General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
UAF IFB D22106 UTSLA
Utilities Steam Line Repairs Utilidor H and F The work consists of installation of Owner Furnished valves, including two (2) 10-inch Cast Steel Rising Stem Gate valve and six (6) 14-inch Cast Steel Rising Stem Gate valves to the steam line located in the utilidor system on the UAF Troth Yeddha' Campus. Construction Range: $100,000 - $500,000
02/13/2024 11:00 PM UTC
UAF RFP D22087 MUPAD
Museum Planetarium Addition The University of Alaska Fairbanks is seeking proposals from companies qualified and interested in providing Construction Manager at Risk services. The scope of work for this project is to construct a 5500 gross square feet (gsf) addition to the University of Alaska Museum of the North (UAMN) to house a 60-70 seat planetarium with a 10-meter dome. The addition will be located to the west of the current museum building, with connectivity to the existing space. Design elements and aesthetics on the exterior will be complimentary with the existing architecture while interior spaces will be designed to modern standards for a state-of-the-art planetarium. Construction range: Over $5,000,000
01/13/2024 02:00 AM UTC
UAF IFB D22122 SDR22
The Work consists of concrete and welding repair work to the existing dock along with an additive alternate for dolphin anodes. Construction Range: $100,000 - $500,000
12/19/2023 11:00 PM UTC
UAF IFB D23052 UPSWR
University Park South Wing Roof Replacement The Work consists of replacing the existing built-up tar/felt roof on the south wing of the University Park building with a single-ply EPDM roof that complies with ASTM D4637, as well as improvements to roof seismic strength and storm drainage. Asbestos abatement is required. Construction Range: $1,000,000 to $1,500,000
11/07/2023 11:00 PM UTC
UAF IFB D23065 DUREM
Duckering 241 Rare Earth Minerals Lab Renovations The Work consists of installing new finishes (paint, flooring, ceiling tiles); upgrading HVAC, plumbing, and electrical systems; and modifying and refurbishing casework and countertops. Additive Alternate work includes building a partition between Rooms 241A and 241B, including a new hollow metal door, frame, hardware, and all associated work. Construction Range: $1,000,000 - $5,000,000
08/22/2023 10:00 PM UTC
UAF IFB D22022 UTHVS
Utilities Hess Village Sanitary Sewer Lift Station The Work consists of the replacement of two (2) existing lift station pumps and associated valves. A new ventilation system will be installed within the drywell space of the lift station. Construction Range: $100,000 - $500,000
07/13/2023 10:00 PM UTC
UAF IFB D20087 RLSS
Rasmuson Library Student Success Center The Work consists of remodeling the sixth floor of Rasmuson Library into a center of student support services. Work provides a new floor plan with improvements to architectural, mechanical, and electrical features. Areas on adjacent floors are impacted. Additive Alternates are present for the demolition of exterior wall precast panels and replacement with a curtainwall system. Construction Range: $5,000,000 +
06/27/2023 10:00 PM UTC
UAF IFB D23063 NANH
Nenana Airport ACUASI Hangar The work consists of constructing a hangar that is approximately 4,800 square feet to support the UAF Alaska Center for Unmanned Aircraft System Integration (ACUASI) program, complete with site work, utilities, and a completely functional building. Additive alternate work includes paving the vehicle parking area and all associated work. Construction Range: $1,000,000 - $2,500,000
06/09/2023 10:00 PM UTC
UAF IFB D23062 CWSS1
Campus Wide Sidewalks and Stairs Rebuild FY23 The Work consists of the demolition and replacement of various sidewalks, ramps, and stairs between the Arctic Health Research Building, Koyukuk Way, and Irving 1 Building. Construction Range: $100,000 - $500,000
05/31/2023 10:00 PM UTC
UAF IFB D23030 DUHO
Duckering Heavy Oil Lab Renovation The Work consists of renovating the Duckering Heavy Oil Lab located in Rooms 430, 432, and 434. Major tasks include: Install a VRF-style ductless air conditioning system; remove and replace affected flooring with limited abatement of asbestos mastics; strip and wax all VCT flooring throughout the work site; remove and replace acoustical ceiling tiles; remove and reinstall affected ceiling mounted devices; patch and paint all walls and affected gypsum ceilings; upgrade light fixtures from fluorescent to LED; and replace selected electrical devices. Construction Range: $100,000 - $500,000
05/18/2023 10:00 PM UTC
11 - 20 of 66 Solicitations
2 4 5 6 7