General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 88-1-2026
PROJECT NO. 1: COMBINED SEWER MAIN RELAY Located at: W. Keefe Ave. – N. 13th St. to N. 17th St.
10/19/2026 03:30 PM UTC
OFFICIAL NOTICE 84-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
10/30/2026 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 68-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190157 - Area 1 - 2019 Sidewalk Replacements Area Bounded By: E. Locust St., N. Maryland Ave., E. Kenwood Blvd., to N. Downer St.
06/25/2019 03:30 PM UTC
OFFICIAL NOTICE 69-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET REPAIR, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190158 - Area 2 - 2019 Sidewalk Replacements Area Bounded By: N. 47th St., W. Vliet St., N. 50th St. / N. Hi Mount Blvd., to W. Vine St.
06/25/2019 03:30 PM UTC
OFFICIAL NOTICE 82-1-2019
DINEEN PARK STORMWATER DETENTION AND PARK IMPROVEMENTS IN: Area bounded by W. Melvina St., W. Keefe Ave., N. 62nd St., and W. Appleton Ave.
06/24/2019 03:30 PM UTC
OFFICIAL NOTICE 50-1-2019
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; Located at: ST211190132 - Various Street Locations within the City of Milwaukee
06/18/2019 03:30 PM UTC
OFFICIAL NOTICE 81-1-2019
BIOSWALES IN: W. Parnell Ave. from S. 27th St. to W. Ramsey Ave. Plan File: 251-30,251-31, 251-54 through 251-56, 198-5-117 Dated: 04/10/2019 Project ID: SM499180002 S. Marilyn St. from W. Ramsey Ave. to W. Iona Ter. Plan File: 251-29 through 251-33, 198-5-117 Dated: 04/10/2019 Project ID: SM499180003
06/14/2019 03:30 PM UTC
OFFICIAL NOTICE 55-1-2019
Water Main Relays at the following locations: W. Colfax Ct. (WT410190645), W. Kathryn Av. to 500' W/O W. Kathryn Av. (15 working days); W. Gertrude Dr. / W. Lancaster Av. (WT410190646), W. Palmetto Ave. to N. 83rd St. (51 working days); N. 83rd St. (WT410190647), W. Fairmount Av. to W. Sheridan Av. (64 working days); W. Herbert Av. (WT410190648), W. Kathryn Av. to N. 84th St. (67 working days); W. Kathryn Av. / W. Fairmount Av. (WT410190649), N. 77th St. to N. 84th St. (68 working days); W. Kathryn Ct. (WT410190650), W. Kathryn Av. to 225' W/O W. Kathryn Av. (10 working days); N. 82nd St. (WT410190651), W. Grantosa Dr. to W. Kathryn Av. (14 working days); Note: Contractor to furnish and install approximately 11,150 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.
06/13/2019 03:30 PM UTC
OFFICIAL NOTICE 83-1-2019
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
06/10/2019 03:30 PM UTC
OFFICIAL NOTICE 57-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180105 –N. 49th St. - W. Villard Ave. to W. Custer Ave. ST211050111 –N. 39th St. - W. Ruby Ave. to W. Courtland Ave.
06/07/2019 03:30 PM UTC
OFFICIAL NOTICE 42-1-2019
PROJECT NO. 1: BIOSWALES IN: W. Nash St. – W. Potomac Ave. to N. 76th St. Plan Files: 252-56 through 252-60, and 198-5-120 Dated: 02/19/2019 Project ID: SM499160102 W. Keefe Ave. – N. 63rd St. to N. 67th St. Plan Files: 252-11 through 252-13, 252-56, 252-57, Dated: 02/19/2019 and 198-5-120 Project ID: SM499180005
06/06/2019 03:30 PM UTC
OFFICIAL NOTICE 41-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180236) – N. 5th St. – W. Clarke St. to W. Center St. (1 speed hump) (ST211160154) – N. 6th St. – W. Locust St. to W. Burleigh St. (2 speed humps) (ST211180247) – S. 14th St. – W. Dakota St. to a pt. North of W. Dakota St. (1 speed hump) (ST211180259) – N. 15th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180139) – N. 21st St. – W. Vienna Ave. to W. Melvina St. (1 speed hump) (ST211180272) – S. 25th St. – W. Scott St. to W. Mineral St. (1 speed hump) (ST211180270) – S. 25th St. – W. National Ave. to W. Pierce St. (1 speed hump) (ST211170156) – N. 25th St. – W. Atkinson Ave. to W. Ruby Ave. (3 speed humps) (ST211180232) – N. 26th St. – W. Atkinson Ave. to W. Ruby Ave. (3 speed humps) (ST211180261) – N. 26th St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211180282) – N. 29th St. – W. Lisbon Ave. to W. Vine St. (1 speed hump) (ST211180263) – N. 37th St. – W. Custer Ave. to W. Sheridan Ave. (1 speed hump) (ST211190108) – N. 39th St. – W. Hadley St. to W. Locust St. (1 speed hump) (ST211180285) – N. 40th St. – W. Keefe Ave. to W. Nash St. (1 speed hump) (ST211180264) – N. 41st St. – W. Glendale Ave. to W. Courtland Ave. (1 speed hump) (ST211190109) – N. 45th St. – W. Auer Ave. to W. Concordia Ave. (1 speed hump) (ST211180240) – N. 49th St. – W. Burleigh St. to W. Concordia Ave. (2 speed humps) (ST211180241) – N. 52nd St. – W. Meinecke Ave. to W. Center St. (3 speed humps) (ST211180242) – N. 56th St. – W. Clarke St. to W. Center St. (1 speed hump) (ST211180288) – N. 58th St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211180228) – N. Booth St. – E. Glover St. to E. Meinecke Ave. (4 speed humps) (ST211170130) – W. Carmen Ave. – N. 72nd St. to N. 73rd St. (1 speed hump) (ST211180233) – W. Congress St. – N. Teutonia Ave. to N. 25th St. (1 speed hump) (ST211180174) – N. Norwood Pl. – W. Auer Ave./W. Louise Pl. to W. Roosevelt Dr. (1 speed hump) (ST211180234) – W. Ruby Ave. – N. Teutonia Ave. to N. 27th St. (2 speed humps) (ST211180127) – S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211181140) – N. 26th St. – W. Auer Ave. to W. Concordia Ave. (1 speed hump) (ST214190102) – N. 41st St. – W. Roosevelt Dr. to W. Capitol Dr. (2 speed humps – developer deposit)
06/05/2019 03:30 PM UTC
791 - 800 of 1611 Solicitations
1 2 … 76 77 78 80 82 83 84 … 161 162