Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Effective  2024

There will be an increase to the SDP commitment requirements.
MBE and WBE  requirements will no longer be combined.
Requirements as followed: 

MBE: 6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
P25-3615-C2A
Cass Recreational Complex Roof and Solar Project Scope: The project consists of a new TPO membrane roof installed over the existing metal roof and installing photovoltaic panels. The PV systems include the panels, raceways, conductors, inverters, and connection to the existing buildings electrical equipment. The estimated project: $1,850,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Roofing Category and must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 AM UTC
P25-3593-M4A
Flooring Maintenance Installations at DCR Facilities Counties : Essex, Middlesex, Suffolk, Norfolk, Bristol, Plymouth, Barnstable, Dukes, Nantucket, Worcester, Hampden, Hampshire, Franklin, Berkshire The project consists of: The project consists of: Installation of various types of Flooring at DCR Facilities Statewide. Flooring types include epoxy flooring and wall coatings, ceramic tile, VCT tile, rubber matting. Locations include comfort stations, swimming pools, rinks and other DCR buildings. This is a work order contract for building sites to included comfort stations, swimming pools, rinks and other DCR buildings, not identified at this time. The estimated project $1,200,000.00 The work is to be accomplished within 912 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). Bidders must be certified in the appropriate category and prequalified in floor covering. and must submit with the bid an update of their respective qualifications. Brian Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 PM UTC
P24-3566-C1A
SUB-BIDS (2): Section 040001 Masonry, Section 260000 Electrical Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) Individual sets of contract documents will only be available on DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. In the event that any addenda are issued throughout the open period for this project, DCR will distribute these addenda via Bid Express, which will also email identified prospective at the time plans and specifications are issued. A pre-bidding conference for prospective bidders will be held on Monday, January 6, 2025 at 10:30am at the Marine Park Bandstand, 1889 William J. Day Boulevard, Boston. Questions should be directed to nathaniel.tipton@mass.gov by Close of Business Wednesday, January 8, 2025 at 12:00PM, The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/16/2025 05:00 PM UTC
P19-3295-C1A
Mass Central Rail Trail, Wayside; Sudbury to Hudson Location: Wayside, Sudbury, Stow, and Hudson, MA The project is the construction a 10-ft wide paved, shared-use path along 7.5 miles of the Mass Central Rail Trail (MCRT) Wayside corridor from the Eversource Driveway approximately 900 feet east of Landham Road in Sudbury to the Assabet River Rail Trail off Wilkins Street in Hudson. The project includes installation of facilities for road crossings, paving, fencing/ railing installation, landscaping, hardscape, site amenities, pavement markings, signage and final restoration of all areas within the work zone. The estimated project cost is $ 7,000,000 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - BIKE PATHS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/23/2025 05:00 PM UTC
P24-3566-C1A
General Bid: Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation  
01/30/2025 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
P22-3455-C2A
Pine Tree Brook Reservoir Dam Decommissioning and Stream Restoration - Milton, MA Labor, equipment, and materials necessary to remove portions of Pine Tree Brook Dam . Restore unimpeded flow to a stable, natural stream channel. A pre-bidding conference for prospective bidders will be held at the Site on Wednesday, February 16, 2022, at 11:00 AM. The Site is located near the southwest corner of Unquity Road and Canton Ave (near 851 Canton Ave), adjacent to the Max Ulin Memorial Public Skating Rink. The meeting will begin n the Rink parking lot and then proceed by foot to the Site. The estimated project cost is $ 75,000 The work is to be accomplished within 30 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/23/2022 05:00 PM UTC
P15 2928 C1A
Sub-BIDS:Shannon Beach Restroom Facilities Mystic Lake State Park, Winchester MA SUB-BIDS: Misc. And Ornamental Iron, Roof and Flashing, Tile, Plumbing, and Electrical The project consists of: Project consist of Construction and Site Development to provide a new Rest Room facility for Shannon Beach. The facility will provide toilets, lavatories, outdoor rinse stations. Site development will provide accessibility to the beach and all portions of the project. The project also includes landscaping paving, ramps, shrubs, and trees. Alternate #1 is a small storage building. The cost estimate for this base project is $2,050,694.00. The cost estimate for add alternate 1 is $130,010.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications Generals must be certified in General Building Construction and must submit with the bid an update of their respective qualifications.
02/17/2022 05:00 PM UTC
P15-2984-C2A
Amelia Earhart Dam Facility Hardening Upgrade Somerville, Massachusetts The project consists of facilities hardening and flood protection to elevation 122 (MDC) including replacing hatches, doors, manhole covers, limit switches, sump pumps and related piping, repair construction/expansion joints and concrete spall, replacement of building storefront, seal electrical conduits, and two new standby generators. The estimated project cost is $4,900,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Pump Station to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/16/2022 05:00 PM UTC
P22-3453 C1A
DCR Middlesex Fell Reservation Limited Demolition 164 Pond Street, Stoneham, MA Demolishing three structures and above-ground gas tank facility located on the Middlesex Fells Reservation and remove all debris. Abate asbestos in each building as required and grade the site as shown on the site plan. Relocate all items designated on the contract documents to be relocated to a temporary storage facility located adjacent to the work area. The existing slabs and foundations shall not be removed as part of this contract. The estimated project Base Bid cost is $275,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Demolition and must submit with the bid an update of their respective qualifications
02/09/2022 05:00 PM UTC
P22-3462-C1A
Sidewalk Improvements on Fellsway Fellsway, Medford, MA The project consists of repairs to driveways, sidewalks, traffic islands, as well as various other items listed herein to be completed within 180 days. The estimated project cost is $ 4,100,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY – SIDEWALK AND CURBING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
02/09/2022 05:00 PM UTC
P22-3457-M1A
Annual Maintenance and Service to HVAC and Plumbing Systems at Various Flood Control/Navigational Facilities Location: Boston, Somerville, Everett, Revere, Dedham, Newton. The project consists of: Providing annual maintenance and service of Industrial Heating Ventilation and air Conditioning (HVAC) and plumbing systems at Various Flood Control /Navigational Facilities. The estimated project Base Bid cost is $ 240,000.00 A Mandatory pre-bid meeting for prospective bidders will be held on January 19, 2022, at 1:00 PM at New Charles River Dam, 250 Warren Avenue Charlestown MA 02129 All General Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in Both HVAC & PLUMBING which they are bidding on and must submit with the bid an update of their respective qualifications. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
02/02/2022 05:00 PM UTC
P22-3461-M2A
Servicing Electrical & Electronic Systems - Statewide Location: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The scope of this work includes maintenance repair, removal and new installation of electrical and electronic systems at various DCR sport facilities, recreational areas, properties and buildings. The estimated project Base Bid cost is $ 1,400.000.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Electrical and must submit with the bid an update of their respective qualifications.
01/26/2022 05:00 PM UTC
P22-3440-M1A
NATURAL TURF FIELD MAINTENANCE Kelly Field, 25 Turtle Pond Parkway, Boston, MA & Foss Park, 49 Fellsway West, Somerville, MA The project consists of restorative maintenance on natural turf athletic fields at Foss Park and Kelley Field. Maintenance activities include filling low spots, aeration, topdressing, seeding and fertilizing in areas indicated on the Drawings. The estimated project cost is $200,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in LANDSCAPING INCLUDING TREE PLANTING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/26/2022 05:00 PM UTC
P22-3442-C1A
MAGAZINE BEACH BATHHOUSE ENTRANCE 719 Memorial Drive, Cambridge, MA Sitework to remove existing vegetation , demolish existing concrete ramp at the front of the bathhouse. Construct a new concrete landing , ADA compliant asphalt pathway at front entrance. Plantings,site furnishings,benches & bike racks. The estimated project cost is $ 285,000 Bidders must be pre-qualified by ( MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/19/2022 05:00 PM UTC
P22-3461-M1A
SERVICING TRAFFIC SIGNALS: Location: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The project consists of providing service to maintain traffic signal and control systems (DCR Statewide) in good working order, including scheduled preventive maintenance, emergency repairs and modifications. Subject to appropriations for expenditures as noted in Part IV, Notice of Special Conditions of the Contract (Paragraph A & B) The estimated project cost is $ 2,400,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in TRAFFIC SIGNALS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/12/2022 05:00 PM UTC