General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
12 Solicitations

Closed Solicitations

Number Deadline
20-22-2
2020 District 9 & 11 Road Improvements------------------------- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along Adele Circle (R08N072) Section 39 Township 9S Range 15E Slidell; Essex Dr (R08N032) Section 39 Township 9S Range 15E Slidell; Pinewood Circle (R08A025) Section 11 Township 8S Range 14E Pearl River; St Paul Dr (R08B004) Section 40 Township 8S Range 14E Pearl River; Cornibe Rd (R08H025) Section 13 Township 8S Range 14E Slidell; Royal 18th Dr (R09A003) Section 19 Township 8S Range 14E Slidell; Royal Dr (R09A002) Section 19 Township 8S Range 14E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
10/27/2020 07:00 PM UTC
20-19-2
2020 District 12, 13, 14 Road Improvements ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing, milling and/or overlaying road surfaces as specified along: - Avery Dr (R08Q104) Section 29 Township 9S Range 15E Slidell; - Azalea Ln (R09G052) Section 38 Township 9S Range 14E Slidell; - Belair Dr (R08W002) Section 18 Township 9S Range 14E Slidell; - Churchill Rd (R09G018) Section 38 Township 9S Range 14E Slidell; - City Dr (R09J050) Section 22 Township 9S Range 14E Slidell; - Eden St (R09G017) Section 38 Township 9S Range 14E Slidell; - N 4th Ave (R08J013) Section 23 Township 8S Range 14E Slidell; - N 16th St (R08J016) Section 23 Township 8S Range 14E Slidell; - Plum Dr (R09J049) Section 44 Township 9S Range 14E Slidell; - Reese Ln (R09G022) Section 38 Township 9S Range 14E Slidell; - Slidell Ave (R09I011) Section 27 Township 8S Range 14E Slidell; - Wilbur St (R09B011) Section 28 Township 8S Range 14E Slidell; and - Woodview Dr (R08P025) Section 39 Township 9S Range 15E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
10/07/2020 07:00 PM UTC
20-18-2
US 190 at Brier Lake Dr. Turning Lane, Tammany Trace (Durnin Dr.) ----- The Contractor must provide all adequate and competent labor, equipment, and materials necessary to improve roadway surfaces by milling and overlaying of asphaltic concrete, installation of base course, asphalt paving, and installing roadway striping, as specified along LA HWY 190 at Brier Lake Dr. Turning Lane, Section 33 Township 8S Range 13E and the Tammany Trace (Durnin Dr.), (R11A001) Section 33 Township 8S Range 13E located in Lacombe, Louisiana. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/16/2020 07:00 PM UTC
20-17-2
2020 District 4, 5, 7, Krentel Rd, Krentel Rd Bridge, Stirling Blvd Road Improvements --------- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing, milling and/or overlaying road surfaces as specified along Crapemyrtle Cir (R04A035) Section 21 Township 7S Range 11E Covington ; Crapemyrtle Rd (R04A034) Section 21 Township 7S Range 11E Covington ; Magnolia Ln (R04A036) Section 21 Township 7S Range 11E Covington ; Little Creek Rd (R04F052) Section 29 Township 7S Range 12E Covington ; Wiggins Rd (R04F054) Section 19 Township 7S Range 12E Covington ; Woodlane Dr (R03B003) Section 42 Township 7S Range 11E Covington ; Adele St (R07C055) Section 43 Township 8S Range 13E Lacombe ; Carmel Rd (R04F043) Section 8 Township 7S Range 12E Covington ; Janet St (R07C054) Section 43 Township 8S Range 13E Lacombe ; Lyon Ln (R07H015) Section 32 Township 8S Range 13E Lacombe ; Merino Rd (R07C071) Section 29 Township 8S Range 13E Lacombe ; Shady Pine Rd (R07C017) Section 43 Township 8S Range 13E Lacombe ; Krentel Rd (R07A004) Section 7 Township 8S Range 13E Lacombe ; Krentel Rd Bridge (B07B001) Section 7 Township 8S Range 13E Lacombe ; Stirling Blvd (R01L004) Section 47 Township 7S Range 11E Covington. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
09/10/2020 07:00 PM UTC
20-13-2
Fishing Pier PH II...………………………..Contractor shall furnish all labor, equipment, tools, supplies, and materials necessary for the development of the offshore fishing pier improvements, in accordance with the design specifications and plans, for the St. Tammany Parish fishing pier located at 54001 East Howze Beach Road, Slidell, LA 70461.
09/09/2020 07:00 PM UTC
20-15-2
Skillet & Kettle - Jail Kitchen -- Contractor shall provide all labor, equipment, tools and materials to perform the following work at the St. Tammany Parish Jail located at 1200 Champagne Street, Covington, Louisiana 70434 (S38-T6S-R11E). All prices must include shipping and installation. Any required labor to install equipment must be included in the price of the equipment. Existing equipment will be disconnected and given to the owner.
08/20/2020 07:00 PM UTC
20-10-2
Black River Dr Bridge ----- The Contractor must provide all labor, equipment, tools, testing and materials required necessary for the removal and replacement of bridge structure, installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/28/2020 07:00 PM UTC
20-9-2
2020 District 8 & 14 Panel Replacements ----- The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as required per the construction drawings and specifications. The scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
07/28/2020 07:00 PM UTC
20-11-2
Hollycrest Blvd - The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing, replacing and/or repairing concrete panels as specified along Hollycrest Blvd (R03L114) Section 15 Township 7S Range 11E Covington.
07/22/2020 07:00 PM UTC
20-8-2
Alton Drainage Improvements.....................The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications. The project location is Alton Subdivision, Slidell, LA (S23-T8S-R14E)
06/25/2020 07:00 PM UTC
451 - 460 of 915 Solicitations