The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-210282 Mansfield - Boiler Replacement
OSU Mansfield Campus:
Campus Recreation Center - Remove existing boiler. Install 2 high efficiency boilers, pumps, and expansion tank. Eisenhower Memorial Center - Remove existing boilers. Install 2 high efficiency boilers, abatement and 2 alternates
| 01/18/2022 07:00 PM UTC |
OSU-210285 - Mansfield - Building Entries Renewal and Renovation
Replace selected existing main entrance vestibules, doors, storefront, ADA hardware and miscellaneous exterior concrete slabs at the following buildings: Campus Recreation Center (1729 University Drive) and Eisenhower Memorial Hall (1640 University Drive) located on The Ohio State University’s Mansfield Campus, Mansfield, Ohio, Richland Country.
| 01/18/2022 07:00 PM UTC |
OSU-210289, Newark - HVAC Renovations
The work includes the replacement of an existing packaged RTU on the first floor roof of Hopewell Hall. The existing unit is a packaged DX cooling unit with hot water heat. The new unit will be of like design. Existing duct connection points to remain in the same place. Electrical power to RTU equipment will be replaced. Lightning protection system will be extended to new RTU. The single ply membrane roof system will require modifications to allow for the new unit and duct. A small portion of roof railing for fall protection.
| 01/11/2022 07:00 PM UTC |
OSU-200104 HVAC Replacements FY 2020 Project REBID
This project will renovate and update building HVAC systems in buildings constructed after 1999.
| 12/16/2021 07:00 PM UTC |
OSU-210119, 600 & 610 Roof Replacement REBID
Replacement of roofs at Building 600 and 610 Ackerman Road, Columbus, OH
| 12/10/2021 07:00 PM UTC |
OSU-210308, Evans Hall - Pathology Space
Renovations to select areas of the existing 1st and 2nd floors of Evans Hall to create more functional program spaces and support the College of Medicine, Department of Pathology.
| 12/09/2021 07:00 PM UTC |
OSU-210180, Aerospace Research Center - Rm 121 Upgrades
Provide and install the electrical feeder(s) and infrastructure, including premanufactured modular units, to allow for future installation of Owner equipment.
| 12/02/2021 07:00 PM UTC |
OSU-210473 National Pan-Hellenic Council (NPHC) Garden
Project will include the sitework for the construction of a garden area including earthwork and excavation, seat walls, plaza pavements, monument foundations, soils, and landscaping.
| 12/02/2021 07:00 PM UTC |
OSU-210404, Newark - Hopewell Hall Improvements
OSU Newark: Project includes renovating a set of restrooms to make them meet ADA and update the finishes. Creation of a gender-neutral restroom will be added near the existing restroom bank.
| 12/02/2021 07:00 PM UTC |
OSU-200666, Riffe - 6th Floor Labs Renovation
Interior renovations of existing labs 603, 609, 611, 637, 639, 643, and room 620. Renovations consist of new and revised partitions, mechanical, electrical, plumbing, technology systems, and ceiling systems associated with the renovation.
| 11/29/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.