25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
20-34-2
Railroad Ave;Forest Brook Blvd...................The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along Railroad Ave (R01C005) Section 27 Township 6S Range 10E Covington; Forest Brook Blvd (R04E158) Section 5 Township 8S Range 12E Covington, LA.
01/07/2021 08:00 PM UTC
20-35-2
Road Materials - Partial............Price per ton, scale ticket required, FOB Parish Trucks, pit site, for surface course aggregates, sand clay gravel, sands, pea gravel, road gravel clay and fill dirt (road gravel: deleterious material not allowed, i.e. sticks, clay balls, etc.) (sand: A-4 Select) as may be required from time to time in the maintenance and construction of Parish roads within the Parish of St. Tammany.
01/06/2021 08:00 PM UTC
20-25-2
Skillet & Kettle - Jail Kitchen..............................Contractor shall provide all labor, equipment, tools and materials to perform the following work at the St. Tammany Parish Jail located at 1200 Champagne Street, Covington, Louisiana 70434 (S38-T6S-R11E). All prices must include shipping and installation. Any required labor to install equipment must be included in the price of the equipment. Existing equipment will be disconnected and given to the owner. Both units need to be bolted & fastened to the concrete floor. There are no drawing for this RFP, no special permits required and no special barricades or temporary protection required.
12/18/2020 08:00 PM UTC
20-33-2
Concrete Culverts.........................Price per foot for reinforced concrete culverts delivered F.O.B. job site, St. Tammany Parish, in diameters listed below. Concrete culverts shall be made according to the standards of ASTM C-76 (Bell & Spicket for round and ASTM C-506 for arch with rubber gasket or FWG joints. Pipes need to be on DOTD Materials List.
12/18/2020 08:00 PM UTC
20-30-2
Road Signs
12/09/2020 08:00 PM UTC
20-31-2
Animal Services Medical Supplies
12/09/2020 08:00 PM UTC
20-32-2
Cold Mix--------------------This specification covers the properties of a rapid-curing asphaltic concrete mixture for the repair of pavement joints and patching small pavement areas.
12/08/2020 08:00 PM UTC
20-28-2
Justice Center Replace Carpet & Repaint Interior...........The work specified in the project shall require the contractor to furnish all work, labor, tools, equipment, services, materials and permits necessary for the replacement of carpet and repainting of interior in sections of the St. Tammany Parish Justice Center, located at 701 N. Columbia Street, Covington, LA 70433 (S41-T06S-R11E), as specified.
12/01/2020 08:00 PM UTC
20-29-2
2020 Parishwide Maintenance Sinkhole Repair----------------- Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to repair drainage structures along the following St. Tammany Parish roads: • Portsmouth Dr. (R09G039) Section 38 Township 9 Range 14 • Hunters Point Dr. (R09A036) Section 19 Township 8 Range 14 • Chelsea Ct. (R09A047) Section 19 Township 8 Range 14 • Holmes Dr. (R09G040) Section 38 Township 9 Range 14 • Stanton Ln. (R09A030) Section 19 Township 8 Range 14 • Wesley Ln. (R09A055) Section 19 Township 8 Range 14 • Brook Ln. (R09A022) Section 19 Township 8 Range 14 • Somerset Rd. (R08V022) Section 13 Township 9 Range 14 • Primrose Ln. (R01C020) Section 46 Township 7 Range 11 • Tallow Creek Blvd. (R01C027) Section 1 Township 7 Range 10 • JJ Lane (R01C028) Section 7 Township 1 Range 10 • Place St Jean (R01E019) Section 47 Township 7 Range 11 • Park Place Dr. (R03L171) Section 15 Township 7 Range 11 • Misty Creek Dr. (R04E248) Section 47 Township 8 Range 12 • Pearl St. (R08G004) Section 31 Township 8 Range 15 • Ellwood Circle (R08I062) Section 25 Township 8 Range 14 • Defiance Dr. (R08I054) Section 25 Township 8 Range 14 • Lenwood Dr. (R08I132) Section 25 Township 8 Range 14 • Marywood Circle (R08I055) Section 25 Township 8 Range 14 • Dunkirk St. (R08V040) Section 24 Township 9 Range 14 • Moonraker Dr. (R09J010) Section 44 Township 9 Range 14 • Lake Superior Dr. (R08L047) Section 31 Township 8 Range 15 The Scope of work shall include all items as listed within the specifications. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
11/24/2020 08:00 PM UTC
20-24-2
Dove Park Subdivision Drainage ………………………...The work specified in this project will require the contractor to provide all adequate and competent labor, equipment, and materials necessary to complete drainage improvements, as specified along Swallow St. (R04D014), Sparrow St. (R04D015), Partridge St. (R04D016), and Egret St. (R04D017) Section 26 Township 7S Range 11E.
11/10/2020 08:00 PM UTC