2025 Traffic Signal Improvements
The City of Perrysburg hereby invites qualified firms to provide all labor & materials for the reconstruction of traffic signal installations at Indiana Avenue/Elm Street intersection and Indiana Avenue/E. Boundary Street Intersection.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
Engineering Estimate for the entire project: $ 500,000
| 04/17/2025 06:00 PM UTC |
Crew Truck Buildout
The Utility Department has recently purchased a 2025 5500 Crew Cab Chassis 4x4 truck. The City is now requesting a buildout of an enclosed service body to be mounted on that chassis.
Engineer's Estimate: $90,000.00
| 04/17/2025 06:00 PM UTC |
Perrysburg 2025 Pavement Markings
This project will consist of pavement marking in various locations across the City of Perrysburg. Due to fading, the existing pavement markings need new paint to be applied to them. All paint must adhere to the Ohio Manual of Uniform Traffic Control Devices standards.
EARLIEST START DATE: June 1, 2025
FINAL COMPLETION DATE: July 31, 2025
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
Engineering Estimate for the entire project: $ 120,000
| 04/10/2025 06:00 PM UTC |
Perrysburg 2025 Sidewalk Program
Perrysburg 2025 Sidewalk Program
This project consists of repairing City sidewalks by lifting, leveling or grinding of any City sidewalk section that has been identified in need of repair or fully replacing sections that are beyond the repair specifications.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid.
As part of the 2024 Sidewalk Program approximately 28,920 sf of sidewalk was lifted, 1,440 sf of sidewalk was replaced and 176 lf of sidewalk was ground down.
Engineering Estimate for the entire project: $ 200,000
| 04/10/2025 06:00 PM UTC |
SOQ for Implementation of Trimble Unity Maintain Asset Management Software
The City of Perrysburg Department of Public Utilities (DPU) is seeking Statement of Qualifications (SOQ) from firms to provide comprehensive implementation services for the Trimble Unity Maintain asset management software, associated GIS services, and software integration. This twelve-month contract will involve all aspects of GIS services as outlined in the technical specifications. The selected firm will be responsible for enhancing the City’s current ESRI ArcGIS and databases, ensuring the information is effectively utilized for communication with residents, City administration, and external organizations.
| 04/03/2025 06:00 PM UTC |
Downtown Streetscape Phase 1
This project consists of milling and resurfacing, road widening, curb replacement, sidewalk replacement, paver installation, planter installation, and other appurtenances for the 300 block of Louisiana Avenue.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion for the project: November 15, 2025
Engineering Estimate for the project: $1,500,000
| 03/20/2025 06:00 PM UTC |
2025 Annual Resurfacing Program
2025 Annual Resurfacing Program
This project consists of milling and resurfacing, curb replacement and other associated work of Ottawa Lane, Delaware Drive, Adams Court, Chippewa Lane, Cranden Drive, Cranden Court, Ottekee Drive, Mohawk Drive, Tonbridge Court, Woodstream Road.
The 2023 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Perrysburg Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Perrysburg Engineering Department, 127 West Fifth Street, Perrysburg, OH 43551. State prevailing wages shall apply.
All work is located within the City of Perrysburg corporation limits and is thereby eligible for City Income Tax collection.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any Alternatives that are accepted.
Final Completion: on or before October 31, 2025
Engineering Estimate: $ 1,605,000.00
| 03/20/2025 06:00 PM UTC |
RFQ for SSO Elimination Plan
In recent decades, the City of Perrysburg has undertaken extensive efforts to address environmental challenges, particularly those associated with its sewer collection system and wastewater treatment plant. These initiatives have been monitored and guided by the Ohio Environmental Protection Agency (Ohio EPA).
The Ohio EPA Director's Final Findings and Orders, issued on December 19, 2023, delineate the regulatory framework and compliance mandates for the City of Perrysburg. The Orders primarily address critical issues such as Combined Sewer Overflows (CSOs) and Sanitary Sewer Overflows (SSOs), which have historically impacted the city's sewer infrastructure and the Maumee River.
The document comprehensively outlines the city's progress in mitigating CSOs since the mid-1970s, including the submission of a Long Term Control Plan (LTCP) in 1996 and the execution of subsequent sewer separation projects. Despite these efforts, certain overflows persisted, necessitating the issuance of the Final Findings and Orders by the Ohio EPA to ensure continued compliance and further reduction of SSOs.
The Orders stipulate specific directives for the City of Perrysburg to develop and implement a Sewer System Evaluation Study (SSES), a Capacity, Management, Operation, and Maintenance (CMOM) Program, and an SSO Elimination Plan. These measures are designed to achieve the systematic cessation of SSOs, enhance the management of the city's sewer system, and safeguard public health and the environment.
The City of Perrysburg (City) is requesting statements of qualifications (SOQs) for engineering services to comply with Order (1)(c) of the fully executed DFFO.
| 03/07/2025 07:00 PM UTC |
RFQ for design of MUP Extensions and PHBs
The City of Perrysburg wishes to enhance safety for pedestrians and bicyclists by extending existing multi use paths and adding pedestrian hybrid beacons at three (3) separate locations.
The CITY is now requesting Statements of Qualification (SOQs) to provide design and consulting services for the creation of construction documents needed to construct the multi-use path and pedestrian hybrid beacons.
| 03/07/2025 07:00 PM UTC |
WWTP Digester Improvements Phase 2
In general, the work consists of a new fixed cover digester, a new membrane digester cover, new boilers and heat exchangers, and improvements to the digester gas and sludge piping.
A Mandatory pre-bid meeting will be held on October 30, 2024 at 1:30 PM at City of Perrysburg WWTP Facility located at 1 West Boundary Street, Perrysburg, Ohio. Attendance at the pre-bid meeting is Mandatory.
This contract is subject to the provision of State of Ohio, Prevailing Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds.
In order to be considered responsive, the contractor and all subcontractors will need to comply with City Ordinance 08-2023 which was passed in April of 2023. A copy of the Ordinance 08-2023 is included in the attachment list.
Engineering Estimate for the entire project: $8,000,000.00
| 11/07/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.