General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/15/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/21/2026 08:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
314-00-15-04-2
2015 District 14 Road Improvements
04/01/2015 07:00 PM UTC
303-00-15-06-2
2015 District 3 Road Improvements
03/31/2015 07:00 PM UTC
416-14-15-01-2
Lapin Street Drainage Improvements
03/10/2015 07:00 PM UTC
403-13-14-57-2
OCD/DRU STP Fairgrounds Revitalization
02/25/2015 08:00 PM UTC
312-00-14-58-2
Oak Harbor Blvd Panel Replacements
01/13/2015 08:00 PM UTC
337-00-14-52-2
Public Defenders Renovation
12/16/2014 08:00 PM UTC
440-12-14-49-2
10 Unit T-Hanger (Obstruction Mitigation)
12/16/2014 08:00 PM UTC
309-00-14-54-2
Herwig Bluff & Steele Rd Improvements
12/15/2014 08:00 PM UTC
502-03-14-56-2
2015 Annual Bid
12/09/2014 08:00 PM UTC
300-00-14-06-2
St. Tammany Advanced Campus Roadways and Drainage Phase I
12/05/2014 08:00 PM UTC
801 - 810 of 933 Solicitations