General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 83-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE PAVEMENT, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150112 – N. 87th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave.
07/19/2018 03:30 PM UTC
OFFICIAL NOTICE 80-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211140127 – W. Carmen Ave. – N. 68th St. to N. 76th St.
07/18/2018 03:30 PM UTC
OFFICIAL NOTICE 72-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212140103 – Alley Bounded By: W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., & N. 53rd St. (Permeable Alley) ST212160101 – Alley Bounded By: W. Auer Ave., W. Hopkins St., N. 23rd St., N. 24th St.
07/13/2018 03:30 PM UTC
OFFICIAL NOTICE 71-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST 212070113 – Alley Bounded By: W. Forest Home Ave., W. Ohio Ave., W. Oklahoma Ave., S. 43rd St., S. 44th St. - City Limits ST212160109 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 7th St., S. 8th St. ST212160108 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 8th St., S. 9th St. ST212160107 – Alley Bounded By: W. Cleveland Ave., S. 15th Pl., S. 16th St., KK River.
07/12/2018 03:30 PM UTC
OFFICIAL NOTICE 92-1-2018
PROJECT NO. 1: GREEN STREET BIOSWALES: Located at: S. 76th St. – 485' +/- South of W. Van Beck Ave to 190' +/- South of W. Ohio Ave.
07/11/2018 03:30 PM UTC
OFFICIAL NOTICE 102-1-2018
Milwaukee Fire Department Head Quarters Curtain Wall Refinishing 711 West Wells Street Milwaukee WI
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 90-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180104 - N. 41st St. - W. Meinecke Ave. to W. Wright St. ST211180116 - N. 52nd St. – W. Lisbon Ave. to W. Center St.
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 99-1-2018
WATER MAIN RELAYS at the following locations: S. 18th St (WT410180625), W. Whitaker Ave. to W. Bottsford Ave. (10 working days); W. Whitaker Ave. (WT410180626), 360’ E/O S. 18th St to S 18th St. (10 working days); S. Logan Ave (WT410180632), S. Whitnall Ave to E. Price Ct. (58 working days); E. Van Norman Ave (WT410180633), S. Lenox St to S. Logan Ave. (10 working days). (Note: Contractor to furnish and install approximately 3,856 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/09/2018 03:30 PM UTC
OFFICIAL NOTICE 103-1-2018
WATER MAIN RELAYS at the following locations: W. Fairmount Ave. (WT410180646), N. 47th St. to 30 Ft. E/O N. 48th St. (10 working days); N. 47th St. (W/S) (WT410180647), W. Fairmount Ave. to W. Villard Ave. (38 working days); N. 48th St. (WT410180648), W. Luscher Ave. to W. Fairmount Ave. (24 working days); W. Luscher Ave. (WT410180649), N. 48th St. to N. 49th St. (10 working days); N. 49th St. (WT410180650), W. Luscher Ave. to W. Eggert Pl. (69 working days). (Note: Contractor to furnish and install approximately 5,017 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2018 03:30 PM UTC
OFFICIAL NOTICE 81-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180113 - N. Summit Ave. - E. Locust Ave. to E. Kenwood Blvd.
06/29/2018 03:30 PM UTC
741 - 750 of 1443 Solicitations
1 2 71 72 73 75 77 78 79 144 145