General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
UAF RFP D22087 MUPAD
Museum Planetarium Addition The scope of work for this project is to develop a design for the construction of an addition to the University Museum of the North (UAMN).
03/05/2022 02:00 AM UTC
UAF IFB D20081 ENSI
Engineering Facility Schaible Auditorium Improvements The Work consists of renovating the Schaible Auditorium which includes demolishing the existing auditorium fixed seating and installing new Owner furnished fixed seating, repairing or replacing all major architectural finishes, replacing the lighting and controls, modifying specific mechanical and plumbing systems, and removing and reinstalling various audio-visual components. There will be four (4) additive alternates for installing new flooring, a backlit UAF logo sign, wainscot, and an LED linear strip cove light system within the soffits. Construction Range: $500,000 - $1,000,000
02/24/2022 11:00 PM UTC
UAF IFB D20066 CWLL
Campus Wide Lathrop and Lola Tilly Cooling Base bid work consists of installing a comfort cooling system in Lathrop Hall by installing direct expansion cooling coils into existing air handlers in the penthouse. Additive Alternate #1 consists of installing comfort cooling systems in the Lola Tilly Buildings by installing direct expansion and hydronic cooling coils into existing air handers in the basement and installing split system AC units on the third floor. Additive Alternate #2 work consists of installing split system AC units in the corridors of floors 2-5 of Lathrop Hall. Construction Range: $500,000 - $1,000,000
02/22/2022 11:00 PM UTC
UAF IFB D21106 WCBR
Wood Center Bowling Alley Renovation The Work consists of replacing eight (8) lanes of bowling equipment including: pinsetters, inside and outside kickbacks, bowler’s touch screen consoles, and front desk management computer and software. Construction Range: $100,000 - $500,000
02/03/2022 11:00 PM UTC
UAF IFB D21050 PLHB1
Parking Lot Headbolt Replacement Phase 1 The Work consists of replacing the headbolt outlet system for the Bunnell Parking Lot (3G). All existing headbolt posts will be demolished and replaced with new precast concrete posts. The transformer and switchboard for the west half of the lot will be demolished. The transformer for the east half of the lot will be relocated, and a new 12,470V primary feeder will be installed from the utilidor blister. A new owner furnished, contractor installed switchboard will be installed to serve new branch circuit panels. The Work includes one Additive Alternate. Construction Range: $100,000 - $500,000
02/02/2022 11:00 PM UTC
UAF IFB D21029 BNME
Bunnell Elevator Modernization The Work consists of demolishing the existing elevator, hydraulic jack, controller, tank, and pump assembly, and installing a new machine-roomless (MRL) elevator with a digital controller, traveling cable, car, and finishes. Work also consists of adding a roof bump out to accommodate machinery at the top of the hoistway, and relocating fire alarm devices in the hoistway. Construction Range: $100,000 - $500,000
01/04/2022 11:00 PM UTC
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying locker room spaces in the Patty Center. Tasks will include demolition, new architectural finishes, plus mechanical, plumbing and electrical modifications. Construction Range: $100,000 - $500,000
12/20/2021 11:00 PM UTC
UAF IFB D20066 CWLL
Campus Wide Lathrop and Lola Tilly Cooling The Work consists of installing whole building comfort cooling systems in the Lola Tilly and Lathrop Hall buildings. Work includes installation of direct expansion and chilled water systems integrated into existing duct work and the installation of split system AC units. Construction Range: $500,000 - $1,000,000
11/11/2021 11:00 PM UTC
UAF RFP D20087 RLSS
Rasmuson Library Student Success Center The scope of work for this project will be to provide professional services to develop programming and preliminary design through contract documents for a new Student Academic Success Center.
10/08/2021 01:00 AM UTC
UAF IFB D20052 SKEM
Skarland Hall Elevator Modernization The Work consists of modernizing and upgrading the existing elevator which will include demolishing the existing elevator hydraulic jack, controller, tank, and pump assembly. A new machine roomless (MRL) elevator will be installed with digital controller, traveling cable, car, and finishes. A new elevator pit sump pump will be installed, and smoke doors will be provided at all levels except the primary floor. Door magnets will be provided for smoke doors, and fire alarm devices will be relocated in the hoistway. Construction Range: $100,000 to $500,000
09/22/2021 10:00 PM UTC
41 - 50 of 66 Solicitations
1 2 3 5 7