The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU - 220522 Mechanical Room Refreshes FY 22 (Re-Bid #3)
This project will Refresh mechanical rooms in multiple buildings.
| 05/04/2023 05:00 PM UTC |
OSU-210651, Faculty Club - Elevator Replacement
OSU Columbus: Replacement of existing elevator at Faculty Club and all associated scope of work.
| 04/18/2023 06:00 PM UTC |
OSU-220998, PAES - ExSci Lab Renovation
OSU Columbus: The project consists of 1,345 SF of office space renovation in the ground floor of the Physical Activity and Educational Services building (PAES), 305 Annie and John Glenn Avenue, at The Ohio State University. Locations of work include refresh of rooms A011, A012, A021, and A023. Scope includes demolition, interior finish upgrades, modification of existing building fire protection and electrical systems.
| 04/17/2023 06:00 PM UTC |
OSU-220051 Enhanced Maintenance FY 22
Aluminum window and aluminum storefront replacement and masonry structural wall and veneer and poured concrete envelope restoration for Postle Hall and Research Center buildings.
| 04/13/2023 07:00 PM UTC |
OSU-220282, Airport - Taxiway A Rehabilitation
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
| 04/11/2023 06:00 PM UTC |
OSU-220259, 700 Ackerman - 4th Floor Improvements
Columbus Campus: The project will consist of the construction of approximately 7,040 Sf of existing office space within suite 400 on the 4th floor of the 700 Ackerman Place building. The renovation will include new entry, finish upgrades, along with mechanical plumbing and electrical upgrades.
| 03/31/2023 06:00 PM UTC |
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
| 03/30/2023 06:00 PM UTC |
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 03/29/2023 05:00 PM UTC |
OSU-210270 - Plumbing Repairs VMC
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold-water system. Select under slab sanitary work to fix known issues. Replacement of flooring in areas of under slab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility.
| 03/24/2023 05:00 PM UTC |
OSU-220281, Airport - Terminal Apron Rehabilitation
OSU Airport: Phase 1 Rehabilitation of Terminal Apron from Asphalt to Concrete.
| 03/21/2023 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.