We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 70-1-2018
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods. All locations will be emergency service line replacements due to a leak or failure. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
04/18/2018 03:30 PM UTC
OFFICIAL NOTICE 47-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.
04/17/2018 03:30 PM UTC
OFFICIAL NOTICE 49-1-2018
COUNTING, PROCESSING AND DEPOSITING PARKING METER COIN COLLECTIONS FOR THE CITY'S APRROXIMATELY 7,000+ PAID PARKING METER SPACES
04/10/2018 03:30 PM UTC
OFFICIAL NOTICE 063-1-2018
GREEN STREET BIOSWALES IN: W. Mill Rd. – 26’ ± East of N. 46th St. to 300” ± East of N. 89th St. & W. Good Hope Rd. – 110” ± East of N. Granville Rd to 200” ± East of N. 97th St.
04/05/2018 03:30 PM UTC
OFFICIAL NOTICE 003-1-2018
PROJECT NO. 1: COMBINED SEWER MAIN RELAY: Located at: N. 11th St. – W. Keefe Ave. to W. Finn Pl. N. 12th St. – W. Atkinson Ave. to W. Abert Pl. N .14th St. – 480’ +/- S of W. Ring St. to W. Concordia Ave. N. 18th St. – 115’ S of W. Galena St. to W. Galena St. W. Groeling Ave. – N. 13th St. to N. 14th St.
04/04/2018 03:30 PM UTC
OFFICIAL NOTICE 003-2-2018
COMBINED SEWER MAIN SLIP LINING AND MANHOLE REPAIR AND LINING: Located at: N. 26th St. (E/S) – W. Walnut St. to 200' +/- North of W. North Ave.
04/04/2018 03:30 PM UTC
OFFICIAL NOTICE 60-1-2018
LOCAL RIGHT OF WAYS MOWING ADJOINING STATE HIGHWAYS. Areas to be mowed include multiple local street rights of way segments adjoining state highways I-43, I-94, I-41, 145, and 175.
04/03/2018 03:30 PM UTC
OFFICIAL NOTICE 21-1-2018
2018 CITY WIDE BIO-RETENTION FACILITY MAINTENANCE. Located at: Various locations throughout the City
03/19/2018 03:30 PM UTC
OFFICIAL NOTICE 45-1-2018
WATER MAIN RELAYS at the following locations: S. 70th St. (2018-611), W. Euclid Ave. to 160' S/O W. Ohio Ave. (31 working days); W. Euclid Ave. (2018-612), S. 68th St. to S. 70Th St. (23 working days); W. Montana St. (2018-618), S. 55th St. to S. 58th St. (38 working days); S. 84th St. (2018-627), W. Morgan Ave. to W. Warnimont Ave. (22 working days); S. 75th St. (2018-682), W. Verona Ct. to W. Morgan Ave. (21 working days); S. 73rd St. (2018-683), W. Holt Ct. to W. Morgan Ave. (14 working days); S. 61st St. (2018-688), W. Montana St. to W. Oklahoma Ave. (47 working days); W. Wedgewood Dr. (2018-689), S. 68th St. to S. Honey Creek Dr. (10 working days); (Note: Contractor to furnish and install approximately 7,241 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/16/2018 03:30 PM UTC
OFFICIAL NOTICE 57-1-2018
HYDRANT ALTERATIONS & WATER MAIN ALTERATIONS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 792 lin. ft. of 16”, 12”, 8” & 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/13/2018 03:30 PM UTC