General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSU-180173 Building Envelope Renovation FY18
This project will replace or repair aging and/or failing elements of building envelope including windows, curtain walls, roofing, masonry, and water infiltration issues. Exact buildings will be determined during design.
01/22/2019 06:00 PM UTC
OSU-160935, Jameson Crane - Surgical Skills Lab
The Surgical Skills Lab consists of fitting out existing shell spaces on the 3rd floor of the Jameson Crane Sports Medicine Institute, totaling approximately 5000 square feet, to accommodate a seven station surgical skills lab and a two station cadaver lab along with related support spaces including locker rooms, toilet rooms, instrument decontamination room, sterile storage and a cadaver storage area with a 20 body refrigerator and freezer.
01/17/2019 07:00 PM UTC
OSU-170847 TNC Chiller Replacement
This project will replace the chiller.
01/10/2019 07:00 PM UTC
OSU-180524 Northwood & High Chiller Replacement BP 2
This project will install a new chiller on the roof.
01/10/2019 03:00 PM UTC
OSU-180360 Vet Med Center Fire Alarm Panel
Replace the (2) existing fire alarm systems in the building with (1) fire alarm system. The existing fire alarm systems are by different manufacturers and cause confusion during alarm. The existing fire alarm systems will be replaced in a manner that minimizes coverage outages, however, fire watch will be required and provided by the University. Existing device locations will generally be reused, and additional devices will be provided to meet current University standards and codes.
01/10/2019 03:00 PM UTC
OSU-160916, Wooster - Selby Hall Cabling
OSU Wooster Campus: The work consists of the removal and replacement of existing teledata cabling in Selby Hall. Related work includes limited hazardous material abatement, a new telecom room, and replacement of ACT tiles in the areas of work. The new telecom room will include HVAC, plumbing, power and lighting modifications required for the construction of this space.
12/17/2018 07:00 PM UTC
OSU-170847 TNC Chiller Repalcement
This project will replace the chiller.
12/12/2018 06:00 PM UTC
OSU-170535, Mansfield - Molyet Village Comm Bldg
One story wood frame 7,383 SF community building located near Molyet Village on the Mansfield campus of the Ohio State University. The project scope includes adjacent site area improvements, foundation and framing and exterior envelope, mechanical, electrical, technology and plumbing systems, fire alarm and fire protection systems, casework, finishes.
12/07/2018 06:00 PM UTC
OSU-160302-BP2 Rhodes - Public Restroom Renovation
Rhodes - Public Restroom Renovation 450 W 10th Avenue, This project will renovate the restrooms in the lobby of Rhodes and the 5th floor atrium in Rhodes.
12/04/2018 07:00 PM UTC
OSU-180474, Rhodes-Doan, ORs and Scrub Rooms (REBID)
This project is a REBID. This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
11/28/2018 06:00 PM UTC
341 - 350 of 552 Solicitations