The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-160793 Parks-Pharmacy Practice Lab
Renovation of labs 233, 233A, 233C, 233E, 241, 243, 243A, and 246 on the second floor of Parks Hall into Pharmacy Practice Labs, plus renovations of corridors X207C and X208C.
| 05/30/2018 06:00 PM UTC |
OSU-170533, Lincoln Tower 14th Floor Renovation
Lincoln Tower 14th Floor Renovation
1800 Cannon Drive, Columbus, OH 43210
Complete renovation of the 14th floor of Lincoln Tower.
| 05/15/2018 06:00 PM UTC |
OSU-180042 Atwell - Entrance & First Floor Renovation
This project will renovate the first floor entry, lobby, restrooms and corridors.
| 05/08/2018 06:00 PM UTC |
OSU-180169, Newark - Campus Boiler Replacements
Newark Campus: Replace the two Kewanee heating hot water (HHW) boilers and make improvements to the HHW pumping and piping arrangement in the boiler room.
| 04/30/2018 06:00 PM UTC |
OSU-170233 Riffe - First Floor Renovation
This project will build out shelled space on the 10th and 12th floors to create ICU beds.
| 04/25/2018 06:00 PM UTC |
OSU-160920, Kunz-Brundige Franklin County Extension Building
OSU Main Campus: The Kunz-Brundige Franklin County Extension Building will be a newly constructed single-story, 10,475 square foot building located on an agriculture site. It will house offices, a multipurpose room, a gardener’s lab, a demonstration kitchen, pantry, and support spaces. A sloped green roof with deep overhangs will direct storm water runoff to a landscaped basin adjacent to a partially paved parking lot.
| 04/24/2018 06:00 PM UTC |
OSU-170619 Dodd Elevator Upgrades
This project will modernize the machinery, controls and cabs for elevators #1, #2 and #3 in Dodd Hall.
| 04/17/2018 06:00 PM UTC |
OSU-160530, Rhodes - Fire Alarm
The scope of this project is to replace existing antiquated Autocall and Simplex Grinnell fire alarm system components serving Rhodes hall at the Ohio State University Wexner Medical Center. The primary fire alarm system serving Rhodes hall is a Simplex Grinnell 4100ES system. Existing antiquated system panels, initiating and notification devices connected will be replaced as identified on drawings.
| 04/05/2018 05:00 PM UTC |
OSU-180021, WHAC - Indoor Field Roof Replacement
Renovation of a portion of the existing facility roof (indoor practice football field). Renovations will include protection, selective demolition, and new construction including but not limited to roofing materials, gutters/downspouts, metal wall panels, thermal insulation, flashings and sealants, heat trace and lightning protection.
| 04/02/2018 06:00 PM UTC |
OSU-170459 Morehouse Tower Elevator Upgrades
This project will upgrade and replace elevator controls and cab interiors.
| 03/29/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.