The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-180474 Rhodes-Doan ORs and Scrub Rooms
This project will update various operating rooms and adjacent scrub rooms with new scrub sinks, medical booms, HVAC duct sealing, and the addition of integrated AV equipment to a select group of ORs.
| 10/31/2018 05:00 PM UTC |
OSU-180039, Ag Admin - Restroom Renovations (REBID)
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
| 10/30/2018 06:00 PM UTC |
OSU-160975 Electrical System Renewal
Orton Hall: Project consists of replacing the existing service entrance switchboard with a new service entrance panelboard, replacing existing distribution panelboards and their feeders, and providing exterior egress lighting.
Meiling Hall: Project consists of replacing the existing MCC with a new MCC of the same size, providing emergency egress lighting throughout the building via a new central battery inverter, and replacing existing exit signs and adding new exit signs.
| 10/11/2018 05:00 PM UTC |
OSU-160418 Univeristy Hospital 4th Floor OR Upgrades
This Project will make various upgrades to the OR spaces on the 4th Floor including, repair at rated walls, new rated doors, replacement of ceilings, and sprinkler upgrades.
| 10/03/2018 05:00 PM UTC |
OSU-160319 Rhodes - Bronchoscopy Procedure Rooms
This project will renovate rooms S247 and S251 into bronchoscopy procedure rooms.
| 08/30/2018 05:30 PM UTC |
OSU-160978 Fire Alarm Replacements Phase 2
The work consists of the removal and replacement of existing fire alarm systems in 6 buildings (Agricultural Engineering Building, Evans Lab, Mershon Auditorium, Newman and Wolfrom Laboratory, Parks Hall and Rightmire Hall) with new, addressable systems. Related work includes hazardous material abatement, patching and painting of walls at removed equipment, and limited ceiling replacement
| 08/30/2018 05:00 PM UTC |
OSU-180221, Drackett Tower - Boiler Replacements
The Project consists of the replacement of 2 domestic water converters with gas-fired water heaters and replacement of 2 heating water boilers on the 13th and 14th Floors of Drackett Tower. The work also includes replacement of 2 domestic water storage tanks, 2 existing cooling towers, and 6 heating water expansion tanks. A new domestic hot water thermostatic mixing valve will be installed for scald protection. The work will be done in phases for minimum impact to building operation.
| 08/29/2018 06:00 PM UTC |
OSU-180526 33 W 11th - Chiller Replacement
This project will install a new chiller on the roof
| 08/23/2018 05:00 PM UTC |
OSU-170213 - Doan Exterior Brick Repair
This project will repair the exterior brick and steel lintels.
| 08/16/2018 05:30 PM UTC |
OSU-180039, Ag Admin - Restroom Renovations
Main Campus: The renovation of approximately 1,676 SF of Restroom space in the Agricultural Administrative Building located at 2120 Fyffe Road, in Columbus, Ohio. The project scope includes rooms 027T, 031T, 038T, 038A, 040T, 100T, 102T and 103T. The new restroom renovations will reconfigure the rooms identified above to include Group and Family Restrooms, and a Wellness Room.
| 07/31/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.