General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 56-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190101 – 2019 ADA Ramps for High Impact Paving Projects at Various Northside Locations
04/04/2019 03:30 PM UTC
OFFICIAL NOTICE 49-1-2019
2019 SANITARY MANHOLE REHABILITATION PROJECT
04/03/2019 03:30 PM UTC
OFFICIAL NOTICE 49-2-2019
SANITARY MANHOLE AND SEWER STRUCTURES INSPECTION: Located at: Various Locations
04/03/2019 03:30 PM UTC
OFFICIAL NOTICE 23-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180112 – S. Massachusetts Ave. - W. Duluth Ave. to W. Morgan Ave. ST211150136 – W. Eden Pl. - S. 8th St. to S. 11th St.
04/02/2019 03:30 PM UTC
OFFICIAL NOTICE 59-1-2019
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
04/02/2019 03:30 PM UTC
OFFICIAL NOTICE 40-1-2019
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: N. 92nd St. (WT410190003), W. Auer Ave. to W. Concordia Ave. (23 working days); N. 42nd St. (WT410160618), W. Glendale Ave. to W. Peck Pl. (20 working days); N. 38th St. (WT410160619), W. Glendale Ave. to W. Courtland Ave. (36 working days); N. 39th St. (WT410190003), W. Ruby Ave. to W. Courtland Ave. (64 working days). (Note: Contractor to furnish and install approximately 2,482 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/01/2019 03:30 PM UTC
OFFICIAL NOTICE 18-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190106 – S. 14th St. - W. Edgerton Ave. to W. Foster Ave. S. 14th St. - W. Parnell Ave. to W. Grange Ave. S. 54th St. - W. Wilbur Ave. to W. Midland Ave. W. Abbott Ave. - S. 18th St. to S. 19th St. W. Carpenter Ave. - S. 20th St. to S. 27th St. W. Foster Ave. - S. 14th St. to S. 15th Pl. W. Honey Creek Dr. - W. River Bend Dr. to W. Morgan Ave. S. Pine Ave. - E. Layton Ave. to S. Whitnall Ave. S. Pine Ave. - E. Oklahoma Ave. to E. Holt Ave. W. Wilbur Ave. - S. 54th St. to City limits.
03/29/2019 03:30 PM UTC
OFFICIAL NOTICE 3-1-2019
COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING Located at: N. Broadway – E. Highland Ave. to E. Juneau Ave. E. Highland Ave. - N. Market St. to N. Broadway N. Broadway - E. Kilbourn Ave. to 150’ +/- S. of E. Highland Ave.
03/27/2019 03:30 PM UTC
OFFICIAL NOTICE 3-2-2019
COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING, MANHOLE REPAIR AND LINING, AND ABANDONMENT OF SEWERS Located at: N. 7th St. – W. Clarke St. to W. Center St. W. Center St. – N. Martin Luther King Jr. Dr. to N. 7th St. N. Vel Phillips Ave. - W. Clark St. to W. Hadley St. Abandonment of Sewers at Intersection of W. Garfield Ave. and W. Teutonia Ave.
03/27/2019 03:30 PM UTC
OFFICIAL NOTICE 27-1-2019
OFFICE OF AFRICAN AMERICAN AFFAIRS REROOFING 4830 W FOND DU LAC AVENUE MILWAUKEE WI
03/25/2019 03:30 PM UTC
771 - 780 of 1553 Solicitations
1 2 74 75 76 78 80 81 82 155 156