General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 96-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
09/17/2025 03:30 PM UTC
OFFICIAL NOTICE 89-1-2025
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, REPAIR OF EXISTING SPEED HUMPS, REPAINTING AND REFURBISHING OF EXSITING PAVEMENT MARKINGS, ETC.; Construction of Asphalt Speed Humps at these locations: ST211250103 2025 Existing Speed Hump Maintenance TBD ST211250155 Cherokee Point Neighborhood (4 Speed Humps) ST211250148 E. Potter Ave. - A pt. 375' e/o E. Russell Ave. to E. Russell Ave. (1 Speed Hump) ST211250149 E. Russell Ave. - S. Quincy Ave. to S. Adams Ave. (1 Speed Hump) ST211250126 E. Van Beck Ave. - S. Whitnall Ave. to S. Howell Ave. (2 Speed Humps) ST211250129 N. 33rd St. - W. Meinecke Ave. to W. Wright St. (1 Speed Hump) ST211250144 N. 39th St. - W. Glendale Ave. to W. Courtland Ave. (1 Speed Hump) ST211250118 N. 41st St. - W. Congress St. to W. Ruby Ave. (1 Speed Hump) ST211250119 N. 45th St. - W. Center St. to W. Hadley St. (1 Speed Hump) ST211250146 N. 51st St. - W. Washington Blvd. to W. Vine St. (1 Speed Hump) ST211250120 N. 58th St. - W. Hadley St. to W. Locust St. (1 Speed Hump) ST211250109 N. 61st St. - W. Melvina St. to W. Capitol Dr. (1 Speed Hump) ST211250140 N. 62nd St. - W. Congress St. to W. Medford Ave. (1 Speed Hump) ST211250141 N. 66th St. - W. Stark St. to W. Lancaster Ave. (2 Speed Humps) ST211250110 N. 70th St. - W. Marion St. to W. Congress St. (1 Speed Hump) ST211250116 N. 88th St. - W. Concordia Ave. to W. Townsend St. (1 Speed Hump) ST211250114 N. Arlington Pl. - E. Hamilton St. to E. Kane Pl. (1 Speed Hump) ST211250111 N. Hackett Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211250142 N. Jackson St. - E. Pleasant St. to N. Water St. (2 Speed Humps) ST211250112 N. Prospect Ave. - E. Park Pl. to E. Newberry Blvd. (1 Speed Hump) ST211170121 N. Stowell Ave. - E. Newberry Blvd. to E. Locust St. (1 Speed Hump) ST211250113 N. Warren Ave. - E. Hamilton St. to E. Boylston St. (2 Speed Humps) ST211250132 S. 10th St. - W. Lapham Blvd. to W. Orchard St. (1 Speed Hump) ST211250125 S. 12th St. - W. Lapham Blvd. to W. Greenfield Ave. (2 Speed Humps) ST211250147 S. 23rd St. - W. Parnell Ave. to W. Denis Ave. (2 Speed Humps) ST211250123 S. 37th St. - W. Morgan Ave. to W. Ohio Ave. (3 Speed Humps) ST211250128 S. 9th Pl. - W. Euclid Ave. to W. Oklahoma Ave. (1 Speed Hump) ST211250130 W. Clarke St. - N. 19th St. to N. 20th St. (1 Speed Hump) ST211250122 W. Holt Ave. - S. 91st St. to S. 92nd St. (1 Speed Hump) ST211250117 W. Hope Ave. - N. 81st St. to N. 84th St. (3 Speed Humps) ST211250139 W. Lawn Ave. - N. 87th St. to N. 90th St. (1 Speed Hump) ST211220144 W. Thurston Ave. - N. 89th St. to N. 91st St. (2 Speed Humps) ST211250145 N. 73rd St. - W. Brentwood Ave. To N. Yuba St. (3 Speed Humps)
09/25/2025 03:30 PM UTC
OFFICIAL NOTICE 86-1-2025
PROJECT 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. N. 24th Pl.- W. Melvina St. to W. Capitol Dr. N. 38th St – W. Michigan St. to 300' +/- N of W. Michigan St. W. Capitol Dr. –N. 25th St. to N. 26th St. W. Everett St.– 175' +/- W. of N. Vel R. Phillips Ave. to N. Vel R. Phillips Ave. W. Lisbon Ave.– N. 46th St. to N. 52nd St. N. Pierce St.– 300' +/- S. of E. Wright St. to E. Wright St.
09/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2017
Recycling of Residential Electronic Materials. The work in this project includes provisions for collection, transportation, processing, recycling, and disposal of residential electronic materials for recovery of resources and diversion from landfill and to comply with all local and state laws. Companies responding to this bid shall review and comply with the requirements specified in the bid.
03/13/2017 02:30 PM UTC
OFFICIAL NOTICE 33-1-2017
WATER MAIN RELAYS at the following locations: E. Locust St. (WT410170605), N. Farwell Av. to N. Downer Av. (32 working days); E. Kane Pl. (WT410170628), N. Farwell Av. to N. Prospect Av. (18 working days); W. Glendale Av. (WT410170637), N. Parkway Av. to N. Green Bay Av. (11 working days); N. Franklin Pl. (WT410150653), N. Prospect Av. to E. Ogden Av. (23 working days); N. Summit Av. (WT410160663), E. Kane Pl. to E. Lafayette Pl. (20 working days); E. Kane Pl. (WT410160664), N. Prospect Av. to N. Summit Av. (11 working days) (Note: Contractor to furnish and install approximately 3,825 lin. ft. of 16”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 34-1-2017
WP-317: PIPE GALLERY ROOF REPLACEMENTS LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 36-1-2017
City-Wide Removal of Weeds and Tall Grasses, Sidewalk Snow and Ice and Right-of-Way Encroachments from Private Property in Violation of City Ordinance 80-17, 116-8, and 116-55.
03/09/2017 04:30 PM UTC
OFFICIAL NOTICE 19-1-2017
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216160110 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2017 High Impact Paving Projects
03/08/2017 04:30 PM UTC
OFFICIAL NOTICE 17-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 17-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 44-1-2017
WATER MAIN RELAYS in the following locations: S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days) (Note: Contractor to furnish and install approx. 3004 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
03/06/2017 04:30 PM UTC
OFFICIAL NOTICE 12-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 12-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
981 - 990 of 1500 Solicitations
1 2 95 96 97 99 101 102 103 149 150