General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective October 2026 there will be an increase to the SDP requirements.


Requirements as followed: 

MBE: 10%
WBE: 14%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P26-3636-C6A
Project Shade: Lake Wyola State Park 94 Lakeview Road, Shutesbury, MA 01072 The project consists of the installation of tree protection, construction fence, and erosion control; installation of (3) small shade pavilions at south end of the site and installation of (1) medium pavilion at the north end of the site; installation of accessible paths, boardwalks, accessible parking improvements, picnic tables, grills and wood post and rail fencing; procurement, installation and maintenance of trees and shrubs, and seeding and establishment of lawn and meadow areas. See documents for list of Owner-supplied wood. The estimated project cost is $891,000.00. The work is to be accomplished within 273 calendar days of notice to proceed. Liquidated damages in the amount of 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
P26-3665-M6A
Bridge Maintenance and Repairs - Statewide The project consists of undertaking scheduled and emergency bridge repairs to bridges- statewide. The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of _500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Bridge Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
07/30/2026 04:00 PM UTC
P26-3663-C1A
New Bedford State Pier North Wharf Reconstruction The project consists selective demolition, over sheeting of the pier bulkhead, construction of new pile supported structures, float System improvements (gravity sewer line, power pedestals, lighting), grounds improvements (sink hole repair and ramp construction), installation of new gangway to the MEP floats, fence and gating improvements, repair of select Ro-Ro access structure piles, and concrete replacement to select areas of the North Wharf. The estimated project cost is $ 31,593,295.41 The work is to be accomplished within 395 calendar days of a notice to proceed. Liquidated damages in the amount of $1,200 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in MARINE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner, Nicole LaChapelle Massachusetts Department of Conservation and Recreation
08/20/2026 04:00 PM UTC
P26-3670-C1A
Drainage – Repair & Replacement The project consists of both emergency & scheduled repairs and/or adjustment of rebuilding of drainage structures to proper grade, as well as the emergency & scheduled repair and/or replacement, and installation of new & existing statewide DCR drainage infrastructure The estimated project cost is $10,500,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in DRAINAGE to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
08/20/2026 04:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Pavement Markings P20-3333-M3A
Installation of Reflectorized Pavement Markings On Parkways and Roadways of DCR Statewide CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M The project consists of installation of pavement markings on Parkways, Roadways and Parking Lots of the Department of Conservation and Recreation. This operation will call for two (2) or more truck mounted striping units of painting a minimum of twelve miles of pavement making (paint of thermoplastic) a day.
04/22/2020 03:00 PM UTC
Trail Repairs P20-3378-M1A
Contract No.: P20-3378-M1A Title: DCR Improved Surface Trail Repairs Location: Various: MIDDLESEX, ESSEX, SUFFOLK, NORFOLK, BRISTOL, WORCESTER, PLYMOUTH, BARNSTABLE AND DUKES COUNTIES CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M The project consists of unclassified excavation, pavement reclamation, pavement patching, full depth hot mix asphalt pavement, aggregate pathway installation, selective clearing and/or pruning, trailside root cutting, guard rail and fence installation, drainage structure installation, pavement markings, sign installation, landscaping and other work incidental to the rehabilitation of improved surface trails.
04/22/2020 03:00 PM UTC
Urban Tree Planting P20-3375-M1A
URBAN TREE PLANTING AND SUSTAINABLE AFTER CARE CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M The project consists of urban tree planting and tree maintenance on DCR parkways and other DCR properties.
04/22/2020 03:00 PM UTC
P19-3281-C1A-Walden Pond State Reservation Utility Upgrades
CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M This project consists of: Installation of new utilities and related landscape work as described in the bidding documents. Work includes installation of a new water line serving an existing bathhouse building, new water and electrical service to existing maintenance garage and horse barn buildings, installation of a septic manhole over an existing force main line and the installation of new conduit ductbank for future electrical and communications service to a new bathhouse. Landscaping work consists of tree protection, selective clearing, restoration and installation of new plantings.
04/22/2020 03:00 PM UTC
321 - 324 of 324 Solicitations
1 2 25 26 27 28 29 30 31 33 Next →