General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective September 2026 there will be an increase to the SDP requirements.


Requirements as followed: 

MBE: 10%
WBE: 14%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P27-3713-M1A
Fence and Guardrail Maintenance Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, and Worcester counties The project consists of installation of new and maintenance of existing fencing, guardrail, gates, and impact attenuators for scheduled and emergency related work throughout DCR properties. The estimated project cost is $ 12,000,000.00 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work is not completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in GUARD RAIL & FENCING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 10% for MBE (Minority Business Enterprise) 14% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
12/03/2026 05:00 PM UTC
P26-3632-C1A
New Solar Lighting - Peddocks Island Pier Location: Hull, MA The project consists of the construction of 13 new solar lighting pole structures on the existing pier on Peddocks Island with one additional solar lighting pole replacing an existing wired lighting pole on an existing concrete foundation off the pier. The estimated project cost is $499,834.00 The work is to be accomplished within 365 calendar days of a notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway Lighting to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 10% for MBE (Minority Business Enterprise) 14% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
12/17/2026 05:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
P18-3192-C2A
Contract No:P18-3192-C2A: Beartown Superintendent’s House Structural Repair The estimated project cost is $213,157.00
12/16/2020 04:00 PM UTC
P09-2580-C2A
Sub-Bids :ISLAND DISTRICT HEADQUARTERS BUILDING EXTERIOR RENOVATIONS: Sub-BID :Electrical; HVAC; Masonry; Metal Windows; Painting; Waterproofing, Damp proofing and Caulking.
12/16/2020 04:00 PM UTC
P18-3234-C1A
CAPE COD RAIL TRAIL EXTENSION WELLFLEET, MA The estimated project cost is $ 2,068,196. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
12/09/2020 04:00 PM UTC
P20-3354-C5A
Carpentry at DCR Facilities: Western & Central & Massachusetts Counties: Berkshire, Franklin, Hampshire Hamden,Worcester Estimate $ 700,000
11/25/2020 04:00 PM UTC
P20-3354-C4A
Carpentry at DCR Facilities - Eastern Massachusetts Essex ,Middlesex ,Suffolk ,Norfolk Worcester,Plymouth ,Bristol ,Barnstable The estimated project cost is $ 1,300,000
11/25/2020 04:00 PM UTC
P20-3341-M01 Catch Basin & Drainage Infrastructure Cleaning and CCTV Inspection
Catch Basin & Drainage Infrastructure Cleaning and CCTV Inspection Statewide The project consists of cleaning and/or investigation of DCR drainage infrastructure. Typically, work shall include, during regular and emergency response times, the cleaning of catch basin and manhole structures with a vacuum truck, high pressure water jetting of drainage lines, and CCTV investigation. This project shall also include the removal and disposal of all sediments in compliance with the regulations of the Department of Environmental Protection in effect at the time of disposal. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
10/28/2020 03:00 PM UTC
P20-3351-C3A Fire Alarm System at John Augustus Hall
Installation of a new fire alarm system including; all labor, electrical work, necessary equipment and materials. Demolition of existing non-functioning system, and testing of new system. The estimated project cost is $315,000 CONTRACTS FOR BUILDING PROJECTS ESTIMATED TO COST OVER $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. C. 149
10/22/2020 03:00 PM UTC
P20-3361-C5A: Painting and Minor Repairs to the Arthur Fiedler Footbridge over Storrow Drive
The project consists of concrete repairs to the bridge spans, approach ramps/abutments, installation of new expansion joints, application of concrete coating (including surface preparation and crack/joint treatments), and steel painting of columns (including surface preparation). Alternate 1 includes preparation and installation of anti-skid waterproofing on the bridge deck and approach ramp surfaces The estimated project cost is $ 890,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
09/28/2020 03:00 PM UTC
P21-3418-M1A
Contract No. P21-3418-M1A Overhead Door Maintenance Services Statewide The project consists of maintenance, repair, and replacement of existing overhead doors at various DCR statewide facilities The estimated project Base Bid cost is $ $200,000
09/16/2020 03:00 PM UTC
P20-3333-M4A Maintenance of Street Lighting Systems on DCR Parkways, Roadways and Properties
The project consists of performing preventative maintenance, repair, upgrading, and replacement of defective lighting systems on DCR parkways, roadways, and properties. The estimated project cost is $ 3,500,000.00 CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
07/29/2020 03:00 PM UTC
311 - 320 of 333 Solicitations
1 2 … 26 27 28 29 30 32 34