The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 57-1-2018
HYDRANT ALTERATIONS & WATER MAIN ALTERATIONS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 792 lin. ft. of 16”, 12”, 8” & 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/13/2018 03:30 PM UTC
OFFICIAL NOTICE 58-2018
WATER MAIN ALTERATIONS & RELAY at the following locations: W. Greenfield Av. (WT410170013), S. Cesar Chavez E. Dr. to S. 35th St. (38 working days (Note: Contractor to furnish and install approximately 1,314 lin. ft. of 8” & 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/13/2018 03:30 PM UTC
OFFICIAL NOTICE 8-1-2018
REHABILITATION OF THE KILBOURN TUNNELS
03/12/2018 03:30 PM UTC
OFFICIAL NOTICE 55-A-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project A: City-Owned Lot Area 2: Area bounded by North Avenue, west City limit, Capitol Drive, and North 27th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 55-B-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project B: City-Owned Lot Area 3: Area bounded by North Avenue, North 27th Street, Capitol Drive, and North 20th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 37-1-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-2-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Dr and W I-94
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-3-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 17-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180107 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice: O.N. 11-1-2018 S. 3rd St. – W. Waterford Ave. to W. Norwich St. S. 6th St. – W. Mitchell St. to W. Greenfield Ave. S. 16th St. – W. Windlake Ave. to W. Mitchell St. W. Clayton Crest Ave. – S. 14th St. to S. 15th Pl. W. Mallory Ave. – S. 13th St. to S. 15th Pl. S. Superior St. – A point South of E. Oklahoma Ave. to E Russell Ave. W. Upham Ave. – S. 14th St. to S. 15th Pl. O.N. 12-1-2018 S. 35th St. – RR Bridge South of W. Arthur Ave. to W. Lincoln Ave. S. 35th St. – W. Lincoln Ave. to W. Rogers St. S. 43rd St. – W. Forest Home Ave. to W. Cleveland Ave. W. Cleveland Ave. – S. 60th St. to City Limits (S. 72nd St.) W. Greenfield Ave. – S. 35th St. to Union Pacific Railroad Right of Way O.N. 13-1-2018 N. 4th St. – W. Wells St. to W. Kilbourn Ave. W. Cherry St. – Milwaukee River to N. 6th St. N. Jackson St. – E. Kilbourn Ave. to E. Ogden Ave. N. Milwaukee St. – E. Clybourn St. to E. Wisconsin Ave. N. Milwaukee St. – E. Wisconsin Ave. to E. Kilbourn Ave. W. North Ave. – N. 9th St. to W. Fond du Lac Ave. E. Ogden Ave. – N. Van Buren St. to N. Jackson St. N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
03/07/2018 04:30 PM UTC
OFFICIAL NOTICE 22-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211130132 - W. Juneau Ave. - N. Old World 3rd St. to N. 6th St. (also TID-48) (TD04884042) OR (TD03984000).
03/06/2018 04:30 PM UTC