General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150135 - N. 95th St. - W. Keefe Ave. to W. Nash St. ST211150135 - W. Nash St. - N. 95th St. to N. 96th St. ST211150132 - N. 81st St. - W. Courtland Ave./W. Beckett Ave. to W. Hampton Ave.
04/21/2017 03:30 PM UTC
OFFICIAL NOTICE 24-1-2017
PROJECT NO. 1: COMBINED SEWER SLIP LINING AND MANHOLE REPAIR AND LINING Located at: N. 26th St. – W. McKinley Ave. to 50’ N. of W. Cherry St.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 24-2-2017
PROJECT NO. 2: COMBINED SEWER MAIN RELAY AND SANITARY, COMBINED, AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING Located at: S. 24th St. - W. Tripoli Ave. to W. Howard Ave. S. Layton Blvd./S. 27th St. - W. Grant St. to 206'+/- North of W. Harrison Ave. S. 53rd St. - W. Ohio Ave. to W. Nebraska Ave. S. 82nd St. - W. Holt Ave. to W. Morgan Ave. S. Layton Blvd. - W. Pierce St. to W. National Ave. S. Layton Blvd. - 200' N. of W. Evergreen Ln. to W. Evergreen Ln. S. Vermont Ave. - E. Oklahoma Ave. to E. Rhode Island Ave. S. Wentworth Ave. - E. Texas Ave. to E. Oklahoma Ave.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 43-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS ( 6”, 7”, & 8”) CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: ST211150162 - S. 85th St. - W. Morgan Ave. to W. Holt Ave. ST211150110 - S. 82nd St. - W. Morgan Ave. to W. Holt Ave.
04/18/2017 03:30 PM UTC
OFFICIAL NOTICE 41-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211070101 - N. 63rd St. - W. Nash St. to a pt. 450' n/o W. Nash St. ST211070102 - N. 64th St. - W. Nash St. to a pt. n/o W. Nash St. ST211080104 - W. Nash St. - N. 62nd St. to a pt. 150' w/o of N. 64th St.
04/17/2017 03:30 PM UTC
OFFICIAL NOTICE 39-1-2017
This project involves the Traffic Deck Recoating and Repairs of Parking Levels 4-8 at the 2nd & Plankinton Parking Structure located at 724 North 2nd Street Milwaukee, WI 53203.
04/13/2017 03:30 PM UTC
OFFICIAL NOTICE 45-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
04/12/2017 03:30 PM UTC
OFFICIAL NOTICE 50-1-2017
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL CONSISTING OF A MIXTURE OF EMULSIFIED ASPHALT, MINERAL AGGREATE AND WATER, PROPERLY PROPORTIONED, MIXED AND SPREAD EVENLY ON THE SURFACE AS SPECIFIED AND DIRECTED, ETC.; (ST211160119) - Various street locations within the City of Milwaukee
04/12/2017 03:30 PM UTC
OFFICIAL NOTICE 23-1-2017
SANITARY MANHOLE REHABILITATION in: Various Locations
04/11/2017 03:30 PM UTC
OFFICIAL NOTICE 23-2-2017
PROJECT NO. 2: VARIOUS LOCATIONS IN SYSTEM 3016 (SEWER EXAM CONTRACT) Various Locations in System 3016 Plan File(s): 246-78, 246-79, 246-80, 246-81, 246-82, 246-83, 246-84, 246-85, 246-86, 246-87, 246-88, 246-89, 246-90, 246-91, 246-92, 246-93 and 246-94 Dated: March 22, 2017 Project ID: SM495160069 **Attendance at a Pre-Bid meeting on Friday, April 7th, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
04/11/2017 03:30 PM UTC
1011 - 1020 of 1553 Solicitations
1 2 98 99 100 102 104 105 106 155 156