St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-34-1
Lake D' Este Dr Drainage-----------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainages and road repairs by removing existing failed insert, install new pipe, repair catch basins, install CIPP liner and removing and replacing concrete
panels as specified along Lake D’ Este Dr (R08L021) located in Slidell, Louisiana.
| 11/10/2026 08:00 PM UTC |
|
26-33-1
Wildwood Farms Subdivision Drainage ----The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools,
and materials necessary to improve drainage by removing and replacing driveway pipes,
catch basins, and drain pipe as specified along Max Mercer Rd (R06I026); Cecil Fleming Rd
(R06I009) located in Pearl River, Louisiana.
| 11/12/2026 08:00 PM UTC |
|
26-32-1
Peg Keller Rd Drainage---------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing driveway pipes as specified along Peg Keller Rd (R060031) located in Abita Springs; Louisiana.
| 11/19/2026 08:00 PM UTC |
|
26-45-2
Cross Gates Subdivision-----------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve and repair roadways by milling and overlaying various sections, improve turning radii and striping as specified along the following Parish roads:
Avon Ct (R08N011) Slidell, LA;
Cross Gates Blvd (R08L001; R08M059; R08N001) Slidell, LA;
Drew Ct (R08L074) Slidell, LA;
N Buckingham Dr (R08N009) Slidell, LA;
Trenton Dr (R08N023) Slidell, LA;
Victoria Dr (R08N007) Slidell, LA;
Waverly Dr (R08L068) Slidell, LA; and
Windsor Dr (R08L004) Slidell, LA
| 12/03/2026 08:00 PM UTC |
|
26-46-2
Annual Parishwide Striping---------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to provide and install thermoplastic and traffic striping, legends, symbols, and raised markings located within St. Tammany Parish.
| 12/03/2026 08:00 PM UTC |
|
26-36-1
Mulberry Ave Drainage--------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and
replacing existing structure(s), subsurface drainage pipe, catch basin, concrete driveways, and sod as specified along Mulberry Ave (R04C037) located in Mandeville, LA.
| 12/03/2026 08:00 PM UTC |
|
26-37-1
Utilities Grass Cutting Services--------------------The purpose of this quote request is to obtain proposals from qualified Providers who are interested in providing grass cutting services for the St. Tammany Parish Department of Utilities (DU).
| 12/08/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1
------
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016).
The time period for completion of the project is 90 calendar days + calculated rain days.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/27/2016 07:00 PM UTC |
|
301-00-16-51-2
2016 District 10 Road Improvements.......This is a 2016 Capital Road Improvement Project for District 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with milling and overlaying, overlaying, and adding pavement striping along Coffee Street (R04D047) Section 39 Township 8 South Range 11 East; Dupard Street (R04D168) Section 39 Township 8 South Range 11 East; and Lafitte Street (R04D050) Section 39 Township 8 South Range 11 East.
| 09/23/2016 07:00 PM UTC |
|
324-00-16-52-2
Waste Water Treatment and Control - Public Works Wash Racks
| 09/20/2016 07:00 PM UTC |
|
313-00-16-50-2
2016 District 13 Road Improvements.........This is a 2016 Capital Road Improvement Project for District 13. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with asphalt overlays on Faciane Lane (R09H022) Section 38 Township 9S Range 14E ; Coin Du Lestin Dr. (R09H025) Section 38 Township 9S Range 14E.
| 09/13/2016 07:00 PM UTC |
|
403-15-16-45-2
STAC Phase 3 Drainage Detention Pond/ STEM Bldg.
The Parish requires a contractor to clear, excavate, and grade to construct a dry dentention pond. Work will also include construction of a maintainance road around the perimeter of the pond and construction of a temporary crossing at the linear detention pond. Hauling, placing, grading and compacting fill material for the future STEM building.
| 09/07/2016 07:00 PM UTC |
|
337-00-16-53-2
Justice Center Lighting Upgrade to LED-------------------------- The Parish extends this MATERIAL ONLY bid request to procure energy efficient LED lightbulbs and/or upgrade kits (products) for the Justice Center Lighting Upgrade to LED project.
Pricing shall include all shipping and delivery costs and must be valid through the term of the contract, which is valid until December 31, 2016. Defective products and products damaged during shipping and/or delivery shall be replaced at no additional cost to the Parish.
Products shall be delivered within forty-five (45) calendar days from the date a Purchase Order is issued by the Parish. A liquidated damages fee of five hundred ($500) dollars per day shall be in effect for products not delivered within the specified time frame. All product deliveries shall be made to the Facilities Management Office at the Justice Center located at 701 N. Columbia Street, Covington, La 70433.
The specifications in Attachment “A” are intended to be the minimum requirements of the products to be provided in the bid request. The specifications shall provide an equal to or greater than value.
Request for approval of an equivalent product must be submitted, with the alternative product specifications, catalog cuts, and descriptive literature, per the deadline date and time set forth in Section 1.3 Schedule of Events of this Bid Request. The Parish shall review the request, determine if the product qualifies as an “approved equivalent” and issue an addendum with the determination. It is the sole discretion of the Parish to make the determination if a product will be acceptable as an equivalent. Please send “approved equivalent” requests via email to purchasing@stpgov.org no later than 2:00 PM on August 23, 2016.
The name of any manufacturer mentioned in the specifications is for the purpose of establishing a minimum acceptable standard of quality desired by the Parish. On all items bid, the Respondent shall indicate clearly the product being bid and, where applicable, shall supply catalog cuts and descriptive literature with the original copy of the bid. All products bid must have prior approval as “approved equivalents”.
Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded.
A bid guarantee is not required for this project.
The Base Bid shall be the sum total of the unit prices for one (1) each of the specified products in Attachment “A,” which shall include all applicable costs.
| 09/01/2016 07:00 PM UTC |
|
300-00-16-49-2
STAC Centerpoint Blvd Ph 2 ------ Construction of concrete roadway, sidewalks, and sidewalks with concrete pavers; Pavement Striping; Subsurface Drainage; Water house connections to existing 16” water main; Clearing and Grubbing of future St. Tammany Parish Emergency Operations Center site; and final grading in accordance with plan details.
| 08/30/2016 07:00 PM UTC |
|
334-00-16-25-2
Roof Repair/ Jail ------ St.Tammany Parish Jail Building A (Base Bid) roof repair and re-roofing and Building C (Alternate No. 1) roof repair and restoration. The front portion of the roof on Building A, approximately 18,858 sq. ft., shall be removed and replaced. The existing parapet walls shall be encased in metal flashing to cover up the existing exposed CMU wall system. The roof of Building C, approximately 30,000 sq.ft, shall be repaired and restored.
| 08/11/2016 07:00 PM UTC |
|
305-00-16-38-2
Emerald Forest Blvd. Ext ------ Site security and control of access, erosion control, removing topsoil and organic material for the road bed, borrowing material by expanding the Crestwood Pond to be used as road base and shoulder area, testing subbase and base martial for chemical stabilization, stabilizing the subbase material with lime (12” thick by 9% by volume), stabilizing the base with soil cement (12” thick by 10% by volume), paving the new road with 4” thick asphalt binder and 2” wearing by 24 feet wide, installing 6’ wide aggregate shoulders, install drainage ditches, culverts headwalls, rip rap, thermoplastic pavement markings, signs, and hydro-seeding.
| 08/10/2016 07:00 PM UTC |
|
440-13-16-47-2
St. Tammany Regional Airport Runway Rehabilitation
This project consists of the pavement rehabilitation for Runway 18/36 and the taxiway. This project will include crack sealing, emulsified asphalt seal coating, pavement markings, and shoulder redressing.
| 08/09/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.