General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-32-2
Utility Point Of Repair------------------------------- The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
06/23/2026 07:00 PM UTC
26-29-2
Charlie St. Extension---------------------------------This project involves the full roadway construction of the extension of Charlie St to Three Rivers Rd. The project will include subsurface drainage & installation of open ditches, earthwork & base course, new asphalt concrete roadway paving, and signage & striping.
06/24/2026 07:00 PM UTC
26-33-2
Tammany Hills Drainage-----------------------------------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve area drainage by removing and replacing drainage culverts and installing sub-surface pipe, as well as catch basins, as specified along D St (R03L040), Covington, LA; F St (R03L041), Covington, LA; Webster St (R03L067), Covington, LA.
06/24/2026 07:00 PM UTC
26-34-2
Ben Thomas Rd Signal----------------------------Installation of span wire traffic signals, including new electrical service, concrete foundations, steel poles, and necessary equipment.
07/15/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
304-00-15-29-2
Holly Dr Drainage Improvements
08/11/2015 07:00 PM UTC
440-13-15-25-2
Abita Airport Pavement Rehabilitation Runway
08/03/2015 07:00 PM UTC
123456
TEST
07/28/2015 07:23 PM UTC
312-00-15-28-2
Oak Harbor Blvd Mill and Overlay
07/28/2015 07:00 PM UTC
305-00-15-26-2
Grand Terre Drainage Improvements
07/21/2015 07:00 PM UTC
016-06-15-27-2
One (1) EA. Walking Excavator
07/14/2015 07:00 PM UTC
307-00-15-24-2
2015 District 7 Road Improvements
07/07/2015 07:00 PM UTC
309-00-15-09-2
2015 District 9 Road Improvements
07/01/2015 07:00 PM UTC
301-00-15-19-2
Oak Park Dr Drainage Improvements
06/23/2015 07:00 PM UTC
525-00-15-22-2
LED Lighting Upgrade Hardware
06/22/2015 07:00 PM UTC
821 - 830 of 978 Solicitations
1 2 79 80 81 83 85 86 87 97 98