The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
| 07/31/2023 06:00 PM UTC |
OSU-200080, Riffe - Room 137 Helium Recovery System
OSU Columbus: The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
| 07/25/2023 06:00 PM UTC |
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima: This project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4240 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems.
| 07/25/2023 06:00 PM UTC |
OSU-210651 Faculty Club - Elevator Replacement
Faculty Club - Elevator Replacement - 181 S Oval Mall
Columbus, OH 43210. This project will replace the elevator.
| 07/24/2023 06:00 PM UTC |
OSU-221103, Crane - Orthopedic Immediate Care Clinic
Tenant improvements of approximately 4,590 sf on the second floor and 130 sf on the third floor to convert shelled space into office, exam, check-out and storage areas matching the finishes of the existing building. Work includes partition walls, doors, borrowed lites, finishes, fire protection, plumbing, mechanical, electrical and data installation.
| 06/22/2023 06:00 PM UTC |
OSU-230113 - Campus Hardscape Improvements
This project will improve hardscapes around the OSU Columbus Campus
| 06/15/2023 06:00 PM UTC |
OSU-230025 Airport - Taxiway E, Rehabilitation
The Ohio State University Airport/Don Scott Field (KOSU) is home to 150 aircraft and sees an estimated 90,000 flight operations per year. This is the primary facility serving The Ohio State University and the surrounding central Ohio community. KOSU has been identified as a “National Priority” general aviation airport by the FAA, is a Part 139 Certificated Airport, and serves as a general aviation reliever for John Glenn International Airport.
As part of this project, the Airport looks to rehabilitate / reconstruct Taxiway E. Taxiway will need rehabilitated to support the aircraft type and keep taxiing aircraft safe.
| 05/30/2023 06:00 PM UTC |
OSU-210272 Electrical Renovations FY 2021
Replace main electrical distribution equipment in the OSU’s
Agricultural Engineering Building including switchboards, motor
control centers, and panelboards. Upgrade egress lighting system.
Separate standby and life safety emergency loads.
| 05/30/2023 05:00 PM UTC |
OSU-220732 East - ADA Parking Lot
Project includes the pavement rehabilitation, replacement of curbing and concrete areas to bring the East – ADA Parking Lot up to current. Accessibility Code. The lot will be re-striped and signed per City of Columbus and Ohio ADA requirements.
| 05/26/2023 05:00 PM UTC |
OSU-220282, Airport - Taxiway A Rehabilitation (REBID)
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
| 05/11/2023 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.