General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSU-190314, James - Clinical Eng Offices
Renovations to rooms L004 and L060 on the Conference Level of the James Cancer Hospital, to accommodate Clinical Engineering, Zone Shop, and Materials Management.
04/22/2022 06:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase one – the Zee MP and Spect CT areas, phase two – the Agile area and phase three – the tech work area.
04/12/2022 06:00 PM UTC
OSU-210287, Marion - Alber Student Center Renovation Ph 2
OSU Marion: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
04/08/2022 06:00 PM UTC
OSU-190066 HVAC Replacements FY 2019 - Bid Package 02
Davis Heart and Lung: Delta Controls Replacements
04/01/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development (REBID)
OSU Airport: Extension of Taxiway A8 and Service Road (REBID)
03/30/2022 06:00 PM UTC
OSU-210286 - Mansfield - Exterior Signs and Walk Renovation
This project will include the fabrication and installation of campus-wide exterior signage including vehicular directional, pedestrian directional, service area identification, building identification, parking lot identification. Also includes removal of some existing exterior signs
03/25/2022 06:00 PM UTC
OSU-200328 Tunnel System Evaluation - BP 1 Tunnel Temporary
The project consists of the installation of temporary structural supports within the 19th Avenue Tunnel and the Cockins Hall Vault. The project will also remove and replace piping within the Cockins Hall Vault, remove abandoned utilities within the 19th Avenue Tunnel, and re-rack existing communications cabling within the 19th Avenue Tunnel. Temporary lighting will also be installed in the 19th Avenue Tunnel.
03/25/2022 06:00 PM UTC
OSU-210274-1, BMEC Ph 2 - Demolition
OSU Columbus Campus: The scope will include the total demolition of Watts Hall (2041 College Rd, Columbus, OH 43210-1178) which is physically connected to MacQuigg Hall (105 W Woodruff Ave, Columbus, OH 43210-1117). The buildings are located in the central core of campus which is highly populated. The building to remain will need to be shored and separated from Watts along with disconnection and termination of any utility and mechanical pipes that may feed the building from MacQuigg. The scope of work to include building demolition, abatement, MEP / Electrical disconnects, site work, and shoring of building to remain. Upon completion of the demolition, the site will need to be brought to grade and seeded. The demolition will allow for future building to be erected for the Biomedical and Materials Engineering Complex.
03/23/2022 06:00 PM UTC
OSU-210440, Airport - Hangar Airpark Development
OSU Airport: Extension of Taxiway A8 and Service Road
03/03/2022 07:00 PM UTC
OSU-210473 National Pan-Hellenic Council (NPHC) Plaza
This project will construct a National Pan-Hellenic Council Plaza adjacent to Hale Hall at OSU Columbus Campus.
03/02/2022 07:00 PM UTC
171 - 180 of 552 Solicitations
1 2 14 15 16 18 20 21 22 55 56