General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2019
Century City Roof Repairs - Building 36
04/22/2019 03:30 PM UTC
OFFICIAL NOTICE 17-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190105 – S. 7th St. - W. Maple St. to W. Lapham Blvd. S. 9th St. - W. National Ave. to W. Virginia St. S. 10th St. - W. Morgan Av. to W. Ohio St. S. 18th St. - W. Euclid Ave. to W. Oklahoma Ave. S. 56th St. - W. Oklahoma Ave. to W. Stack Dr. W. Lincoln Ave - S. 35th St. to Union Pacific Railroad R.O.W. w/o S. 43rd St.
04/18/2019 03:30 PM UTC
OFFICIAL NOTICE 58-1-2019
WATER MAIN RELAYS at the following locations: N. 86th St. (WT410190611), W. Keefe Av. to 240’ N/O W. Melvina St. (74 working days); N. 84th St. (WT410190612), W. Vienna Av. to W. Capitol Dr. (34 working days); N. 82nd St. (WT410190613), W. Keefe Av. to 250’ N/O W. Nash St. (29 working days); N. 80th St. (WT410190614), W. Townsend St. to W. Nash St. (37 working days); N. 78th St. (WT410190615), W. Lisbon Av. to W. Nash St. (53 working days); N. 75th St. (WT410190616), W. Nash St. to W. Melvina St. (32 working days); W. Vienna Ct. (WT410190617), 200’ SW/O N. 75th St. to N. 75th St. (9 working days); N. 90th St. (WT410190635), W. Townsend St. to W. Metcalf Pl. (24 working days); W. Keefe Av. (WT410190636), N. 90th St. to N. 91st St. (11 working days); N. 82nd St. (WT410190682), W. Vienna Av. to W. Melvina St. (23 working days). (Note: Contractor to furnish and install approximately 11,817 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/17/2019 03:30 PM UTC
OFFICIAL NOTICE 14-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: TD03780001 – W. Kilbourn Ave. - Milwaukee River to N. 6th St. W. Wisconsin Ave. - N. Water St. to N. 10th St.
04/16/2019 03:30 PM UTC
OFFICIAL NOTICE 52-1-2019
WATER MAIN RELAYS at the following locations: W. Daphne St. (WT410190660), N. Hastings St to N. 89th St. (26 working days); N. Hastings St. (WT410190659), W. Acacia St. to W. Kiehnau Ave. (7 working days); W. Acacia St. (WT410190658), N. Hastings St. to N. 89th St. (18 working days); W. Kiehnau Ave. (WT410190657), N. Hastings St. to N. 89th St. (24 working days); W. Brentwood Ave. (WT410190656), N. 83rd St. to N. 89th St. (46 working days); N. Fresno St. (WT410190655), W. Brentwood Ave. to N. 89th St. (26 working days) Note: Contractor to furnish and install approximately 5,690 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.
04/10/2019 03:30 PM UTC
OFFICIAL NOTICE 45-1-2019
PROJECT NO. 1: BIOSWALES IN: Located at: W. Bradley Rd. – 20’ +/- west of N. 51st St. to 198’ +/- east of Dretzka Park Roadway
04/09/2019 03:30 PM UTC
OFFICIAL NOTICE 53-1-2019
WATER MAIN RELAYS at the following locations: N. 70th St. (WT410190661), W. Silver Spring Dr. to W. Bobolink Av. (46 working days); N. 65th St. (WT410190662), W. Silver Spring Dr. to W. Carmen Av. (31 working days); N. 66th St. (WT410190663), W. Silver Spring Dr. to W. Thurston Av. (17 working days); N. 68th St. (WT410190664), W. Silver Spring Dr. to W. Florist Av. (71 working days); N. 61st St. (WT410190665), W. Carmen Av. to W. Kaul Av. (46 working days); N. 62nd St. (WT410190666), W. Bobolink Av. to W. Kaul Av. (31 working days); N. 63rd St. (WT410190667), W. Florist Av. to W. Kaul Av. (14 working days); W. Kaul Av. (WT410190668), N. 60th St. to N. 64th St. (26 working days); W. Bobolink Av. (WT410190669), N. 61st St. to N. 63rd St. (13 working days). (Note: Contractor to furnish and install approximately12,627 LIN. FT. 12", 8", 6" ductile iron pipe. city to furnish miscellaneous materials as shown on plans and proposed form.)
04/08/2019 03:30 PM UTC
OFFICIAL NOTICE 47-1-2019
WATER MAIN RELAYS at the following locations: W. Brentwood Av. (WT410180653), 40’ N/O W. Mill Rd. to N. 78th St. (14 working days); N. 44th St. (WT410180675), W. Green Tree Rd. to 530’ N/O W. Green Tree Rd. (13 working days); W. Parkland Av. (WT410180684), N. 51st Blvd. to N. Edgeworth Dr. (18 working days); N. Fairway Pl. (WT410180685), W. Parkland Av. to N. 55th St. (24 working days); N. 57th St. (WT410180686), N. Edgeworth Dr. to W. Luebbe La. (18 working days); N. Edgeworth Dr. (WT410180687), N. Highview Dr. to W. Luebbe La. (39 working days). (Note: Contractor to furnish and install approximately 5,658 lin. ft. of 8”, 6” and 16” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/05/2019 03:30 PM UTC
OFFICIAL NOTICE 19-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190107 – N. 35th St. - W. Wisconsin Ave. to W. Highland Blvd. N. Farwell Ave. - E. Locust St. to E. Kenwood Blvd. N. Holton St. - E. Keefe Ave. to E. Capitol Dr. N. Hopkins St. - N. 35th St. to 200' n/o W. Hampton Ave. N. Humboldt Bd. - E. Brady St. to E. Kane Pl. E. Kane Pl. - N. Warren Ave. to N. Humboldt Ave. N. Prospect Ave. - E. Locust St. to E. Kenwood Blvd. N. Water St. - E. Brady St. to N. Humboldt Ave.
04/04/2019 03:30 PM UTC
OFFICIAL NOTICE 56-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190101 – 2019 ADA Ramps for High Impact Paving Projects at Various Northside Locations
04/04/2019 03:30 PM UTC
741 - 750 of 1532 Solicitations
1 2 71 72 73 75 77 78 79 153 154