General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
22-23-1
Royal 18th Dr. Drainage-------Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the drainage as specified located between 8 and 11 Royal 18th Street (R09A003; S19-T8-R14) in Slidell, Louisiana as specified.
06/07/2022 07:00 PM UTC
22-26-1
Lake Superior Dr Drainage.............................The Parish requires a Contractor to install catch basin, seal interior joints of pipes and backfill sinkholes on Lake Superior Drive (R08L047; S31-T8-R15) in Slidell, Louisiana.
06/01/2022 07:00 PM UTC
22-25-1
Southdown Subdivision Repair...................... The Parish requires a Contractor to repair and reseal catch basins, man-hole box, remove and repair concrete panels and repair/reseal cross culvert under the roadway located on 400 Shady View Ln (R01K018; S41-T7-R10); 405 Southdown Lp (R01K019; S41-T7-R10) Madisonville; 656 & 680 Silverthorne Ln (R01K020; S41-T7-R10) in Covington, Louisiana.
06/01/2022 07:00 PM UTC
22-24-1
Autumn Woods Dr Drainage....................The Parish requires a Contractor to remove/replace existing drop inlets, remove and replace concrete driveway and catch basin on Autumn Woods Dr (R04E246; S48-T8-R12) in Lacombe, Louisiana.
06/01/2022 07:00 PM UTC
22-19-1
Biron St. Drainage-----------------------------------------------------------------------Contractor must provide all labor, materials, tools, and equipment to repair the drainage as listed in the specifications at locations along Biron Street (R04E050; S44-T8-R12) in Mandeville, Louisiana.
06/01/2022 07:00 PM UTC
22-20-1
Goldenwood Drainage Repair------------------------------------------------------------The Parish requires a Contractor to remove and replace a catch basin (CB-06), concrete driveway, sidewalk, mountable curb, and road panels, and clean, repair, and reseal interior pipe joints located at 244 Goldenwood Dr (R08M061; S38-T9-R15) Slidell, Louisiana, in accordance with specifications
06/01/2022 07:00 PM UTC
22-21-1
S Caleb Dr Repair--------------------------------------------------------------------------Contractor must provide all labor, materials, tools, and equipment to repair a pipe, reseal a catch basin and remove/replace mountable curb located at 562 & 571 S. Caleb Dr. (R08N100; S37-T9-R15) in Slidell, Louisiana 70461 in accordance with the specifications.
06/01/2022 07:00 PM UTC
22-16-1
Kay Drive Repair ---------------------------------------------------------- Contractor must provide all labor, supplies, equipment, tools, permits and materials to repair the roadway as specified near 60210 Kay Drive (R09C001; S-34-T9-R14) in Lacombe, Louisiana as specified. Contractor shall provide all signage and barricades. The time period to complete the work shall be twenty (20) calendar days from issuance of the NTP by the Parish.
05/24/2022 07:00 PM UTC
22-17-1
Pawns Lane Repair ----- Contractor must provide all labor, materials, tools, and equipment to repair the sidewalk on Pawns Lane (R08I066; S26-T8-R14) located in Slidell, Louisiana as specified. The time period of completion is 30 days from Notice to Proceed issued by the Parish. A Quote Guarantee is not required for this project. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a wellknown technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
05/18/2022 07:00 PM UTC
22-17-2
2022 District Panel Replacements ........................................................................................................................ The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and replacing concrete road panels and/or rollover curbs as specified along the following Parish roads
05/05/2022 07:00 PM UTC
421 - 430 of 979 Solicitations
1 2 39 40 41 43 45 46 47 97 98