General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 7-1-2026
PROJECT NO. 1: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. S. 12th St. – W. Manitoba St. to W. Oklahoma Ave. W. Manitoba St. – S. 6th St. to S. 12th St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 7-2-2026
PROJECT NO.2: COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING E. Erie St. – 150’+/- NW. of N. Broadway to N. Broadway E. Menomonee St. – N. Broadway to N. Jefferson St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 71-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: ST230190160 - Scatter Sites Sidewalk Replacements – 2019 At Various Locations City Wide
06/27/2019 03:30 PM UTC
OFFICIAL NOTICE 6-1-2019
COMBINED SEWER MAIN RELAY AND COMBINED SEWER MAIN LINING AND MANHOLE REPAIR & LINING in: E. Belleview Pl. – N. Oakland Ave. to N. Maryland Ave. N. Cambridge Ave. – E. Linnwood Ave. to 220’+/- N. of E. Kenwood Blvd. N. Cramer St. – E. Bradford Ave. to 200’+/- S. of E. Park Pl. N. Cramer St. – E. Locust St. to E. Linnwood Ave. E. Newport Ave. – N. Hackett Ave. to N. Summit Ave. E. Webster Pl. – N. Oakland Ave. to N. Maryland Ave.
06/26/2019 03:30 PM UTC
OFFICIAL NOTICE 6-2-2019
STORM SEWER MAIN RELAY in: W. Verona Ct. – Honey Creek Outfall to S. Honey Creek Dr. W. Verona Ct. – S. 69th St. to Honey Creek Outfall
06/26/2019 03:30 PM UTC
OFFICIAL NOTICE 6-3-2019
COMBINED SEWER MAIN LINING AND MANHOLE REPAIR & LINING in: Alley W. of N. Vel R. Phillips Ave. – W. St. Paul Ave. to 200’+/- N. of W. St. Paul Ave. W. Clybourn St. – N. 6th St. to N. James Lovell St. W. St. Paul Ave. – N. Vel R. Phillips Ave. to N. 6th St.
06/26/2019 03:30 PM UTC
OFFICIAL NOTICE 6-4-2019
SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING in: Area Bounded By W. Congress St. to W. Villard Ave. and N. 60th St. to N. 91st St.
06/26/2019 03:30 PM UTC
OFFICIAL NOTICE 68-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190157 - Area 1 - 2019 Sidewalk Replacements Area Bounded By: E. Locust St., N. Maryland Ave., E. Kenwood Blvd., to N. Downer St.
06/25/2019 03:30 PM UTC
OFFICIAL NOTICE 69-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET REPAIR, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190158 - Area 2 - 2019 Sidewalk Replacements Area Bounded By: N. 47th St., W. Vliet St., N. 50th St. / N. Hi Mount Blvd., to W. Vine St.
06/25/2019 03:30 PM UTC
OFFICIAL NOTICE 82-1-2019
DINEEN PARK STORMWATER DETENTION AND PARK IMPROVEMENTS IN: Area bounded by W. Melvina St., W. Keefe Ave., N. 62nd St., and W. Appleton Ave.
06/24/2019 03:30 PM UTC
OFFICIAL NOTICE 50-1-2019
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; Located at: ST211190132 - Various Street Locations within the City of Milwaukee
06/18/2019 03:30 PM UTC
OFFICIAL NOTICE 81-1-2019
BIOSWALES IN: W. Parnell Ave. from S. 27th St. to W. Ramsey Ave. Plan File: 251-30,251-31, 251-54 through 251-56, 198-5-117 Dated: 04/10/2019 Project ID: SM499180002 S. Marilyn St. from W. Ramsey Ave. to W. Iona Ter. Plan File: 251-29 through 251-33, 198-5-117 Dated: 04/10/2019 Project ID: SM499180003
06/14/2019 03:30 PM UTC
781 - 790 of 1606 Solicitations
1 2 75 76 77 79 81 82 83 160 161