The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160319, Rhodes - Bronchoscopy Procedure Rooms
RENOVATION OF 2,003 SF EXISTING 2ND FLOOR OF THE HOSPITAL. WORK INCLUDING DEMOLITION, FINISHES (FLOOR, ROOM BASE, PAINT, CEILINGS), RIGID PLASTIC WAINSCOT, CORNER GUARDS, STRUCTURAL AND RELATED MEP ITEMS. WORK ALSO INCLUDES NEW HVAC FOR BRONCH ROOMS.
| 03/28/2019 06:00 PM UTC |
OSU-190063 Arwell Chiller Replacement
The Project consists of replacement of a nominal 350 ton water-cooled centrifugal chiller with a new unit of the same capacity. Existing pumps and cooling tower to remain. The University has pre-purchased the chiller for installation by the contractor. Project includes enlarging an existing wall opening to get new chiller into the
Penthouse.
| 03/20/2019 06:00 PM UTC |
OSU-190194, Drinko - Saxbe Auditorium Renovation
OSU Main Campus: Interior renovation of the existing auditorium to meet the current needs of the college. New seating, accessibility modifications, and revised mechanical, electrical, and technology systems associated with the renovation.
| 03/14/2019 06:00 PM UTC |
OSU-180784, Lima - Campus Paving Improvements
OSU Lima: Replace Parking Lot C at OSU Lima Campus by process of reclaiming asphalt base. Alternate 1 will include full depth asphalt replacement in Parking Lot C in lieu of reclaiming asphalt base per base bid. Alternate 2 will include improvements to the Public Service Building Entry. Alternate 3 will include removal and replacement of the drive connecting Parking Lot C and Parking Lot A. Alternate 4 will include pavement repair in Parking Lot A.
| 03/05/2019 07:00 PM UTC |
OSU-190144, Airport - North Runway Rehabilitation Phase 2
OSU Airport: The scope of work for the Base Bid includes items to reconstruct Runway 9L and 27R ends. The work associated with this bid includes, but is not limited to unclassified excavation, placement of crushed aggregate base course, placement of plant mix bituminous pavement, bituminous pavement removal, bituminous surface removal, temporary soil erosion control, permanent erosion control, installation of drainage structures and pipe, and mulched seeding.
The scope of work for Alternate Bid 1 includes items required to repair Taxiway G. The work associated with the bid includes but is not limited to microsurfacing of Taxiway G.
The scope of work for Alternate Bid 2 includes items required to rehabilitate Taxiway F. The work associated with the bid includes but is not limited to bituminous surface removal, pavement crack repair, placement of plant mix bituminous pavement, temporary soil erosion control, and mulched seeding.
| 03/01/2019 07:00 PM UTC |
OSU-160935, Jameson Crane-Surgical Skills Lab-REBID
REBID: The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
| 02/26/2019 07:00 PM UTC |
OSU-140056, Wooster Graduate House Phase 1
OSU Wooster: The Project consists of new construction of the Wooster Graduate House Phase 1. The building is two (2) stories above grade and a mechanical basement below grade. Site work and utilities to support the new construction are part of the project. The building consists of a ten (10) bedroom units, four (4) bathrooms, a laundry room, and common living space as well as the internal circulation needed to support the program.
| 02/22/2019 07:00 PM UTC |
OSU-180070, 680 Ackerman - IHC/Histology Lab
Renovation of 680 Ackerman for the relocation of the OSU Wexner Medical Center IHC/Histology Lab.
| 02/20/2019 07:00 PM UTC |
OSU-190049, Newark - Pavement Renovations
Newark Campus: Pavement renovations to include milling, resurface, reconstruction, restriping, and lot reconfigurations requiring new pavement of the Ohio State University and Central Ohio Technical College Newark Campus.
| 02/19/2019 07:00 PM UTC |
OSU-130504, Ohio Union - Infrastructure Upgrades
Ohio Union Ballroom Floor renovation includes foundation modifications and new structural columns on the basement and ground floors respectively. Removal of existing acoustical and gypsum board soffits / ceilings including HVAC ductwork modifications, electrical rework, fire alarm and sprinkler piping modifications.
| 02/13/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.