General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
Colemans Crossing & Honda Marysville Traffic Signal
This project consists of installing a traffic signal, including curb ramp replacement, signage and pavement marking modifications, at the intersection of Colemans Crossing Boulevard and the Honda Marysville/Wal-Mart drive in the City of Marysville, Ohio. There will be a Pre-Bid Meeting held virtually on February 27, 2026 at 10:00 A.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. VIRTUAL Pre-Bid Meeting: Colemans Crossing & Honda Marysville Traffic Signal Friday, February 27 ⋅ 10:00 – 11:00am Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/mnx-qanr-tfy Join by phone: ‪(US) +1 440-652-2236‬ PIN: ‪927 633 336‬#‬‬‬‬
03/13/2026 02:00 PM UTC
2026 Paving Program
The project consists of the following: • Pavement planing and re-surfacing of approximately 8,500 L.F of roadway • Including curb ramp, curb, and sidewalk replacement • Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course • Installation of pavement markings
04/02/2026 05:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Mill Valley Stormwater Improvements
The City of Marysville Mill Valley Stormwater Improvement project includes the following: Removal of two (2) stormwater detention basins by filling in the detention basins with suitable fill material to the proposed elevations and the removal of a non-functioning stormwater pump station, including all associated storm piping, storm structures and electrical items. Installation of approximately 1200 linear feet of storm sewer ranging from 12” to 48” in diameter, 8 storm manholes and 1 storm headwall. Necessary restoration (including fencing, topsoil, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
08/28/2017 05:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
08/23/2017 06:00 PM UTC
33 Innovation Park, Phase 1
The 33 Innovation Park, Phase 1 project consists of the installation of a new public roadway (including curbing and an asphalt multi-use path) and associated public utilities (sanitary sewer, waterline, and storm sewer). The project also includes the widening of Industrial Parkway for a proposed turn lane. The City's approximate budget for this project is $1,600,000.
06/21/2017 05:30 PM UTC
Water Division 2017 Materials
City of Marysville Division of Water 2017 Materials Contract
04/24/2017 05:00 PM UTC
City of Marysville South Court Street and West 6th Street Waterline Replacment
City of Marysville Capital Improvement Project involving waterline replacement along sections of South Court Street and West 6th Street.
04/11/2017 05:30 PM UTC
City of Marysville 2017 Paving Program
City of Marysville's annual paving program.
03/21/2017 06:00 PM UTC
131 - 136 of 136 Solicitations
1 2 6 7 8 9 10 11 12 14 Next →