OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OSU-160467, Lincoln Tower - Low Rise Fire Alarm
Fire alarm system modifications and replacement.
03/29/2018 05:00 PM UTC
OSU-150019, Wooster Farm Operations Improvements
Wooster Campus: Project includes new construction of the Centralized Farm Operations Facility and the Grace Drake Learning Laboratory Facility. New work includes new structures, slabs, roofs, exterior facades, interior work, mechanical, electric, pluming, and site. Refer to project narratives for further descriptions.
03/28/2018 06:00 PM UTC
OSU-160340, Vet Hospital - Expand Oncology
Renovation of the existing Veterinary Oncology Suite on the ground floor of the OSU Veterinary Hospital. The project includes demolition of existing walls, ceilings and finishes; new walls, doors, millwork, ceilings, lighting, finishes, electrical and HVAC work.
03/27/2018 06:00 PM UTC
OSU-170651, McPherson - Lecture Hall Renovations
Renovation of lecture halls 1000 & 1015 of McPherson Chemical Laboratory. Work includes selective demolition, new walls, concrete and steel structures, doors, frames, and door hardware, finishes (including flooring, room base, paint, acoustical wall panels and acoustical ceilings), millwork, miscellaneous metals, glazing, mechanical, electrical and technology.
03/26/2018 06:00 PM UTC
OSU-160933, Newark - Campus Infrastructure
Newark Campus: Project consists of the replacement of existing HSP roadway, parking lot and sidewalk light fixtures with new LED fixtures. The project also includes scope to provide natural gas emergency generator for Reese Center.
03/23/2018 06:00 PM UTC
OSU-170882 Bevis - Boiler Replacement Phase 2
Bevis Hall Boiler Replacement Phase 2
03/23/2018 05:00 PM UTC
OSU-170314, Faculty Club - Patio Restoration
Main Campus: Restore the Faculty Club patio with new concrete pavement, stone curb, lighting, fire pits, and landscaping. Alternate 1 will replace deteriorating stone steps and add a new handrail for the steps.
03/20/2018 06:00 PM UTC
OSU-170534, Lincoln - Exterior Repairs
Exterior Concrete repairs; removal and replacement of existing concrete coating; removal and replacement of existing joint sealants; spot tuckpointing/repairs to masonry.
03/20/2018 02:00 PM UTC
OSU-170752, WHAC - East Wing Renovation
Renovation of a portion of the existing building, construction of an addition, and expansion of the mezzanine into existing high volume spaces. Renovations will include protection, selective demolition, and new construction including but not limited to new structure, roof, walls, doors, finishes, casework, countertops, kitchen equipment, fire suppression, plumbing, fixtures, HVAC, exhaust, lighting, electrical, fire alarm, security and data.
03/14/2018 05:00 PM UTC
OSU-170872, Morehouse Pavilion - First Floor MRI (REBID)
Project consists of providing all labor, materials, equipment, with all ways and means necessary to replace the existing MRI equipment with a new equipment manufactured by Siemens Medical Solutions. Work includes but is not limited to removal of existing equipment, removal of existing chiller and piping and installation of new chiller and piping, addition of quench vent cap, partial removal of existing abandoned quench vent, patch and repair as required including roof doghouse, new humidification system, modifications to mechanical and electrical as shown throughout the drawings and specifications.