General Info

Business Logo

City of Perrysburg

201 W Indiana Ave, Perrysburg, OH 43551-1525
(419) 872-7880


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
John Deere 344L Compact Wheel Loader or Approved Equal
(1) New John Deere 344L Compact Wheel Loader or Approved Equal. Compact Wheel Loader delivered to City of Perrysburg Wastewater Treatment Plant. Engineer's Estimate: $200,000.00
03/10/2023 07:00 PM UTC
Municipal Pool Operations and Management
The City of Perrysburg is seeking bids from qualified consultants to manage and operate the Perrysburg Municipal Pool, located at 915 Elm Street, Perrysburg, Ohio 43551. The City’s objective is to have the Consultant maintain the swimming pool in a safe, clean, hazard-free manner and in compliance with all applicable governmental standards and regulations. It is also part of the objective to have the Consultant operate the swimming pool in such a manner that patrons are encouraged to use the facilities and that all facilities and operations reflect well on the City of Perrysburg. Engineer's Estimate = $247,500.00
03/03/2023 07:00 PM UTC
2023 Sidewalk Repair Program
Perrysburg 2023 Sidewalk Program This project consists of repairing City sidewalks by lifting, leveling or grinding of any City sidewalk section that has been identified in need of repair or fully replacing sections that are beyond the repair specifications. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid. As part of the 2022 Sidewalk Program approximately 39,000 sf of sidewalk was lifted (1,941 slabs), 2,600 sf of sidewalk was replaced (130 slabs) and 290 lf of sidewalk was ground down (70 slabs). Engineering Estimate for the entire project: $ 200,000
02/17/2023 07:00 PM UTC
RFQ Downtown Streetscape Improvements
The City of Perrysburg (hereinafter referred to as “CITY”) is soliciting qualifications from landscape architectural, engineering, urban planners, or other firms for the design and engineering services that include the design of streetscape improvements along Louisiana Avenue from Front Street to Third Street in the historic downtown.
01/13/2023 07:00 PM UTC
Seventh Street and Elm Street Sewer Improvements
7th Street Sewer Repair - This project consists of removal and replacement of 390' of 10" Sanitary Sewer. Including restoration and other appurtenances. Elm Street - This project consists of the replacement of approximately 108 feet of 12 inch sanitary sewer, repair of an outside drop structure and other appurtenances. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid. Final Completion: August 1, 2023 Engineering Estimate: $ 300,150.00
01/13/2023 07:00 PM UTC
Biosolids Management Services
In general the work consists of: land application of dewatered wastewater biosolids on agricultural fields arranged by the Bidder; applicable reporting requirements under the City’s Biosolids Standard Operating Procedures and meeting Ohio EPA requirements; and an alternate item to transport to a landfill. Specific bidding questions must be posted on the Bid Express website so that all questions and answers are visible to all bidders. The City reserves the right reject any and all bids; and reserves the right to accept or reject any and all optional bids offered; and reserves the right to waive any minor informalities or irregularities in the bids received. The City reserves the right to accept any Bid which is deemed most favorable to the City. The contract shall be awarded for the period of three (3) years. The Engineer's Estimate for the project is $134,000 (for one year)
12/02/2022 07:00 PM UTC
2022 Street Tree Planting
2022 Street Tree Planting This project consists of planting various street trees in the tree lawn. An address list will be provided to the successful contractor and the tree locations will be marked with a stake. All work is located within the City of Perrysburg corporation limits and is thereby eligible for City Income Tax collection. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid. Final Completion: on or before May 31, 2023 Engineering Estimate: $ 95,000
11/11/2022 07:20 PM UTC
Fire Department Storage Building
Fire Department Storage Building This project consists of the construction of a storage building near the edge of the existing parking lot located at the existing Fire Station (26100 Fort Meigs Road). Driveway, sidewalk, seeding and other miscellaneous items to make the proposed storage building complete and operational are also included. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any alternates selected. The Completion Date for the project is July 31, 2023 Engineering Estimate: $ 60,000
10/28/2022 06:00 PM UTC
West Boundary Multi Use Path
The City of Perrysburg (hereinafter referred to as “CITY”) wishes to enhance safety for pedestrians and bicyclists by adding a multi-use path on Dixie Highway (SR 25) and West Boundary Street from the end of the existing path, on the north side of the diverging diamond north to Indiana Avenue. The CITY is now requesting Statements of Qualification (SOQs) to provide design and consulting services for the creation of construction documents needed to construct the multi-use path. The intent is to create a full set of construction drawings, including specifications and obtaining all permits needed so that the project can be bid and a Contractor selected to perform the work. There may be right of way work that could be needed for a couple of parcels along the project, so all SOQs submitted should include a surveying firm that is prequalified with ODOT for Right of Way Plan Development.
09/16/2022 06:00 PM UTC
Pavement Markings 2022
This project will consist of pavement marking in various locations across the City of Perrysburg. Due to fading, the existing pavement markings need new paint to be applied to them. All paint must adhere to the Ohio Manual of Uniform Traffic Control Devices standards. EXPECTED START DATE: September 1, 2022 FINAL COMPLETION DATE: October 31, 2022 ENGINEER'S ESTIMATE: $115,000
07/22/2022 06:00 PM UTC
51 - 60 of 82 Solicitations
1 2 3 4 6 8 9