Upcoming Solicitations

Number Deadline
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty department members and their lab personnel. Suite 121 is currently fit out with single occupant research rooms and supporting mechanical, electrical, and technology infrastructure. The intent of this renovation is to remove the small research rooms and create an open environment to support new research teams. This renovation requires hazardous materials abatement, demolition, ADA compliance review, and interior finish upgrades. Mechanical and electrical design will include HVAC, electric, IT coordination, and fire alarm modifications
04/24/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane This project will remove and install new DR x-ray equipment.
08/31/2022 06:00 PM UTC
OSU-210456 - Wooster - Lab Bldg USDA Rm 305
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
08/26/2022 06:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 - Wilce Piping Replacement
This project will replace deteriorating plumbing systems.
08/18/2022 05:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
07/29/2022 06:00 PM UTC
OSU-200591, Lima - Galvin Hall Basement Renovation
Lima Campus: The project will renovate approximately 10,022 SF on the Basement Level. The scope of the project is to expand the Student Activity Spaces; rooms include a Commons, Student Lounge, Game Room, Catering Kitchen, Kitchenette, Huddle Rooms, Conference Space, Offices and an Exterior Patio Space directly outside the Commons.
07/26/2022 06:00 PM UTC
OSU-220008 - Neil Ave Building-Cooling Tower Replacement
This project will replace the cooling tower in the Neil Avenue Building.
07/26/2022 06:00 PM UTC
OSU-210329 650 Ackerman Roof Replacement
This project will replace the existing roof, make repairs to the existing deck, and add a roof drain and insulation to improve drainage.
07/21/2022 06:00 PM UTC
OSU-210268 Elevator Safety Repairs and Replacements
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 4 buildings on OSU’s Main Campus: Arps Hall (1 passenger elevator base bid) Dulles Hall (2 passenger elevators base bid) Smith Lab (1 passenger, base bid and 1 Freight Elevator, Alternate) University Hall (2 elevators base bid)
06/29/2022 06:00 PM UTC
OSU-200377, Waterman Dairy Improvements
Renovations to the existing Waterman Main Dairy Barn to convert the existing tie stall barn to a free stall barn with new robotic milking, feed, and manure systems. The project will also upgrade the building electrical service and add a new generator.
06/22/2022 06:00 PM UTC
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
06/21/2022 06:00 PM UTC
151 - 160 of 551 Solicitations