General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 83-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE PAVEMENT, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150112 – N. 87th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave.
07/19/2018 03:30 PM UTC
OFFICIAL NOTICE 80-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211140127 – W. Carmen Ave. – N. 68th St. to N. 76th St.
07/18/2018 03:30 PM UTC
OFFICIAL NOTICE 72-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212140103 – Alley Bounded By: W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., & N. 53rd St. (Permeable Alley) ST212160101 – Alley Bounded By: W. Auer Ave., W. Hopkins St., N. 23rd St., N. 24th St.
07/13/2018 03:30 PM UTC
OFFICIAL NOTICE 71-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST 212070113 – Alley Bounded By: W. Forest Home Ave., W. Ohio Ave., W. Oklahoma Ave., S. 43rd St., S. 44th St. - City Limits ST212160109 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 7th St., S. 8th St. ST212160108 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 8th St., S. 9th St. ST212160107 – Alley Bounded By: W. Cleveland Ave., S. 15th Pl., S. 16th St., KK River.
07/12/2018 03:30 PM UTC
OFFICIAL NOTICE 92-1-2018
PROJECT NO. 1: GREEN STREET BIOSWALES: Located at: S. 76th St. – 485' +/- South of W. Van Beck Ave to 190' +/- South of W. Ohio Ave.
07/11/2018 03:30 PM UTC
OFFICIAL NOTICE 102-1-2018
Milwaukee Fire Department Head Quarters Curtain Wall Refinishing 711 West Wells Street Milwaukee WI
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 90-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180104 - N. 41st St. - W. Meinecke Ave. to W. Wright St. ST211180116 - N. 52nd St. – W. Lisbon Ave. to W. Center St.
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 99-1-2018
WATER MAIN RELAYS at the following locations: S. 18th St (WT410180625), W. Whitaker Ave. to W. Bottsford Ave. (10 working days); W. Whitaker Ave. (WT410180626), 360’ E/O S. 18th St to S 18th St. (10 working days); S. Logan Ave (WT410180632), S. Whitnall Ave to E. Price Ct. (58 working days); E. Van Norman Ave (WT410180633), S. Lenox St to S. Logan Ave. (10 working days). (Note: Contractor to furnish and install approximately 3,856 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/09/2018 03:30 PM UTC
OFFICIAL NOTICE 103-1-2018
WATER MAIN RELAYS at the following locations: W. Fairmount Ave. (WT410180646), N. 47th St. to 30 Ft. E/O N. 48th St. (10 working days); N. 47th St. (W/S) (WT410180647), W. Fairmount Ave. to W. Villard Ave. (38 working days); N. 48th St. (WT410180648), W. Luscher Ave. to W. Fairmount Ave. (24 working days); W. Luscher Ave. (WT410180649), N. 48th St. to N. 49th St. (10 working days); N. 49th St. (WT410180650), W. Luscher Ave. to W. Eggert Pl. (69 working days). (Note: Contractor to furnish and install approximately 5,017 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2018 03:30 PM UTC
OFFICIAL NOTICE 81-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180113 - N. Summit Ave. - E. Locust Ave. to E. Kenwood Blvd.
06/29/2018 03:30 PM UTC
851 - 860 of 1553 Solicitations
1 2 82 83 84 86 88 89 90 155 156