We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 006-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY IN: Located at: S. 69th St. – 325' +/- North of W. Cleveland Ave. to 70' +/- North of W. Cleveland Ave. S. Austin St. – E. Norwich St. to 300' +/- South of E. Norwich St. S. Burrell St. – E. Norwich St. to 300' +/- South of E. Norwich St. E. Euclid Ave. – S. Mabbett Ave. to S. Pennsylvania Ave. E. Norwich St. - 100' +/- West of S. Burrell St. to S. Whitnall Ave.
06/26/2018 03:30 PM UTC
OFFICIAL NOTICE 100-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
06/22/2018 03:30 PM UTC
OFFICIAL NOTICE 31-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180126) N. 25th St. – W. Melvina St. to W. Capitol Dr. (1 speed hump) (ST211180140) N. 26th St. – W. Auer Ave. to W. Townsend St. (2 speed humps) (ST211170191) N. 26th Sr. – W. Hope Ave. to W. Roosevelt Dr. (1 speed hump) (ST211180147) N. 33rd St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211170129) N. 37th St. – W. Lloyd St. to W. Garfield Ave. (1 speed hump) (ST211180151) N. 44th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180152) N 45th St. – W. Glendale Ave. to W. Hampton Ave. (3 speed humps) (ST211170148) N. 47th St. – W. Hampton Ave. to W. Fairmount Ave. (2 speed humps) (ST211180129) N. 48th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180154) N. 48th St. – W. Villard Ave. to W. Rohr Ave. (1 speed hump) (ST211180143) N. 63rd St. – W. Capitol Dr. to W. Fiebrantz Ave. (1 speed hump) (ST211180145) S. 7th St. – W. Becher St. to W. Rogers St. (1 speed hump) (ST211160127) S. 7th St. – W. Lincoln Ave. to W. Becher St. (2 speed humps) (ST211180123) S. 7th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180138) S. 18th St. – W. Arthur Ave. to W. Hayes Ave. (2 speed humps) (ST211180125) S. 18th St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211180127) S. 29th St. – W. Lincoln Ave. to W. Grant St. (1 speed hump) (ST211180128) S. 30th St. – W. Hayes Ave. to W. Arthur Ave. (1 speed hump) (ST211180141) S. 31st St. – W. Scott St. to W. National Ave. (2 speed humps) (ST211180130) W. Chambers St. – N. 26th St. to N. 27th St. (1 speed hump) (ST211170163) W. Fairmount Ave. – N. 24th St. to N. 27th St. (4 speed humps) (ST211170164) W. Fairmount Ave. – N. Green Bay Ave. to N. 24th St. (5 speed humps)
06/20/2018 03:30 PM UTC
OFFICIAL NOTICE 88-1-2018
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING IN: Alley W. of S. 2nd St. – W. Oregon St. to 125’ +/- S. of W. Oregon St.
06/15/2018 03:30 PM UTC
OFFICIAL NOTICE 91-1-2018
WATER MAIN RELAYS at the following locations: N. 57th St. (WT410180624), W. Villard Ave. to W. Sheridan Ave. (48 working days); W. Villard Ave. (WT410180644), N. 56th St. to N. 60th St. (38 working days); N. 57th St. (WT410180645), W. Hampton Ave. to W. Villard Ave. (59 working days). (Note: Contractor to furnish and install approximately 6,054 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/14/2018 03:30 PM UTC
OFFICIAL NOTICE 101-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
06/14/2018 03:30 PM UTC
OFFICIAL NOTICE 74-1-2018
CONSTRUCTION OF 5 INCH CONCRETE WALKS, CONCRETE WALK W/INTEGRAL CURB, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: ST230180155: Area Wide Sidewalk Replacements - 2018 ABB: W. North Av., N 32nd St., W. Meinecke Av. & N. 35th St. ABB: W. Mitchell St., S. 11th St., W. Becher St. & S. 13th St. ABB: W. Cleveland Av., S 47th St., W Oklahoma Av. & S. 51st St. And Various School Locations
06/13/2018 03:30 PM UTC
OFFICIAL NOTICE 86-1-2018
WATER MAIN RELAYS at the following locations: W. Lincoln Ave. (S/S) (WT410170696), at S. 37th St. (10 working days); S. 24th St. (WT410180608), W. Warnimont Ave. to W. Wilbur Ave. (19 working days); S. 52nd St. (WT410180619), W. Crawford Ave. to W. Howard Ave. (20 working days); W. Crawford Ave. (WT410180620), S. 51st St. to S. 53rd St., (15 working days); E. Tripoli Ave. (WT410180665), S. Clement Ave. to S. Hanson Ave. (16 working days); S. Griffin Ave. (WT410180693), 620 Ft. N/O E. Howard Ave. to E. Howard Ave. (19 working days); S. Quincy Ave./S. Quincy Ct. (WT410180694), E. Morgan Ave. to 215 Ft. S/O E. Wilbur Ave. (33 working days). Note: Contractor to furnish and install approximately 4,639 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/07/2018 03:30 PM UTC
OFFICIAL NOTICE 39-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180108 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice No.’s 14-2018, 15-2018, & 16-2018: O.N. # 14-2018 Locations: North Bartlett Avenue – East Locust Street to East Kenwood Boulevard North Bartlett Avenue – East Kenwood Boulevard to East Providence Avenue East/West Burleigh Street – North Holton Street to North 7th Street West Hopkins Street/North 31st Street – North 27th Street to West Capitol Drive North Sherman Boulevard – West Congress Street to West Hampton Avenue O.N. # 15-2018 Locations: North 84th Street – West Center Street to West Burleigh Street West Burleigh Street – North 92nd Street to City Limits (Menomonee River) West Center Street- North 60th Street to North 76th Street West Locust Street – North 51st Street to North 60th Street North 55th Street – West Burleigh Street to West Louise Place North Norwood Place – West Louise Place to West Philip Place North Humboldt Boulevard – West Keefe Avenue to West Capitol Drive O.N. # 16-2018 Locations: North 51st Boulevard – West Hampton Avenue to West Silver Spring Drive North 51st Boulevard – West Good Hope Road to West Calumet Road West Fond du Lac Avenue – West Silver Spring Drive to a point West of North 87th Street West Granville Road – West Bradley Road to North 107th Street West Hampton Avenue – North 60th Street to North 68th Street
06/06/2018 03:30 PM UTC
OFFICIAL NOTICE 64-1-2018
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; Located at: ST211180169 - Various Street Locations within the City of Milwaukee