau Ave. (WT410190657), N. Hastings St. to N. 89th St. (24 working days); W. Brentwood Ave. (WT410190656), N. 83rd St. to N. 89th St. (46 working days); N. Fresno St. (WT410190655), W. Brentwood Ave. to N. 89th St. (26 working days) Note: Contractor to furnish and install approximately 5,690 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.
04/10/2019 03:30 PM UTC
OFFICIAL NOTICE 45-1-2019
PROJECT NO. 1: BIOSWALES IN: Located at: W. Bradley Rd. – 20’ +/- west of N. 51st St. to 198’ +/- east of Dretzka Park Roadway
04/09/2019 03:30 PM UTC
OFFICIAL NOTICE 53-1-2019
WATER MAIN RELAYS at the following locations: N. 70th St. (WT410190661), W. Silver Spring Dr. to W. Bobolink Av. (46 working days); N. 65th St. (WT410190662), W. Silver Spring Dr. to W. Carmen Av. (31 working days); N. 66th St. (WT410190663), W. Silver Spring Dr. to W. Thurston Av. (17 working days); N. 68th St. (WT410190664), W. Silver Spring Dr. to W. Florist Av. (71 working days); N. 61st St. (WT410190665), W. Carmen Av. to W. Kaul Av. (46 working days); N. 62nd St. (WT410190666), W. Bobolink Av. to W. Kaul Av. (31 working days); N. 63rd St. (WT410190667), W. Florist Av. to W. Kaul Av. (14 working days); W. Kaul Av. (WT410190668), N. 60th St. to N. 64th St. (26 working days); W. Bobolink Av. (WT410190669), N. 61st St. to N. 63rd St. (13 working days). (Note: Contractor to furnish and install approximately12,627 LIN. FT. 12", 8", 6" ductile iron pipe. city to furnish miscellaneous materials as shown on plans and proposed form.)
04/08/2019 03:30 PM UTC
OFFICIAL NOTICE 47-1-2019
WATER MAIN RELAYS at the following locations: W. Brentwood Av. (WT410180653), 40’ N/O W. Mill Rd. to N. 78th St. (14 working days); N. 44th St. (WT410180675), W. Green Tree Rd. to 530’ N/O W. Green Tree Rd. (13 working days); W. Parkland Av. (WT410180684), N. 51st Blvd. to N. Edgeworth Dr. (18 working days); N. Fairway Pl. (WT410180685), W. Parkland Av. to N. 55th St. (24 working days); N. 57th St. (WT410180686), N. Edgeworth Dr. to W. Luebbe La. (18 working days); N. Edgeworth Dr. (WT410180687), N. Highview Dr. to W. Luebbe La. (39 working days). (Note: Contractor to furnish and install approximately 5,658 lin. ft. of 8”, 6” and 16” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/05/2019 03:30 PM UTC
OFFICIAL NOTICE 19-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190107 – N. 35th St. - W. Wisconsin Ave. to W. Highland Blvd. N. Farwell Ave. - E. Locust St. to E. Kenwood Blvd. N. Holton St. - E. Keefe Ave. to E. Capitol Dr. N. Hopkins St. - N. 35th St. to 200' n/o W. Hampton Ave. N. Humboldt Bd. - E. Brady St. to E. Kane Pl. E. Kane Pl. - N. Warren Ave. to N. Humboldt Ave. N. Prospect Ave. - E. Locust St. to E. Kenwood Blvd. N. Water St. - E. Brady St. to N. Humboldt Ave.
04/04/2019 03:30 PM UTC
761 - 770 of 1553 Solicitations
1 2 73 74 75 77 79 80 81 155 156