Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Effective  2024

There will be an increase to the SDP commitment requirements.
MBE and WBE  requirements will no longer be combined.
Requirements as followed: 

MBE: 6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
P25-3615-C2A
Cass Recreational Complex Roof and Solar Project Scope: The project consists of a new TPO membrane roof installed over the existing metal roof and installing photovoltaic panels. The PV systems include the panels, raceways, conductors, inverters, and connection to the existing buildings electrical equipment. The estimated project: $1,850,000 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Roofing Category and must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 AM UTC
P25-3593-M4A
Flooring Maintenance Installations at DCR Facilities Counties : Essex, Middlesex, Suffolk, Norfolk, Bristol, Plymouth, Barnstable, Dukes, Nantucket, Worcester, Hampden, Hampshire, Franklin, Berkshire The project consists of: The project consists of: Installation of various types of Flooring at DCR Facilities Statewide. Flooring types include epoxy flooring and wall coatings, ceramic tile, VCT tile, rubber matting. Locations include comfort stations, swimming pools, rinks and other DCR buildings. This is a work order contract for building sites to included comfort stations, swimming pools, rinks and other DCR buildings, not identified at this time. The estimated project $1,200,000.00 The work is to be accomplished within 912 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). Bidders must be certified in the appropriate category and prequalified in floor covering. and must submit with the bid an update of their respective qualifications. Brian Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/09/2025 05:00 PM UTC
P24-3566-C1A
SUB-BIDS (2): Section 040001 Masonry, Section 260000 Electrical Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) Individual sets of contract documents will only be available on DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. In the event that any addenda are issued throughout the open period for this project, DCR will distribute these addenda via Bid Express, which will also email identified prospective at the time plans and specifications are issued. A pre-bidding conference for prospective bidders will be held on Monday, January 6, 2025 at 10:30am at the Marine Park Bandstand, 1889 William J. Day Boulevard, Boston. Questions should be directed to nathaniel.tipton@mass.gov by Close of Business Wednesday, January 8, 2025 at 12:00PM, The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
01/16/2025 05:00 PM UTC
P19-3295-C1A
Mass Central Rail Trail, Wayside; Sudbury to Hudson Location: Wayside, Sudbury, Stow, and Hudson, MA The project is the construction a 10-ft wide paved, shared-use path along 7.5 miles of the Mass Central Rail Trail (MCRT) Wayside corridor from the Eversource Driveway approximately 900 feet east of Landham Road in Sudbury to the Assabet River Rail Trail off Wilkins Street in Hudson. The project includes installation of facilities for road crossings, paving, fencing/ railing installation, landscaping, hardscape, site amenities, pavement markings, signage and final restoration of all areas within the work zone. The estimated project cost is $ 7,000,000 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - BIKE PATHS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
01/23/2025 05:00 PM UTC
P24-3566-C1A
General Bid: Marine Park Bandstand Improvements – Phase I (officially known as the Harry G. Uhlman, Jr. Bandstand) The project consists of demolishing the existing terrazzo roof and asphaltic waterproofing membrane down to the bare structural concrete sub-roof, and complete removal of the limestone roof edging. Replacement with a new zinc-coated copper radiused flat seam roof over wood sleepers and new waterproofing membrane, cast concrete cornice stones with Kryton waterproofing admixture, and repointing of the brick rooftop lantern, with various repairs to the lantern’s limestone cap and base stones. Removal and replacement of bandstand ceiling and lighting, with a period-correct faux coffered ceiling, and LED lighting. Replacement of the Lantern’s Faux oculus panels with storm proof louvers. Adding Life safety exit and emergency lighting in the unoccupied basement storage area for code compliance. The Project Estimate $429,111 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 2,000 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in the category they are bidding, and must submit with the bid an update of their respective qualifications. General bidders must be certified in Roofing. Brian M. Arrigo Massachusetts Department of Conservation and Recreation  
01/30/2025 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
P18-3245-C1A
Rehabilitation of Lowell Memorial Park, Fresh Pond Parkway and Brattle Street, Cambridge, MA The project consists of site preparation, grading, pathway paving, wall repair, tree removal and pruning, planting, irrigation, lighting, and site furnishings. The estimated project cost is $ 1,225,000.00 The work is to be accomplished within 365 calendar days of a notice to proceed. Liquidated damages in the amount of __$500___ per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in _Landscaping including Tree Planting to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
11/01/2023 04:00 PM UTC
P22-3441-C7A
General Bid: College Pond Bathhouse Renovation GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM Wednesday, October 4, 2023 through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. Sub-BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, September 20, 2023, for the following FILED SUB- BIDS: 22 0000 PLUMBING , 26 0000 ELECTRICAL will be received through DCR’s E-bid room www.bidexpress.com/businesses/36765/home. The estimated project Base Bid cost is $600,000. This project consists of renovations to the College Pond Bathhouse, sitework, and accessible improvements. The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
10/25/2023 04:00 PM UTC
P24-3543-M1A
Generators, Maintenance of Emergency Generators Locations: Barnstable, Berkshire, Bristol, Essex, Franklin, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk, Worcester, Dukes, Nantucket The project consists of emergency repairs and replacement of generators, engines, and ancillary equipment as well as preventative maintenance of prime power and emergency generators at various DCR State Parks and Recreation Facilities. It also includes the maintenance and repair of an off-grid Battery Bank. The estimated project: $277,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Mechanical Systems and must submit with the bid an update of their respective qualifications
10/25/2023 04:00 PM UTC
P22-3441-C7A
Sub Bid Plumbing : Sub Bid Electrical : College Pond Bathhouse Renovation Myles Standish State Forest, Plymouth, MA Sub-BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, September 20, 2023, for the following FILED SUB- BIDS: 22 0000 PLUMBING , 26 0000 ELECTRICAL will be received through DCR’s E-bid room www.bidexpress.com/businesses/36765/home. GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM Wednesday, October 4, 2023 through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home The estimated project Base Bid cost is $600,000. This project consists of renovations to the College Pond Bathhouse, sitework, and accessible improvements. The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
10/11/2023 04:00 PM UTC
P23-3484-C10A
P23-3484-C10A Factory Hill Park and Moynihan Playground Improvements LOCATIONS: Factory Hill Park, Town St., Hyde Park, MA. Moynihan PG, 920 Truman Pkwy, Mattapan, MA. Projects consist of the removal of pavements, bench footings, unit pavers (setts) , engineered wood fiber, concrete blocks, concrete curb, concrete game tables and stools, and miscellaneous site elements and the installation of new timber guardrail, new removable bollard, new play surfacing, new stabilized stone dust paving, new bituminous concrete paving, new benches, new game tables, new engineered wood fiber, new play equipment, and seeding. Contractor will coordinate the provision and installation of play structures by others with the play structure installer and DCR. The estimated project cost is $ 581,005 The work is to be accomplished within 120 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
10/04/2023 04:00 PM UTC
P24-3552-M1A
Western & Central MA Roads, Trails, & Parking Lot Improvements Counties: Berkshire, Franklin, Hampshire, Hampden, Middlesex, and Worcester GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday, September 27, 2023 through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. The project consists of Placement of bituminous concrete pavement and road improvements and rehabilitation. The contract contains price adjustment for hot mix asphalt mixtures. The bid price provided for hot mix asphalt mixtures shall be based on the cost of asphalt cement of $662.50/liquid ton as set by MASSDOT (New method) for the month of June 2023. All work will be performed on DCR properties within Berkshire, Franklin, Hampshire, Hampden, Middlesex, and Worcester counties. The estimated project cost is $8,000,000.00. The work is to be accomplished within 820 calendar days of a notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY - CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
09/27/2023 04:00 PM UTC
P24-3553-C3A
Ryan Wading Pool Construction 350 River Street, Mattapan, MA This project consists of demolition of existing site amenities including pool/spray deck, deck aprons, piping, and pool filtration equipment/controls. Installation of a new ADA compliant concrete wading pool with new concrete pool aprons, new stainless-steel gutters, new spray features, new pool filtration/controls and new pool surfaces (PIP rubber). The estimated project cost is $ 2,500,000.00 The work is to be accomplished within 240 calendar days of a notice to proceed. Liquidated damages in the amount of 1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
09/13/2023 04:00 PM UTC
P24-3552-C1A
Charlesgate Park Wall Removal Location: Boston, MA The project consists of deconstruction, disposal, and restoration work associated with non-structural granite-faced reinforced concrete wall(s) positioned below the Bowker Overpass in Charlesgate Park in Boston, MA. Proposed work generally includes removing the wall(s) down to the top of buried pile caps, pouring concrete caps, backfilling the displaced volume, restoring the impacted surfaces, and restoring the bridge drain pipes and associate incidental work. The project includes a Base Bid and one (1) Additional Bid Alternative. Generally, the Base Bid includes work associated with removal of the North Wall, and the Additional Bid Alternative include work associated with removal of the South Wall. The estimated project cost is: • Base Bid: $281,000.00 • Base Bid with Add. Alt: $495,000.00 The work is to be accomplished within (273) calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE - CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
09/13/2023 04:00 PM UTC
P23-3497-M10A
Flooring Maintenance Installations at DCR Facilities Barnstable,Berkshire,Bristol,Essex,Franklin,Hampden,Hampshire,Middlesex,Norfolk,Plymouth,Suffolk,Worcester, Dukes, Nantucket Installation of various types of Flooring at DCR Facilities Statewide. Flooring types include epoxy flooring and wall coatings, ceramic tile, VCT tile, rubber matting. Locations include comfort stations, swimming pools, rinks and other DCR buildings. This is a work order contract for building sites to included comfort stations, swimming pools, rinks and other DCR buildings, not identified at this time. The estimated project cost is $850,000.00 The work is to be accomplished within 1095 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). Bidders must be certified in the appropriate category and prequalified in FLOOR COVERING and must submit with the bid an update of their respective qualifications.
08/30/2023 04:00 PM UTC
P24-3542-M2A
Plumbing Maintenance & Repairs Counties: Essex, Middlesex, Suffolk, Norfolk, Worcester, Plymouth, Bristol, Barnstable & Dukes Maintenance, repair, and replacement of domestic and commercial plumbing systems in DCR Facilities in Eastern & Central Massachusetts. Work will include all labor, materials and equipment needed to address individual plumbing repairs, equipment and fixture replacement, small renovation projects, required permitting and other associated work needed to adequately complete individual projects. The estimated project cost is $2,500,000 The work is to be accomplished within 912 calendar days (2.5 years) of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Bidders must be certified in PLUMBING and must submit with the bid an update of their respective qualifications.
08/30/2023 04:00 PM UTC