The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-210271 Road/Bridge Improvements BP 1
Project includes improvements to College Road between Woodruff Avenue and 18th Avenue. Improvements to College Road include installation of curb ramps, installation of bus lane, replacement or installation of sidewalk, full depth replacement of pavement, replacement of curb, lighting, and storm sewer improvements.
| 02/22/2022 02:00 PM UTC |
OSU-200101-BP 3
West Campus Infrastructure Phase 1
Bid Package 3- Provide infrastructure and lane widening for Kenny Road
| 02/21/2022 04:00 PM UTC |
OSU-210273 Infrastructure Renewal
Project includes removal of existing storm infrastructure and replacement with new infrastructure along with some new storm sewers. Project is located near intersection of Tuttle Park Place and W 17th Avenue.
| 02/18/2022 04:00 PM UTC |
OSU-220049, Outpatient Gahanna, Pelvic Health Renovation
Renovation of approximately 3,600 square feet of tenant space of the
Pelvic Health clinic located at Outpatient Gahanna. The renovation
is the conversion of an existing nuclear camera suite, restroom,
stress lab, hot lab, tech space, prep areas, sub waiting and phone
triage rooms into a PT gym with large team room. The plan converts
existing offices, reading room and echo lab into additional exam
rooms. It reworks nurses station into clean and soil rooms and adds
storage areas. The project contains several bid alternates allowing
the suite to be refreshed in the new OSUWMC finish standards.
| 02/17/2022 07:00 PM UTC |
OSU-210338, Bevis Hall - 3rd Flr SIM Center Relocation
OSU Columbus Campus: The renovation of approximately 3,692 SF of existing office space on the 3rd Floor of Bevis Hall located at 1080 Carmack Road, in Columbus, Ohio. The project scope includes the following Rooms: Base Bid: Third Floor - 317, 341, 371, 386, 387, 389, 390, 393, 394, 397, 398, X305C and X307C. The scope of the project is to create an open and collaborative work environment and upgrade finishes throughout the project area. Alternate G-1: Provide and install new paint on exposed existing concrete structure in Room 315.
| 02/15/2022 07:00 PM UTC |
OSU-210296, PAST Innovation Lab
The PAST Foundation
Interior renovations consisting of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems.
| 02/04/2022 07:00 PM UTC |
OSU-210116, 610 Ackerman Warehouse
HVAC, Fire Suppression, and electrical upgrades; safety, security, and accessibility upgrades; limited interior construction including new plumbing facilities.
| 01/31/2022 07:00 PM UTC |
OSU-210180, Aerospace Research Center - Rm 121 Upgrades (REBID)
OSU Columbus Campus: Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
| 01/24/2022 07:00 PM UTC |
OSU-191035 Field Hockey Press Box
This Project will provide demolition, new site work and building construction of the Field Hockey Press Box located on the West side of the existing Buckeye Field.
| 01/20/2022 07:00 PM UTC |
OSU-210283 Mansfield - Recreation Center Fire Alarm Upgrade
This project will provide new manual, addressable, voice, ADA compliant fire alarm system in the Recreation Center on the OSU Mansfield Campus.
| 01/18/2022 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.