General Info

Business Logo

Montgomery County Engineer

451 West Third Street 8th Floor, Dayton, OH 45422
(937) 225-5402

A list of upcoming solicitations is available on the Montgomery County Engineer's website at https://engineer.mcohio.org/projects/bid-letting/.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2022 Pavement Marking Program, Job No 2022-40
2022 Pavement Marking Program, Job No 2022-40 for Various County and Township Roads.
05/18/2022 05:30 PM UTC
2022 Crack Seal Program, Job No. 2022-36
Project consists of crack sealing 385,204 SY of various roadways throughout Montgomery County.
05/04/2022 05:30 PM UTC
2022 ADA Ramp Improvement Program, Job No. 2022-01
This project consists of replacing and installing ADA ramps at various intersections county wide, as well as minor traffic control and traffic signal modifications.
04/13/2022 05:30 PM UTC
Little York Road Bridge Replacement Project, MOT-CR228-3.00, Job No. 2020-05
This project consists of the replacement of an existing structure with a 15'-0" x 4'-0" precast reinforced concrete three sided flat topped culvert. The work length is approximately 165 feet.
04/06/2022 05:30 PM UTC
2022 Crack Seal Program, Job No. 2022-36
Project consists of crack sealing 385,204 SY of various roadways throughout Montgomery County.
03/30/2022 05:45 PM UTC
MOT-Dixie-16.87 Resurfacing Project
The project consists of milling and resurfacing 2.08 miles of North Dixie Drive in Harrison Township to a depth of 1-1/2", and replace and install curb ramps.
03/02/2022 06:30 PM UTC
MOT-MAD River/Alex Bell Improvement, Washington Township, PID 108791, Job #2017-12
Improvement of the intersection of Mad River Road (CR79) and Alex-Bell road (CR 78) by constructing a roundabout with single lane approaches and departures, curb and gutter, roadway drainage, limited lighting, and utility relocations.
02/23/2022 06:30 PM UTC
Oxford Road Bridge MOT-CR60-4.75 Reconstruction Project, Job #2019-13
This project consists of the replacement of the superstructure with 27" deep prestressed concrete box beams. Roadway approach work and guardrail installation is required. The work length is approximately 420 feet.
02/23/2022 06:30 PM UTC
Air Hill Road Bridge MOT-CR26-1.89 Reconstruction Project, Job # 2020-10
Project includes: Replacement of the Superstructure with 21" deep Prestressed Concrete Box Beams. Minimal roadway approach work, and new MGS guardrail installation required. The work length is approximately 260 feet.
01/26/2022 06:30 PM UTC
2022 Asphalt Concrete Resurfacing Program, Job #2022-06
This project consists of milling, resurfacing, restriping 18.7 miles of roadways.
01/26/2022 06:30 PM UTC
31 - 40 of 101 Solicitations
1 2 4 6 7 8 9 10 11