General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 31-1-2026
The general work requested is: THE INSTALLATION OF NON-INTRUSIVE DETECTION CAMERAS AT EXISTING SIGNALIZED INTERSECTIONS. Non-Intrusive Detection Grant 4 – ST320233401 Located at: 15 INTERSECTIONS, NORTH SIDE IN THE CITY OF MILWAUKEE (Wisconsin Department of Transportation ID No. 2984-29-94)
05/27/2026 03:30 PM UTC
OFFICIAL NOTICE 57-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 57-3-2026
200 LEAD SERVICE LINE REPLACEMENTS
05/29/2026 03:30 PM UTC
OFFICIAL NOTICE 61-1-2026
27th Street Viaduct Expansion Joint Replacement
06/01/2026 03:30 PM UTC
OFFICIAL NOTICE 62-1-2026
1000 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 62-2-2026
750 LEAD SERVICE LINE REPLACEMENTS - PRIORITIZATION PROGRAM
06/03/2026 03:30 PM UTC
OFFICIAL NOTICE 56-1-2026
46TH AND STATE STREET – RETAINING WALL REPLACEMENT
06/10/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
06/23/2026 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150104 - W. Woolworth Ave. - N. 51st St. to N. 56th St.
08/16/2017 03:30 PM UTC
OFFICIAL NOTICE 81-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150167 - S. 53rd St. - W. Nebraska Ave./ S. Utah Ave. to W. Oklahoma Ave.
08/15/2017 03:30 PM UTC
OFFICIAL NOTICE 105-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC.; Located at: (ST211170175) – S. 8th St. – W. Madison St. to W. Scott St. (1 Speed Hump) (ST211170144) – S. 11th St. – W. Oklahoma Ave. to W. Montana St. (3 Speed Humps) (ST211170111) – N. 19th Pl. – W. Stark St. to W. Fairmont Ave. (1 Speed Hump) (ST211170108) - N. 19th St. – W. Hampton Ave. to W. Stark St.. (1 Speed Hump) (ST211170109) – N. 19th St. – W. Stark St. to W. Fairmount Ave. (I Speed Hump) (ST211170107) – S. 19th St. – W. Burnham St. to W. Mitchell St. (1 Speed Hump) (ST211170112) – N. 28th St. – W. Chambers St. to W. Burleigh St. (1 Speed Hump) (ST211170136) – N. 28th St. – W. Locust St. to W. Chambers St. (1 Speed Hump) (ST211170143) – S. 30th St. – W. Hayes Ave. to W. Lincoln Ave. (1 Speed Hump) (ST211170189) – S. 30th St. – W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) (ST211170188) – S. 31st St. – W. Grant St. to W. Becher St. (1 Speed Hump) (ST211170157) – N. 34th St. – W. Park Hill Ave. to W. St. Paul Ave. (2 Speed Humps) (ST211150195) – N. 36th St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170131) – S. 36th St. – W. National Ave. to W. Pierce St. (1 Speed Hump) (ST211170113) – N. 38th St. – W. Villard Ave. to W. Rohr Ave. (1 Speed Hump) (ST211160145) – N. 39th St. – W. Silver Spring Dr. to W. Florist Ave. (4 Speed Humps) (ST211170114) – N. 40th St. – W. Roosevelt Dr. to W. Capitol Dr. (1 Speed Hump) (ST211170115) – N. 42nd St. – W. Thurston Ave. to W. Florist Ave. (3 Speed Humps) (ST211170137) – N. 44th St. – W. Hadley St. to W. Locust St. (1 Speed Hump) (ST211170116) – N. 46th St. – W. Glendale Ave. to W. Hampton Ave. (2 Speed Humps) (ST211151165) – N. 53rd St. – W. Roosevelt Dr. to W. Keefe Ave. (1 Speed Hump) (ST211170119) – N. 54th Blvd. – W. Keefe Ave. to W. Melvina St. (3 Speed Humps) (ST211170118) - N. 54th St. – W. Roosevelt Dr. to W. Keefe Ave. (2 Speed Humps) (ST211170106) - N. 56th St. – W. Wright St. to W. Clarke St. (1 Speed Hump) (ST211170184) – N. 75th St. – W. Beckett Ave. to W. Marion St. (1 Speed Hump) (ST211170162)-W. Bobolink Av. – A pt. e/o N. 29th St. to N. Teutonia Av. (2 Speed Humps) (ST211130156) – N. Buffum St. – E. Clarke St. to E. Center St. (1 Speed Hump) (ST211160136) – W. Congress St. – N. 22nd St. to N. Teutonia Ave. (2 Speed Humps) (ST211170120) – N. Grant Blvd. – W. Clarke St. to W. Center St. (1 Speed Hump) (ST211170124) – W. McKinley Ave. – N. 18th St. to N. 19th St. (1 Speed Hump) (ST211160148) – W. Medford Av. – W. Congress St. to W. Baldwin St. (2 Speed Humps) (ST211170105) – W. Michigan St. – N. 32nd St. to N. 33rd St. (1 Speed Hump) (ST211170128) – W. Scott St. – S. 30th St. to S. 31st St. (1 Speed Hump) (ST211170127) – E. Smith St. – S. Howell Ave. to S. Burrell St. (2 Speed Humps)
08/14/2017 03:30 PM UTC
OFFICIAL NOTICE 97-1-2017
LEAD SERVICE LINE REPLACEMENT, at 100 locations, by qualified City of Milwaukee licensed and bonded contractors. Locations will be at various sites throughout the City of Milwaukee.
08/11/2017 03:30 PM UTC
OFFICIAL NOTICE 3-1-2017
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” & 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKINGS, CONCRETE REMOVALS, TRACK ZONE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120171) E. Nash St. - N. Fratney St. to N. Holton St. (Elimination of RR X-ings)
08/04/2017 03:30 PM UTC
OFFICIAL NOTICE 56-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY, SANITARY AND STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: S. 13th St. – W. Waterford Ave. to A Pt. 305’+/- N. of Waterford Ave.; S. 33rd St. – W. Branting Ln. to W. Lapham St.; W. Barnard Ave. – S. 13th St. to S. 14th St.; W. Branting Ln. – 175’+/-E. of S. 33rd St. to S. 33rd St.; Easement S. of W. Barnard Ave. Ext’d. – North-South Freeway to 90’+/- W. of North-South Freeway.; W. Lapham St. – 160’ East of S. 33rd St. to S. 34th St.; W. Orchard St. – S. 29th St. to S. 31st St.
07/28/2017 03:30 PM UTC
OFFICIAL NOTICE 93-1-2017
LEAD SERVICE LINE REPLACEMENT, at 100 locations, by qualified City of Milwaukee licensed and bonded contractors. Locations will be at various sites throughout the City of Milwaukee
07/27/2017 03:30 PM UTC
OFFICIAL NOTICE 90-1-2017
WATER MAIN RELAYS, INTERNAL JOINT SEALS AND ABANDONMENTS at the following locations: N. Van Buren St. (WT410160719), E. Michigan St. to E. Wisconsin Av. (5 working days); N. 4th St. (WT410160781), W. State St. to W. Juneau Av. (28 working days); W. Juneau Av. (WT410170622), Old World Third St. to 200’ W/O N. 6th St. (35 working days); W. Highland Av. (WT410170623), Old World Third St. to N. 4th St. (11 working days); N. 6th St. (WT410170625), W. Highland Av. to W. Juneau Av. (15 working days); E. Michigan St. (WT410170722), N. Jackson St. to N. Van Buren St. (13 working days). Note: Contractor to furnish and install approximately 2,571 lin. ft. of 12”, 8” and 6” ductile iron pipe. Contractor to furnish and install approximately 481 lin. ft. of 30” ductile iron pipe. Contractor to install approximately 40 lin. ft. of 36”, 24” and 20” ductile iron pipe. Contractor to prepare and permanently seal approximately 30 interior joints of 36” water main and 38 interior joints of 30” water main. City to furnish miscellaneous materials as shown on plans and proposal form.
07/26/2017 03:30 PM UTC
OFFICIAL NOTICE 55-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY, & STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: S. Austin St. – E. Morgan Ave. to E. Warnimont Ave. S. Kinnickinnic Ave. – E. Ohio Ave. to 110' S. of E. Ohio Ave. E. Layton Ave. – S. Howell Ave. to S. Burrell St. S. Taylor Ave. – S. Whitnall Ave. to E. Bolivar Ave. S. Whitnall Ave. – S. Quincy Ave. to S. Pine Ave.
07/25/2017 03:30 PM UTC
OFFICIAL NOTICE 3-1-2017
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” & 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKINGS, CONCRETE REMOVALS, TRACK ZONE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120171) E. Nash St. - N. Fratney St. to N. Holton St. (Elimination of RR X-ings)
07/21/2017 03:30 PM UTC
991 - 1000 of 1577 Solicitations
1 2 96 97 98 100 102 103 104 157 158