General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 42-1-2019
PROJECT NO. 1: BIOSWALES IN: W. Nash St. – W. Potomac Ave. to N. 76th St. Plan Files: 252-56 through 252-60, and 198-5-120 Dated: 02/19/2019 Project ID: SM499160102 W. Keefe Ave. – N. 63rd St. to N. 67th St. Plan Files: 252-11 through 252-13, 252-56, 252-57, Dated: 02/19/2019 and 198-5-120 Project ID: SM499180005
06/06/2019 03:30 PM UTC
OFFICIAL NOTICE 41-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180236) – N. 5th St. – W. Clarke St. to W. Center St. (1 speed hump) (ST211160154) – N. 6th St. – W. Locust St. to W. Burleigh St. (2 speed humps) (ST211180247) – S. 14th St. – W. Dakota St. to a pt. North of W. Dakota St. (1 speed hump) (ST211180259) – N. 15th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180139) – N. 21st St. – W. Vienna Ave. to W. Melvina St. (1 speed hump) (ST211180272) – S. 25th St. – W. Scott St. to W. Mineral St. (1 speed hump) (ST211180270) – S. 25th St. – W. National Ave. to W. Pierce St. (1 speed hump) (ST211170156) – N. 25th St. – W. Atkinson Ave. to W. Ruby Ave. (3 speed humps) (ST211180232) – N. 26th St. – W. Atkinson Ave. to W. Ruby Ave. (3 speed humps) (ST211180261) – N. 26th St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211180282) – N. 29th St. – W. Lisbon Ave. to W. Vine St. (1 speed hump) (ST211180263) – N. 37th St. – W. Custer Ave. to W. Sheridan Ave. (1 speed hump) (ST211190108) – N. 39th St. – W. Hadley St. to W. Locust St. (1 speed hump) (ST211180285) – N. 40th St. – W. Keefe Ave. to W. Nash St. (1 speed hump) (ST211180264) – N. 41st St. – W. Glendale Ave. to W. Courtland Ave. (1 speed hump) (ST211190109) – N. 45th St. – W. Auer Ave. to W. Concordia Ave. (1 speed hump) (ST211180240) – N. 49th St. – W. Burleigh St. to W. Concordia Ave. (2 speed humps) (ST211180241) – N. 52nd St. – W. Meinecke Ave. to W. Center St. (3 speed humps) (ST211180242) – N. 56th St. – W. Clarke St. to W. Center St. (1 speed hump) (ST211180288) – N. 58th St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211180228) – N. Booth St. – E. Glover St. to E. Meinecke Ave. (4 speed humps) (ST211170130) – W. Carmen Ave. – N. 72nd St. to N. 73rd St. (1 speed hump) (ST211180233) – W. Congress St. – N. Teutonia Ave. to N. 25th St. (1 speed hump) (ST211180174) – N. Norwood Pl. – W. Auer Ave./W. Louise Pl. to W. Roosevelt Dr. (1 speed hump) (ST211180234) – W. Ruby Ave. – N. Teutonia Ave. to N. 27th St. (2 speed humps) (ST211180127) – S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211181140) – N. 26th St. – W. Auer Ave. to W. Concordia Ave. (1 speed hump) (ST214190102) – N. 41st St. – W. Roosevelt Dr. to W. Capitol Dr. (2 speed humps – developer deposit)
06/05/2019 03:30 PM UTC
OFFICIAL NOTICE 72-1-2019
MILWAUKEE FIRE DEPARTMENT REPAIR SHOP ADDITION 100 WEST VIRGINIA STREET MILWAUKEE WI 53204
06/04/2019 03:30 PM UTC
OFFICIAL NOTICE 5-1-2019
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY, NEW STORM SEWER MAIN CONSTRUCTION, & SANITARY SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: N. 13th St. – W. Nash St. to W. Abert Pl. N. 17th St. – W. Nash St. to W. Vienna Ave. W. Nash St. – 160’ +/- East of N. 17th St. to N. 18th St. N. 68th St. – 45’ +/- South of W. Congress St. to W. Ruby Ave. N. 75th St. – W. Chambers St. to 435’ +/- North of W. Chambers St. N. Edgeworth Dr. – 35’ +/- Northwest of W. Port Ave. to 140’ +/- Northwest of N. 57th St. W. Florist Ave. – N. 55th St. to 850’ +/- West of N. 55th St.
05/24/2019 03:30 PM UTC
OFFICIAL NOTICE 5-2-2019
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY, NEW STORM SEWER MAIN CONSTRUCTION AND COMBINED SEWER MAIN LINING AND MANHOLE REPAIR & LINING in: N. 37th St. – W. Keefe Ave. to W. Nash St. N. 38th St. – W. Wright St. to W. Center St. W. Clarke St. – N. 38th St. to N. 39th St. N. 44th St. – W. Concordia Ave. to 355’+/- North of W. Concordia Ave. N. 52nd St. – W. Bluemound Rd. to W. Wisconsin Ave. W. Wisconsin Ave. – N. 51st St. to N. 53rd St.
05/24/2019 03:30 PM UTC
OFFICIAL NOTICE 75-1-2019
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
05/21/2019 03:30 PM UTC
OFFICIAL NOTICE 60-1-2019
REMOTE CONTROL OPERATION OF WELLS STREET BRIDGE (B-40-0544) OVER THE MILWAUKEE RIVER
05/16/2019 03:30 PM UTC
OFFICIAL NOTICE 48-1-2019
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: W. Pierce St. (WT410160649), S. 9th St. to S. 10th St. (16 working days); S. 10th St. (WT410160661), W. Burnham St. to W. Rogers St. (39 working days); W. Burnham St. (WT410160662), S. 10th St. to S. 11th St. (13 working days); W. Stark St. (WT410160665), N. 36th St. to N. 37th St. (10 working days); N. 37th St. (WT410160666), W. Hampton Ave. to W. Fairmount Ave. (65 working days); Lead Service Line Replacements (WK64409154), at multiple locations throughout the project limits (working days included in individual relay projects). (Note: Contractor to furnish and install approximately 3,234 lin. ft. of 8” and 6” ductile iron pipe and perform approximately 94 Lead Service Line Replacements installing approximately 1,654 lin. ft. of copper water service, Private Side Only. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/15/2019 03:30 PM UTC
OFFICIAL NOTICE 73-1-2019
LOCAL RIGHT OF WAYS MOWING ADJOINING STATE HIGHWAYS. Areas to be mowed include multiple local street rights of way segments adjoining state highways I-43, I-94, I-41, 145, and 175.
05/14/2019 03:30 PM UTC
OFFICIAL NOTICE 64-1-2019
BIOSWALES IN: W. Parnell Ave. from S. 27th St. to W. Ramsey Ave. Plan File: 251-30,251-31, 251-54 through 251-56, 198-5-117 Dated: 04/10/2019 Project ID: SM499180002 S. Marilyn St. from W. Ramsey Ave. to W. Iona Ter. Plan File: 251-29 through 251-33, 198-5-117 Dated: 04/10/2019 Project ID: SM499180003
05/13/2019 03:30 PM UTC
741 - 750 of 1553 Solicitations
1 2 71 72 73 75 77 78 79 155 156