General Info

Business Logo

Solicitations and notifications are free for this business.

University of Alaska Fairbanks - Design and Construction

1850 Tanana Drive, Fairbanks, AK 99775-0001
(907) 474-5299

The Mission of Design and Construction is to define, plan, and develop the infrastructure, land, and facilities to meet the needs of the university and the community, and to provide engineering support for the maintenance, operations, design, and construction divisions of Facilities Services. The functional units within Design and Construction are Project Management, Facilities Engineering and AutoCad Support.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
UAF IFB D25053 CPTI
Combined Heat and Power Plant Turbine Inspection The Work consists of the two-year minor inspection and testing on the turbine, generator, exciter, and associated equipment for UAF's 17 MW Steam Turbine Generator No. 4. All Work must be accomplished during the planned overhaul period, completed by qualified and competent personnel trained and certified to complete the Work. Construction Range: $100,000 - $500,000
04/10/2025 10:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
UAF IFB D21062 ELSC
Elvey Deferred Maintenance‐South Entry Canopy The  Work  consists  of installation  of  a  non‐combustible  canopy  at  the  Elvey  building  south  entrance.  Work includes demolition of the concrete topping slab. New construction includes steel framing, steel stud parapet framing, non‐insulated roof assembly, sheet metal flashings, metal soffit and siding panels, exterior lighting, concrete topping slab, and signage. Construction Range: $100,000 - $500,000
06/03/2021 10:00 PM UTC
UAF IFB D21007 CWSE21
Campus Wide Sidewalk Renovations FY21 The Work consists of to repair and replace broken sidewalks and pedestrian pathways in the Cornerstone Plaza between the Rasmuson Library and the Bunnell Building. Construction Range: $100,000 - $500,000
05/18/2021 10:00 PM UTC
UAF IFB D21009 PCRA
Patty Center Athletics Space Renovations The Work consists of modifying existing spaces in the Patty Center to create new office space and additional locker rooms. Tasks will include demolition, new architectural finishes, and mechanical, plumbing and electrical modifications.
04/30/2021 10:00 PM UTC
UAF IFB D20083 MBSFU3
MBS Complex Fire Alarm Upgrades Phase 3 The Work consists of upgrading the smoke control system to current code requirements. Infill existing smoke shaft louvers and roof hatch. Provide smoke doors in all elevator lobbies except the primary floor. Doors will be held open with door magnets that will release in a fire alarm event.
04/13/2021 10:00 PM UTC
UAF IFB D21068 CUWR3
Cutler Apartments Window Replacement Phase 3 The Work consists of replacing the existing wood framed windows with triple‐pane low‐E vinyl windows with solid‐surface sills and metal blinds at the Cutler 300 and 600 apartment blocks.
03/31/2021 10:00 PM UTC
UAF IFB D19107 CWNS
Campus Wide Sustainable Native Art Studios Renovation The Work consists of the renovation of Room 301 of the Fine Arts Building. Renovations include architectural, mechanical and electrical upgrades to improve the use of the space.
02/25/2021 11:00 PM UTC
UAF IFB D20090 ASFR
Alaska Satellite Facility Generator Replacement The Work consists of the installation of a new 300kW/375kVA, 480-volt diesel engine generator to replace of the current 200kW unit. The work will include a new automatic transfer switch and associated relays, controls, louver actuators, and fuel tank
02/24/2021 11:00 PM UTC
UAF IFB D20074 FAFC
Fine Arts Salisbury Theater Fire Curtain The Work consists of demolishing and replacing an asbestos laden fire curtain, and select system components and connecting new fire curtain to the existing fire alarm system.
01/19/2021 11:00 PM UTC
UAF IFB D19133 ELDMCW
Elvey Deferred Maintenance Curtain Wall Repair The Work consists of selective demolition of the Elvey building envelope. Building envelope will be modified and built back to redirect curtain wall drainage to shed to exterior. Work includes abatement, spray-applied fire proofing, framing, interior and exterior finishes.
01/07/2021 11:00 PM UTC
UAF IFB D19059 CWEBU
Campus Wide Exterior Building Entry Upgrades - Patty The Work consists of replacement of multiple storefront entries and installation card access systems across the Patty Center complex. The work is broken into a base bid for two entrances and their associated doors and security work and two additive alternates for the balance of entries and associated security work.
12/03/2020 11:00 PM UTC
61 - 70 of 70 Solicitations
1 2 3 4 5 7 Next →