General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 53-3-2018
SANITARY SEWER MAIN REPAIR AND LINING & SANITARY MANHOLE REPAIR AND LINING IN: Area Bounded By N. Hawley Rd. to N. Honey Creek Pkwy. and W. Bluemound Rd. to W. Dickenson St.
11/30/2018 04:30 PM UTC
OFFICIAL NOTICE 119-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211140127 – W. Carmen Ave. – N. 68th St. to N. 76th St.
11/02/2018 03:30 PM UTC
OFFICIAL NOTICE 121-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150108 – S. 19th St. - W. Edgerton Ave. to 100’ n/o W. Halsey Ave. ST211150107 – S. 16th St. – W. Edgerton Ave. to 300’ n/o W. Holmes Ave. (Incl: W. Vogel Ave.)
11/01/2018 03:30 PM UTC
OFFICIAL NOTICE 52-1-2018
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING IN: N. 27th St. – 230’+/- N. of W. Brown St. to W. Lloyd St. N. 28th St. – 110’+/- N. of W. Elder Wallace Dr. to 307’+/- N. of W. Elder Wallace Dr. N. 31st St. – W. Garfield Ave. to W. North Ave. N. Bremen St. – 300’+/- S. of E. Concordia Ave. to E. Townsend St. N. Dousman St. – 100’+/- N. of E. Auer Ave. to 475’+/- N. of E. Auer Ave. W. Michigan St. – N. 28th St. to N. 29th St.
10/31/2018 03:30 PM UTC
OFFICIAL NOTICE 130-1-2018
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
10/31/2018 03:30 PM UTC
OFFICIAL NOTICE 129-1-2018
20 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
10/31/2018 03:30 PM UTC
OFFICIAL NOTICE 120-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211070132 – S. 91st St. - 300'+/- s/o W. Adler St. to W. Adler St. ST211180114 – W. Verona Ct. - S. 77th St. to S. 70th St. ST211180115 – S. 28th St. - W. National Ave. to W. Pierce St. ST211180106 – S. 54th ST. - W. Midland Dr. to W. Forest Home Ave. (Incl: W. Midland Dr. – S. 54th St. to Greenfield City Limits)
10/30/2018 03:30 PM UTC
OFFICIAL NOTICE 108-1-2018
Rehabilitation of the Kilbourn Tunnels.
10/25/2018 03:30 PM UTC
OFFICIAL NOTICE 111-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: N. 73rd St. - W. Capitol Dr. to W. Congress St. N. 80th St. – W. Townsend St. to W. Keefe Ave. (Incl. N. Walton Pl. -W. Lisbon Av. to W. Townsend St.)
10/19/2018 03:30 PM UTC
OFFICIAL NOTICE 112-1-2018
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180118 - W. Locust St. - N. 29th St. to W. Fond Du Lac Ave.
10/11/2018 03:30 PM UTC
791 - 800 of 1532 Solicitations
1 2 76 77 78 80 82 83 84 153 154