General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF RFP D25036 CWFT25
Campus Wide Flooring Maintenance Term 2025 The University of Alaska Fairbanks (UAF) is seeking Proposals to create a pool of three (3) term contractors to perform general flooring installation and related services of a reoccurring nature with delivery and schedules indefinite. Total annual contract amount shall not exceed $200,000 with each individual project not exceeding $25,000 and no guarantee of a contract minimum. The initial term will be from the date of award through December 31, 2025 and four (4) one-year options to renew through December 31, 2029.
12/13/2024 11:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
UAF IFB D23066 SHPFL
Signers' Hall Levels 1 and 2 Finishes and Lighting Refresh The Work consists of replacing flooring, upgrading lighting, expanding the reception area, including removing a service counter and installing a new one, and painting common areas and offices on Levels 1 and 2 of Signers’ Hall. Work will extend into the corridor leading to the Eielson building and the restrooms off of this hallway. Additive alternates will extend finishes into additional offices. Construction Range: $200,000 to $600,000
05/09/2023 10:00 PM UTC
UAF IFB D23050 CDIR
Chandalar 1060 Interior Renovations The Work consists of renovating the interior of the residential duplex located at 1060 North Chandalar Drive on the University of Alaska Fairbanks campus. Renovations include, but are not limited to, kitchen cabinets, plumbing fixtures, electrical fixtures, new paint, flooring, and exterior doors. Construction Range: $100,000 - $500,000
04/20/2023 10:00 PM UTC
UAF IFB D23035 PCGR
Patty Center Gym Refresh - Ceiling The Work of the Base Bid consists of replacing ceiling tiles in the Patty Center gym with Owner-furnished, Contractor-installed (OFCI) tiles, retrofitting light fixtures with OFCI LED bulbs, removing four (4) basketball hoop assemblies, and constructing improvements to the announcer’s booth. Alternate 1 work consists of demolishing a track-mounted accordion partition, repairing the wall and ceiling where the partition was removed, and painting the announcer’s booth door. Construction Range: $100,000 - $500,000
03/15/2023 10:00 PM UTC
UAF RFP D23002 CWR23
Campus Wide Roof Maintenance FY23 The University of Alaska Fairbanks, hereinafter called “University”, is seeking proposals from contractors interested and qualified in providing general roof maintenance, repair and replacement services for projects of a reoccurring nature with indefinite deliveries, schedules and quantities. Contracts may be awarded to create a pool of up to five (5) term contractors. Total contract amounts shall not exceed $2,000,000 annually with each individual project not to exceed $750,000 and no guarantee of a contract minimum. The initial term will be from the date of award through December 31, 2023 and four (4) one-year options to renew through December 31, 2027.
03/04/2023 02:00 AM UTC
UAF RFP D23032 CWMTC
Campus Wide Maintenance Term Contracts The University of Alaska Fairbanks, hereinafter called “University”, is seeking proposals from contractors interested and qualified in providing general facility maintenance construction services for Campus Wide Maintenance Contracts. The maintenance construction services are of a reoccurring nature with indefinite deliveries, schedules and quantities at the Fairbanks campus. Contracts will be awarded to create a pool of up to five (5) term contractors. Total annual contract amounts shall not exceed $200,000 annually with each individual service not to exceed $50,000 and no guarantee of a contract minimum. The initial term will be from the date of award through December 31, 2023 and four (4) one-year options to renew through December 31, 2027.
02/09/2023 02:00 AM UTC
UAF IFB D22121 CTCBR
CTC Aviation Hangar Bi-Fold Door Replacement The work consists of replacing a structural steel door header and bi-fold hangar door at the UAF CTC Aviation Hangar located at Fairbanks International Airport. Construction Range: $100,000 - $500,000
01/05/2023 11:00 PM UTC
UAF RFP D18068 BHPR
Bartlett and Moore Hall Modernization and Renewal The University of Alaska Fairbanks is seeking proposals from companies qualified and interested in providing Construction Manager at Risk services. The project scope affects all levels of Bartlett Hall and Moore Hall. Degraded restroom wall, floor and ceiling finishes will be removed to provide access to concealed plumbing and will be replaced with durable and low maintenance finishes. All horizontal copper plumbing and vertical cast iron stacks will be removed and replaced. Toilet partitions, bathroom and shower accessories and plumbing fixtures will be replaced. Mechanical ventilation systems will be repaired or replaced where required. Lighting throughout each building will be upgraded to energy efficient LEDs. Asbestos, lead based paints and any other hazardous materials will be surveyed, documented and abated where necessary. Sleeping quarters, lounges, laundries and other public spaces will also be renovated. Space in Hess Commons will be converted into ADA compliant restrooms. Construction Range: Over $5,000,000
10/19/2022 01:00 AM UTC
UAF IFB D22073 BUDC
Butrovich Data Center Chiller Replacement The Work consists of replacing the Butrovich Data Center chilled water condensers and circulator pumps. Work will be performed during winter so that the existing dry coolers to remain can carry the cooling load of the Data Center during construction. Construction Range: $1,000,000 - $1,500,000
10/04/2022 10:00 PM UTC
UAF IFB D22013 HSCR
Student Health and Counseling Center Renovations-Phase1 The Work consists of major interior demolition, asbestos abatement, and the construction of new framed walls, ceilings, doors, and finishes. Lighting will be converted from fluorescent to LED fixtures. Mechanical and plumbing will be modified as required to support the new room layouts. Construction Range: $500,000 - $1,000,000
09/21/2022 10:00 PM UTC
UAF IFB D22099 FASC1
Fine Arts Salisbury Theater Code Corrections Phase 1 The Work consists of code corrections within the Salisbury Theater. Work will include updated construction of walls, doors, frames, hardware, and finishes; structural framing and curbs for roof top smoke vents; emergency lighting and alarm system upgrades, fire suppression modifications, as well as fire stopping seals and dampers. Construction Range: $500,000 - $1,000,000
07/29/2022 10:00 PM UTC
21 - 30 of 66 Solicitations
1 3 5 6 7