General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Effective  2024

There will be an increase to the SDP commitment requirements.
MBE and WBE  requirements will no longer be combined.
Requirements as followed: 

MBE: 6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
P25-3615-C2A
Cass Recreational Complex Roof and Solar Project Scope: The project consists of a new TPO membrane roof installed over the existing metal roof and installing photovoltaic panels. The PV systems include the panels, raceways, conductors, inverters, and connection to the existing buildings electrical equipment. The estimated project: $1,850,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Roofing Category and must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 AM UTC
P25-3593-M4A
Flooring Maintenance Installations at DCR Facilities Counties : Essex, Middlesex, Suffolk, Norfolk, Bristol, Plymouth, Barnstable, Dukes, Nantucket, Worcester, Hampden, Hampshire, Franklin, Berkshire The project consists of: The project consists of: Installation of various types of Flooring at DCR Facilities Statewide. Flooring types include epoxy flooring and wall coatings, ceramic tile, VCT tile, rubber matting. Locations include comfort stations, swimming pools, rinks and other DCR buildings. This is a work order contract for building sites to included comfort stations, swimming pools, rinks and other DCR buildings, not identified at this time. The estimated project $1,200,000.00 The work is to be accomplished within 912 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). Bidders must be certified in the appropriate category and prequalified in floor covering. and must submit with the bid an update of their respective qualifications. Brian Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 PM UTC
P24-3566-C1A
SUB-BIDS (2): Section 040001 Masonry, Section 260000 Electrical Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) Individual sets of contract documents will only be available on DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. In the event that any addenda are issued throughout the open period for this project, DCR will distribute these addenda via Bid Express, which will also email identified prospective at the time plans and specifications are issued. A pre-bidding conference for prospective bidders will be held on Monday, January 6, 2025 at 10:30am at the Marine Park Bandstand, 1889 William J. Day Boulevard, Boston. Questions should be directed to nathaniel.tipton@mass.gov by Close of Business Wednesday, January 8, 2025 at 12:00PM, The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/16/2025 05:00 PM UTC
P19-3295-C1A
Mass Central Rail Trail, Wayside; Sudbury to Hudson Location: Wayside, Sudbury, Stow, and Hudson, MA The project is the construction a 10-ft wide paved, shared-use path along 7.5 miles of the Mass Central Rail Trail (MCRT) Wayside corridor from the Eversource Driveway approximately 900 feet east of Landham Road in Sudbury to the Assabet River Rail Trail off Wilkins Street in Hudson. The project includes installation of facilities for road crossings, paving, fencing/ railing installation, landscaping, hardscape, site amenities, pavement markings, signage and final restoration of all areas within the work zone. The estimated project cost is $ 7,000,000 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - BIKE PATHS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/23/2025 05:00 PM UTC
P24-3566-C1A
General Bid: Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation  
01/30/2025 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
P22-3432-M1A
Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade: Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester The scope of work includes maintenance, troubleshooting, repair, adjustment, upgrade, and monitoring of Photovoltaic Systems and associated equipment, Energy Storage, Electric Vehicle Charging Stations, and Solar Lighting at various DCR Locations, State Parks, and Recreation Facilities Statewide. The estimated project Base Bid cost is $ 343,000.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in"Energy Management Systems" category and must submit with the bid an update of their respective qualifications.
01/12/2022 05:00 PM UTC
W22-7438-C01
Gate 40 Culvert Upgrade Petersham, MA The project consists of installation of a new 19’ wide X 32’ long 3-sided concrete box culvert with headwalls; removal of existing twin corrugated culverts; excavation and dewatering; roadway reconstruction and related site restoration work. The estimated total project cost is $450,000. Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in _ Bridge-Culverts to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
01/05/2022 05:00 PM UTC
P22-3471-C2A
GENERAL BIDS-Blue Hills Reservation Randolph Ave Stable Stabilization. Wednesday, 12/8/21 12:00 PM will be received through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. The project consists of: Carpentry and Masonry Repairs, Roofing and Flashing, Waste, and vegetation disposal. The estimated project Base Bid cost is $ 195,000.00 The work is to be accomplished within _90__calendar days of a notice to proceed. Liquidated damages in the amount of $ 900.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
12/08/2021 05:00 PM UTC
P22-3471-C2A
Sub-BID proposal : Roofing and Flashing Blue Hills Reservation Randolph Ave Stable Stabilization,1331 Randolph Ave, Milton, Ma The project consists of: Carpentry and Masonry Repairs, Roofing and Flashing, Waste, and vegetation disposal. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
11/24/2021 05:00 PM UTC
P22-3448-M3A
GENERAL BID : Pool Mechanical Services – DCR Pools in Central and Western Massachusetts Facilities within Worcester, Franklin, Hampshire, Hampden, and Berkshire counties Maintenance and repair of DCR Pools systems and equipment including filter and mechanical systems, pool shell and gutters, domestic plumbing, electrical, safety equipment, painting, and miscellaneous other items. The estimated project Base Bid cost is $ 1,500,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications. General Bidders shall be pre-qualified in Mechanical Systems and Plumbing, sub-Bidders in Plumbing.
11/10/2021 05:00 PM UTC
P22-3448-M1A
General : Pool Mechanical Services – DCR Pools in Metro Boston Region; Facilities within Suffolk, Middlesex, Norfolk, Bristol, Plymouth, and Worcester Counties Maintenance and repair of DCR Pools systems and equipment including filter and mechanical systems, pool shell and gutters, domestic plumbing, electrical, safety equipment, painting, and miscellaneous other items. The estimated project Base Bid cost is $ 1,800,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications. General Bidders shall be pre-qualified in Mechanical Systems and Plumbing, sub-Bidders in Plumbing.
11/10/2021 05:00 PM UTC
P22-3448-M2A
General : Pool Mechanical Services – DCR Pools in North Region Facilities within Suffolk, Middlesex, Essex and Worcester counties Maintenance and repair of DCR Pools systems and equipment including filter and mechanical systems, pool shell and gutters, domestic plumbing, electrical, safety equipment, painting, and miscellaneous other items. The estimated project Base Bid cost is $ 1,500,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications. General Bidders shall be pre-qualified in Mechanical Systems and Plumbing, sub-Bidders in Plumbing.
11/10/2021 05:00 PM UTC
P22-3442-M1A
Maintenance of Emergency Generators Statewide Emergency repairs and replacement of generators, engines, and ancillary equipment as well as preventative maintenance of prime power and emergency generators at various DCR State Parks and Recreation Facilities. It also includes the maintenance and repair of an off-grid Battery Bank. The estimated project Base Bid cost is $ 267,000.00 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Mechanical Systems and must submit with the bid an update of their respective qualifications.
11/03/2021 04:00 PM UTC
P22-3448-C7A
J. H. Thomas Memorial Pool, Springfield, MA Work consists of removal of the existing spray deck located inside the fenced in pool area and construction of a larger spray deck in the same location with at-grade spray features, new piping, and controls. All utilities, plumbing, materials and sitework associated with construction of new spray deck are included. The existing pool and spray deck's perimeter fence will be modified, and new fence installed to separate the pool and new spray deck to allow independent operation. The estimated project cost is $500,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
11/03/2021 04:00 PM UTC
P22-3448-M3A
Sub-BID : Plumbing -Pool Mechanical Services – DCR Pools in Central and Western Massachusetts Facilities within Worcester, Franklin, Hampshire, Hampden, and Berkshire counties Maintenance and repair of DCR Pools systems and equipment including filter and mechanical systems, pool shell and gutters, domestic plumbing, electrical, safety equipment, painting, and miscellaneous other items. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications. General Bidders shall be pre-qualified in Mechanical Systems and Plumbing, sub-Bidders in Plumbing.
10/27/2021 04:00 PM UTC
151 - 160 of 239 Solicitations
1 2 12 13 14 16 18 19 20 23 24