Ohio Department of Rehabilitation and Correction
4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347
Mission: Reduce Recidivism Among Those We Touch
4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347
Mission: Reduce Recidivism Among Those We Touch
Name * | Description | |
---|---|---|
f110-06-equalemploymentopportunityrequirements.docx (28.6 KB) |
Equal Employment Opportunity Requirements Form
| |
m140-00_45_39-edge_affidavit_fillable.pdf (31.7 KB) |
EDGE Affidavit
| |
m140-00_45_13-bidders_qualifications.pdf (13.9 KB) |
Bidder’s Qualifications
| |
m140-00_43_13-bid_security_form.pdf (28.8 KB) |
Bid Security Form
| |
supplier_new.pdf (311 KB) |
Supplier Information Form - New Supplier
| |
irs_w-9.pdf (117 KB) |
Request for Taxpayer Identification Number and Certification
| |
eft_payment_authorization.pdf (584 KB) |
Authorization Agreement for Direct Deposit of EFT Payments
| |
m160-00_21_13.ebv0713-instructionstobidders.pdf (75.5 KB) |
General Contracting Instructions to Bidders
| |
m160-00_10_00.ebv0713-solicitation.docx (63.3 KB) |
General Contracting Solicitation template
| |
ohio_revised_code_section_153.08.pdf (33.3 KB) |
Statute permitting electronic bidding in Ohio
| |
ohio_administrative_code_section_153.1-8-01.pdf (37.2 KB) |
Administrative rule on electronic bidding in Ohi
| |
m299-03v0313-publicbidadvertisement-ebid.docx (27 KB) |
Public Bid Advertisement template
| |
Number | Deadline |
---|---|
DRC-21L048
DRC-21L048 SCI Hill Side Slip REBID
Southeastern Correctional Institution
5900 BIS Rd SW, Lancaster, Ohio 43130, Fairfield County
The project includes, but not limited to, the demolition of an existing building. New light poles, light heads, and electrical conduit/wire. New interior fencing. Asbestos sampling.
| 12/18/2024 04:00 PM UTC |
Number | Deadline |
---|---|
RE-BID DRC-17L171 AOCI Sally Port Gate Replacement and Guard Shack
AOCI Sallyport RenovationProvide and install two (2) new detention grade crash gates, and new automatic, no climb, sliding gate systems for interior and exterior gates of drive thru sally port. Replace and relocate control box. This project will require temporary security fencing while work is taking place. All work and temporary provisions will be coordinated with the institution.
| 04/10/2018 05:00 PM UTC |
DRC-18L008 RiCI ADA NON-COMPLIANCE CORRECTIONS
DRC-18L008 RiCI ADA NON-COMPLIANCE CORRECTIONS
| 04/10/2018 04:00 PM UTC |
DRC-18L006 AOCI Sewer Grinder
DRC-18L006 AOCI Sewer Grinder
Design and installation of Sanitary Sewer Grinding Station for the sanitary sewer line that connects Oakwood Correction to the Allen County Sewage Treatment Facility.
| 04/09/2018 06:00 PM UTC |
DRC-16L165-01 Phase 1: RECREATION ROOM VENTILATION
Phase 1: RECREATION ROOM VENTILATION
| 04/09/2018 06:00 PM UTC |
DRC 16L165-01 Recreation Room Ventilation Phase 1
DRC 16L165-01 Recreation Room Ventilation Phase 1
| 04/09/2018 04:00 PM UTC |
DRC-15L115: NCI Exterior Stair Replacement at Housing Units
DRC-15L115: NCI Exterior Stair Replacement at Housing Units
| 04/09/2018 01:00 PM UTC |
RE-BID: DRC-17L092 Inmate Housing Domestic Hot Water Boiler Replacement
RE-BID:DRC-17L092 Inmate Housing Domestic Hot Water Boiler Replacement
| 04/06/2018 07:00 PM UTC |
DRC-16L026: LECI UNIT MANAGEMENT OFFICE UPGRADE
Unit Office Blocks: Work will include constructing new
walls in each “block” area and painting all new and
existing walls and ceilings. Plus new ductwork and air
handling units for the Blocks.
| 04/06/2018 04:00 PM UTC |
DRC-18L011 CRC SWITCHGEAR UPGRADE TRANSFORMER
DRC-18L011: CRC Switchgear Upgrade Transformer, LED lights, New Conc Pad at 2 locations, etc.
| 04/03/2018 02:00 PM UTC |
RE-BID DRC-18L002 NEPRC
DRC-18L002NEPRC – Replacement of existing exterior and interior doors including but not limited to door slab, hinges, hardware, frame, security lite, half lite, DPS button style, louver, panic bar & kick plate. Installation of a premanufactured weapons/guard shack, including but not limited to the installation of the weapons/guard shack foundation, concrete walk area, data & power.
LorCI – Removal and replacement of existing door hinges throughout the facility.
| 04/02/2018 07:00 PM UTC |