General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 43-1-2024
Former Northridge Mall Fence Replacement Project
02/14/2024 04:30 PM UTC
OFFICIAL NOTICE 37-1-2024
Remote Bridge Upgrades at Multiple Locations
02/13/2024 04:30 PM UTC
OFFICIAL NOTICE 32-1-2024
2024 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2024 04:30 PM UTC
OFFICIAL NOTICE 31-1-2024
200 Lead Service Line Replacements prior to Paving
02/01/2024 04:30 PM UTC
OFFICIAL NOTICE 14-1-2024
Former Northridge Mall Fence Replacement Project
01/30/2024 04:30 PM UTC
OFFICIAL NOTICE 6-1-2024
WATER MAIN RELAYS & HYDRANT ALTERATIONS, at the following locations: North 52nd St. (WT410180623), W. Custer Av. to W. Silver Spring Dr. (24 working days); W. Sheridan Av. (WT410220615), N. 51st Blvd. to N. 57th St. (31 working days); N. 87th St. (WT410220630), W. Villard Av. to W. Lawn Av. (14 working days); N. 90th St. (WT410220631), W. Villard Av. to W. Rohr Av. (12 working days); N. 75th St. (WT410220661), 350’ S/O N. 75th Ct. to W. Talmadge Pl. (12 working days); N. 75th Ct. (WT410220662), N. 75th St. to 135’ W/O N. 75th St. (5 working days); N. Dousman St. (WT410230605), E. Meinecke Av. to E. Clarke St. (79 working days); E. Potter Av. (WT410230606), E. Russell Av. to S. Kinnickinnic Av. (64 working days); E. Falling Heath Pl. (WT410230618), S. Kinnickinnic Av. to S. Pennsylvania Av. (19 working days); E. Linus St. (WT410230698), S. Kinnickinnic Av. to S. Logan Av. (67 working days); E. Howard Av. (WT410230753), S. Lennox St. (3 working days); W. Forest Home Av. (WT410230754), 184’ SW/O W. Kelly Pl. (3 working days); E. Wells St. (WT410230755), N. Broadway to N. Van Buren St. (3 working days) (Note: Contractor to furnish and install approximately 11,030 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/29/2024 04:30 PM UTC
OFFICIAL NOTICE 5-1-2024
WATER MAIN RELAYS, at the following locations: N. 100th St. (WT410220600), W. Capitol Dr. to W. Grantosa Dr. (26 working days); W. Grantosa Dr. (WT410220614), 225’ E/O N. 100th St. to N. 100th St. (6 working days); N. Burbank Av (WT410220621), W. Casper St. to W Green Tree Rd. (10 working days); N. 84th St. (WT410220622), W. Mill Rd. to N. Burbank Av. (51 working days); W. Acacia St. (WT410220623), N. 77th St. to N. 80th St. (19 working days); N. 78th St. (WT410220624), W. Acacia St. to W. Casper St. (21 working days); W. Casper St. (WT410220625), N. 77th St. to N. 78th St. (7 working days); N. 100th St. (WT410220651), W. Nash St. to W. Lisbon Av. (44 working days); N. 98th St. (WT410220652), W. Metcalf Pl. to W. Lisbon Av. (8 working days); N. 85th St. (WT410220673), W. Capitol Dr. to W. Olive St. (26 working days); W. Olive St. (WT410220674), N. 85th St. to N. 88th St. (18 working days); N. 88th St. (WT410220675), N. Colgate Cr. to W. Marion St. (16 working days); N. 83rd St. (WT410220676), W. Capitol Dr. to W. Hope Av. (25 working days); W. Fiebrantz Av. (WT410220677), N. 82nd St. to N. 84th St. (11 working days); N. 20th St. (WT410230001), W. North Av. to N. Hopkins St. (10 working days); . (Note: Contractor to furnish and install approximately 14575 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 4-1-2024
200 Lead Service Line Replacements
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 92-1-2023
HT-22 HAWLEY TANK PAINTING EXTERIOR AND INTERIOR PAINTING OF THE 2MG ELEVATED, POTABLE WATER STORAGE TANK
01/24/2024 04:30 PM UTC
OFFICIAL NOTICE 94-1-2023
Remote Bridge Upgrades at Multiple Locations
01/23/2024 04:30 PM UTC
261 - 270 of 1553 Solicitations
1 2 23 24 25 27 29 30 31 155 156