St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-4-2
Area 1 Panel & Curb Replacement---------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to remove and replace concrete panels and concrete rollover and barrier curbs in order to improve roadway conditions, as specified, along Palm Ct (R01J091) Madisonville ; Coconut Palm Dr (R01J092) Madisonville ; Del Sol Ct (R01E025) Covington ; Del Sol E (R01E026) Covington ; Del Sol Pass (R01E024) Covington ; Del Sol W (R01E027) Covington ; Covington Meadow Cir (R03L160) Covington, Louisiana.
| 03/03/2026 08:00 PM UTC |
|
26-5-2
Hickory Area Drainage Maintenance------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing drain pipes, catch basins, and improving the turning radius as specified along the following Parish roads:
• Blueberry Lp (R06H009) Pearl River, LA;
• E Ridgewood Dr (R06H007) Pearl River, LA;
• Mockingbird Lp (R06H010) Pearl River, LA;
• Silas Thomas Rd (R06H006) Pearl River, LA; and
• W Ridgewood Dr (R06H008) Pearl River, LA
| 03/04/2026 08:00 PM UTC |
|
26-6-2
2026 District 12, 13, 14 Road Improvements-----------------The Contractor shall provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by milling and/or overlaying road surfaces as specified along various Parish roads.
| 03/10/2026 07:00 PM UTC |
|
26-12-2
2026 District 1, 4 Road Improvements-----------------------------
The Contractor shall provide all adequate and competent labor, equipment, tools,
testing, and materials necessary to improve roadways by milling and overlaying
and patching road surfaces as specified along various Parish roads.
| 03/10/2026 07:00 PM UTC |
|
26-15-2
Emergency Fuel Services
| 03/17/2026 07:00 PM UTC |
|
26-11-2
Tammany Trace Bridge #24--------------------------------------------------The work to be included under this contract shall consist of furnishing all labor, materials, equipment, tools, supervision, and incidentals necessary for the removal and replacement of the existing bridge structure, earthwork and path base, relocation of existing drainage ditches, installation of concrete and asphalt paving, fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
| 03/24/2026 07:00 PM UTC |
|
26-14-2
2026 District Panel Replacements-----------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and/or replacing concrete panels, concrete barriers, rollover curbs, curbs, and gutters as specified along the following Parish roads:
- Kepler Lake Ct (R08L055) Slidell, LA;
-Lake Michigan Dr (R08L050) Slidell, LA;
- Lake Village Blvd (R08L026) Slidell, LA;
- W Forest Dr (R08I034) Slidell, LA;
- Willow Cir (R08I045) Slidell, LA;
- Greenleaves Blvd (R04O060) Mandeville, LA;
- Alisa Dr (R09A033) Slidell, LA;
- Clearpoint Dr (R09A024) Slidell, LA;
- Madeline Ln (R09A063) Slidell, LA;
- MCH Rd (R04F064) Mandeville, LA;
- Willow Wood Dr (R08M060) Slidell, LA;
- Silverwood Dr (R08M062) Slidell, LA;
- Goldenwood Dr (R08M061) Slidell, LA;
- Larchwood Dr (R08M073) Slidell, LA;
- Elizabeth Dr (R09G044) Slidell, LA;
- Queen Anne Dr (R09G038) Slidell, LA;
- Westminster Dr (R09G033) Slidell, LA;
- Trafalgar St (R08V029) Slidell, LA;
- Tumblebrook St (R08V025) Slidell, LA;
- Foxcroft St (R08V019) Slidell, LA;
- Almond Creek Rd (R08V021) Slidell, LA; and
- Brookter St (R08V108) Slidell, LA.
| 03/24/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
21-13-2
Submersible Wastewater Pumps .........The Parish, as a function of Tammany Utilities, owns and operates approximately fifty (50) wastewater treatment plants, forty (40) water wells, and over two-hundred (200) sewage lift stations, water distribution lines and sewage collection lines.
| 05/04/2021 07:00 PM UTC |
|
21-12-2
Positive Displacement Blowers...............Background Information: The Parish, as a function of Tammany Utilities, owns and operates approximately fifty (50) wastewater treatment plants, forty (40) water wells, over two-hundred (200) sewage lift stations and miles of water distribution and sewage collection lines.
| 05/04/2021 07:00 PM UTC |
|
21-7-2
Fairgrounds Phase 3 - Horse Stalls..........St. Tammany Parish Government is in need of approximately 50 -100 10’x10’ portable horse stalls delivered to 1515 North Florida Street Covington, LA 70433.
| 04/22/2021 07:00 PM UTC |
|
21-9-2
2021 District 2, 3 Road Improvements-------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along A St (R03L036) Section 11 Township 7S Range 11E Covington ; Coin Rd North (R03F105) Section 4 Township 6S Range 11E Covington ; F St (R03L041) Section 11 Township 7S Range 11E Covington ; Hosmer Mill Rd (R03F022) Section 15 Township 6S Range 11E Covington ; Bruhl Rd (R02N028) Section 30 Township 5S Range 10E Folsom ; E Stadium Dr (R03D015) Section 30 Township 6S Range 11E Covington ; Lion Dr (R03D014) Section 30 Township 6S Range 11E Covington ; Martin Rd (R02L008) Section 23 Township 5S Range 10E Folsom ; Penn Mill Rd (R03D007) Section 30 Township 6S Range 11E Covington.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 04/14/2021 07:00 PM UTC |
|
12-8-2
Fairgrounds Phase 3 - Bleachers........Vendor shall provide all supervision, labor, equipment, materials, supplies and permits required for installation of bleachers area at the St. Tammany Parish Fairgrounds, 1515 N. Florida Street, Covington, LA 70433 (S37-T06S-R11E) in accordance with the plans and specifications.
| 04/01/2021 07:00 PM UTC |
|
21-6-2
Forest Park Drainage Improvements----------------------The Contractor must provide all labor, equipment, and tools necessary for the installation of drainage structures, concrete and asphalt paving, and earthwork as required per the construction drawings and specifications for the Forest Park Drainage Improvements Project, located in Mandeville, LA., 70471.
The Scope of Work shall be completed in accordance with the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 03/22/2021 07:00 PM UTC |
|
21-5-2
Parishwide Sinkhole Repairs----------------------------------------Contractor must provide all, equipment, tools, testing, and materials necessary to repair drainage structure(s) as specified along:
Cross Gates Blvd(R08L001) PW20000158 Section 38 Township 9 Range 15; Timbers Dr(R08I043) PW20000163 Section 26 Township 8 Range 14; Pinehurst Ct(R09B024) PW20000161 Section 29 Township 8 Range 14; Frost Ln(R04D108) PW20000159 Section 29 Township 8 Range 14; Commercial Dr(R08C010) PW20000157 Section 42 Township 8 Range14; Montgomery Dr (R08V044) PW20000160 Section 24 Township 9 Range 14
| 03/10/2021 08:00 PM UTC |
|
21-3-2
Lake Front Pump Station Phase 3......................................Contractor to furnish all labor, materials, supplies, tool, and equipment for the Lakefront Drainage Pump Station Repair Phase 3 project located in Slidell, Louisiana (S04-T10S-R14E). Work includes elevation of the existing pump motors, associated mechanical work, new electrical and controls installed on existing elevated platform, protective coatings and other work as specified and described in the contract documents.
| 03/04/2021 08:00 PM UTC |
|
21-4-2
Soult Street Road Improvements.................................Contractor must provide all labor, supplies, equipment, tools, permits and materials for Soult St Road Improvements. The work includes clearing, grubbing, earthwork, grading, drainage, base course, asphalt concrete pavement, concrete pavement, mill and overlay, permanent pavement striping, signing on Soult Street (from US Hwy 190 to LA 1088) Section - 6 Township – 8 Range – 12E.
| 03/03/2021 08:00 PM UTC |
|
20-36-2
Robbert Park Drainage Improvements------------------------
The Contractor must provide all labor, equipment, tools, and materials necessary for the removal and installation of drainage structures and associated asphalt patching and driveway paving per specifications. The locations for Robbert Park Drainage Improvements are Park Dr. (R08M010), Kisatchie Dr (R08M016), and Choctaw Dr. (R08M013) in Slidell, Louisiana,( Section 48, Township 8S, Range 14E).
| 02/10/2021 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.