Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-103194.1R
Water Treatment Facility - Forest District Office Forest District 9, Moshannon State Forest Pine Township, Clearfield County, Pennsylvania This project includes the construction of a water treatment system and connection to a new groundwater source, to provide drinking water to the Moshannon State Forest District Office. This will require the installation of a submersible well pump, drop piping, pitless adaptor, sanitary seal well cap, and necessary appurtenances required to convey groundwater from the existing well source. Raw water distribution piping will be installed to connect the groundwater source to the District Office. A water treatment system will be constructed to provide disinfection, oxidation, greensand plus filtration, water storage, and pressurization. A backwash disposal system will be constructed to properly remove all regenerated water from the treatment process. Selective demolition and abandonment of existing water system piping is anticipated. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
07/17/2025 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
FDC-210-07223.1
General Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships, Butler County, Pennsylvania Without intending to limit and/or restrict the volume of work required by these specifications or as shown on the contract drawings, work included under this contract includes the rehabilitation of five (5) sewage pumping stations. Four (4) of the existing stations, 8, 14, 15 and 16, are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
05/18/2023 06:00 PM UTC
FDC-210-07223.4
Electrical Construction, Rehabilitation Sewage System North Shore Moraine State Park Muddy Creek and Worth Townships Work included under this contract consists of but is not necessarily limited to, the furnishing of all labor, superintendence, materials and tools and equipment, miscellaneous items and performing all electrical work necessary to complete the rehabilitation of five (5) sewage pumping stations. Four of the existing stations 8, 14, 15, and 16 are being converted from dry pit/wet pit type stations to submersible stations. Station 10 is being upgraded and will remain a dry pit/wet pit type station. Pump station 9 is being abandoned. The project also includes installing new force mains for several of the stations by horizontal directional drilling and trenching methods, rehabilitation and lining of manholes, using CIPP lining process for approximately 1,400 lineal feet of sanitary sewer. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
05/18/2023 06:00 PM UTC
FDC-429-102326.1
Lakeside Lodge Septic Lackawanna State Park Benton Township, Lackawanna County Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items, and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of the Department. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
05/11/2023 06:00 PM UTC
FDC-018-101524.1
General Construction, Weiser State Forest, RMD Drive and - MB Lot Paving, Forest District 18, Conyngham Township, Columbia County, Pennsylvania Work included under this contract consists of installation of new paved road on portion of the access roadway to maintenance building and new paved parking area, installation of two (2) culvert pipes, inlets and outlets, construction of ditches/swales, striping of the parking area, concrete slab adjoining the front apron and existing concrete slab of the maintenance building garage as indicated on the Contract Drawings. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
05/11/2023 06:00 PM UTC
FDC-014-10156.1
Plug and Properly Abandon Orphaned Oil & Gas Wells Northeast Jamison Tract (DGS-196-13, Phase 2) Forest District 14, Cornplanter State Forest Harmony Township, Forest County, Pennsylvania The scope of work for this project is the cleaning out and plugging of 12 oil and gas wells located within the Cornplanter State Forest boundaries, installation of E&S control measures and site restoration as further described in the technical specifications. The list of well identification numbers is as follows: 053-00785, 053-00893, 053-00907, 053-00908, 053-00910, 053-22001, 053-22002, 053-22003, 053-22004, 053-22043, 053-22045, and 053-22046 DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
04/27/2023 06:00 PM UTC
FDC-005-101788.1
Demolish Cabin At Jack's Mountain Fire Tower Forest District #5, Rothrock State Forest Cass/Cromwell Township Huntingdon County, Pennsylvania Work performed under this contract shall include, but it not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $100,000
04/27/2023 06:00 PM UTC
FDC-319-101512.1
Repairs at Long House Susquehannock State Park Drumore Township, Lancaster County, Pennsylvania Work included under this contract consists of stabilization and protection of the existing James B. Long Home, a c. 1850 two-story stone house at Susquehannock State Park. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
04/27/2023 06:00 PM UTC
FDC-414-102645.4R
Electrical Construction, Construct Full-Service Campsites Phase II Promised Land State Park Greene Township, Pike County, Pennsylvania Work included under this contract consists of design and construction of improvement to existing campsites listed within Northwoods Loop “B” of the park campground, including installation of electric. The design documents shall conform with the DCNR campsite standards as conditions allow. Work to be performed consists of all labor, material, equipment, layout, disposal, and other incidental costs. DGS Small Business Certification Required Engineer's Estimate: $100,000 - 400,000
04/27/2023 06:00 AM UTC
FDC-207-100689.2R
Mechanical Construction, Rehabilitate Organized Group Camps Laurel Hill State Park Jefferson & Middlecreek Townships, Somerset County, Pennsylvania Work included under this contract consists of selective demolition, rehab and repairs to various structures within Group Camp 8 and Group Camp 1. Work includes but is not limited to mechanical exhaust system demolition and installation; new commercial kitchen exhaust systems; and miscellaneous mechanical ventilation work. DGS Small Business Certification Required Engineer's Estimate:$50,000 - $100,000
04/20/2023 06:00 PM UTC
FDC-411-102176.4R
Electrical Construction, McConnell Hall Rehabilitation State Park/Forest: Nolde Forest Environmental Education Center Camru Township, Berks County, Pennsylvania Work included under this contract consists of demolition of some existing interior light fixtures, replacing exterior light fixtures and adding new some new, replacing some electrical wiring and running new circuits, replacing lighting controls, replacing emergency lighting, replacing hand dryers, updating the existing electrical panel, replacing some light bulbs, and replacing a couple of receptacles DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
04/20/2023 06:00 PM UTC