General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 96-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
09/17/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 7-4-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Alley East of N. Water St. - E. Chicago St. to 220' +/- North of E. Chicago St., E. Michigan St. - N. Jackson St. to N. Van Buren St., N. Van Buren St. - E. Wisconsin Ave. to Pt. South of E. Michigan St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 6-1-2017
SANITARY BUILDING SEWER (LATERAL) LINING AND REPAIR IN: AREA BOUNDED BY WEST LAYTON AVENUE TO WEST EDGERTON AVENUE FROM SOUTH 20TH STREET TO SOUTH 27TH STREET **Attendance at a Pre-Bid meeting on Monday, February 20, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. The Contractor must submit all required pre-qualification product, manufacturer, and installer documents to the City of Milwaukee at the following address: 841 North Broadway, Milwaukee WI 53202, ATTN: Mr. Zafar Yousuf, by no later than Monday February 20, 2017.
02/24/2017 04:30 PM UTC
OFFICIAL NOTICE 1-1-2017
Install skid-resistant, solid surface plating on the North Emmber Lane and North Plankinton Avenue open grate lift bridges over the Menomonee River.
02/23/2017 04:30 PM UTC
OFFICIAL NOTICE 21-1-2017
WATER MAIN RELAYS in the following location: Water Main Relays – S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days)
02/22/2017 04:30 PM UTC
OFFICIAL NOTICE 2-1-2017
This project involves the Rehabilitation of the South 1st Street Bascule Bridge over the Kinnickinnic River, P-40-830, including but not limited to; demolition of specified bridge and related components, structural steel, poured-in-place concrete, concrete repairs, reinforcing steel, painting, mechanical and electrical equipment upgrades, bridge house repairs, and incidental work.
02/21/2017 04:30 PM UTC
OFFICIAL NOTICE 30-1-2017
WATER MAIN RELAYS, located at the following locations: W. Thurston Av. (WT410160900), N. Teutonia Av. to N. 34th St. (26 working days); N. 34th St. (WT410160901), W. Thurston Av. to 200’ S/O W. Oriole Dr. (16 working days); N. 62nd St. (WT410160902), W. Fiebrantz Av. to W. Congress St. (55 working days); N. 66th St. (WT410160903), W. Fiebrantz Av. to W. Congress St. (40 working days); N. 64th St. (WT410160904), W. Capitol Dr. to W. Hope Av. (40 working days) (Note: Contractor to furnish and install approximately 7,252 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/20/2017 04:30 PM UTC
OFFICIAL NOTICE 22-1-2017
Water Main Relays - Located at: N. 64th St. (WT410140001), W. Nash St. to 420’ N/O W. Nash St. (15 working days); W. Rohr Ave. (WT410170002), N. 48th St. to N. 49th St. (12 working days); N. 76th St. (WT410140009), W. Grantosa Dr. to W. Florist Ave. (10 working days); N. 91st St. (WT410170616), W. Keefe Ave. to W. Metcalf Pl. (12 working days); W. Concordia Ave. (WT410170659), N. 98th St. to N. 99th St. (14 working days); N. 98th St. (WT410170660), W. Concordia Ave. to W. Townsend St. (21 working days); W. Park Hill Ave. (WT410170663), W. Mt. Vernon Ave. to N. 93rd St. (14 working days); (Note: Contractor to furnish and install approx. 2951 lin. ft. of 12”, 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/16/2017 04:30 PM UTC
OFFICIAL NOTICE 10-1-2017
2017 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
02/10/2017 04:30 PM UTC
OFFICIAL NOTICE 5-1-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: S. 18th St. – W. Scott St. to W. Greenfield Ave. S. 25th St. - W. Greenfield Ave. to W. Orchard St. S. 29th St. - W. Greenfield Ave. to W. Orchard St. S. 30th St. - W. Greenfield Ave. to W. Orchard St. S. 31st St. – W. Madison St. to W. Greenfield Ave. S. 32nd St. - W. Greenfield Ave. to W. Orchard St. W. Greenfield Ave. – S. 17th St. to S. 26th St. W. Greenfield Ave. – S. 33rd St. to S. 34th St. W. Greenfield Ave. – S. Layton Blvd. to S. 28th St.
01/26/2017 04:30 PM UTC
OFFICIAL NOTICE 9-1-2017
2017 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing
01/25/2017 04:30 PM UTC
1001 - 1010 of 1500 Solicitations
1 2 97 98 99 101 103 104 105 149 150