City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
| Name * | Description | |
|---|---|---|
| 2016 odot construction and material specifications.pdf (6.83 MB) | ||
| general plan notes.pdf (18 KB) | ||
| public roadway plan notes.pdf (46.2 KB) | ||
| sanitary sewer plan notes.pdf (50.5 KB) | ||
| storm sewer plan notes.pdf (48.5 KB) | ||
| water plan notes.pdf (47.8 KB) | ||
| sanitary sewer specifications.pdf (1.1 MB) | ||
| water specifications.pdf (9.63 MB) | ||
| sanitary sewer standard drawings.pdf (1.66 MB) | ||
| stormwater standard drawings.pdf (2.11 MB) | ||
| street standard drawings.pdf (3.52 MB) | ||
| water standard drawings.pdf (2.37 MB) | ||
| marysville supplemental specifcations.pdf (773 KB) | ||
| stormwater drainage manual.pdf (2.89 MB) | ||
| marysville_2017 w-9.pdf (75.7 KB) | ||
| Number | Deadline |
|---|---|
|
2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year.
The ESTIMATED quantities are:
Carbon Dioxide (CO2) - 600,000 lbs.
Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
| 11/12/2026 03:00 PM UTC |
|
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring.
The ESTIMATED quantities are:
Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons
Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
| 11/12/2026 03:00 PM UTC |
|
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
| 11/16/2026 08:00 PM UTC |
|
2027 Sanitary Sewer Cured-in-Place Pipe (CIPP) Lining Project
The work consists of completing cured-in-place pipe lining (CIPP). Specifications include Traffic Control, TV Inspection, Cleaning, Chemical Grouting, CIPP, Service Connection Liner, Polyurea Manhole Rehabilitation, Temporary Bypass Pumping.
Project Location
• Between 7th and 8th Street from Grove Street to S. Court Street
• Between 5th and 6th Street from Chestnut Street to Poplar Street
Pre-Bid Meeting Information (VIRTUAL)
Date: November 12, 2026
Time: 1:00 PM
https://teams.microsoft.com/meet/2378991686536148?p=jPklmmYPdA3SNmDhbG
Meeting ID: 237 899 168 653 614 8
Password: 2dj2rG66
| 11/20/2026 03:00 PM UTC |
| Number | Deadline |
|---|---|
|
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following:
- Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path
- Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins
- Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation
- Waterline – 320 feet of 12” waterline and the associated appurtenances
- Landscaping – 136 trees and seeding and mulching
| 05/07/2018 05:30 PM UTC |
|
33 Innovation Park Development Signage
The project consists of the installation of the following:
- One (1) 33 Innovation Park Development Sign (including the sign structure) along US 33.
- One (1) 33 Innovation Park Development Sign (including the sign structure) along Industrial Parkway.
- Associated electric work to provide lighting to each sign.
- Necessary grading to achieve the desired elevation of each sign.
Per the Bid Documents, Alternate Bids for the sign(s) materials (columns and bases) may be considered.
| 04/02/2018 05:30 PM UTC |
|
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following:
• Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet
• Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet
• Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet
• The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
| 03/14/2018 07:30 PM UTC |
|
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following:
Combination signal support poles and signal heads.
Traffic signal controller and cabinet.
Installation of fiber optic cable and video detection system.
Other necessary construction items related to traffic signal installation.
| 03/02/2018 07:00 PM UTC |
|
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following:
1) Pavement resurfacing of approximately 19,000 LF of roadway.
2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk.
3) Installation of pavement markings
| 03/02/2018 07:00 PM UTC |
|
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
| 11/16/2017 06:00 PM UTC |
|
Mill Valley Stormwater Improvements
The City of Marysville Mill Valley Stormwater Improvement project includes the following:
Removal of two (2) stormwater detention basins by filling in the detention basins with suitable fill material to the proposed elevations and the removal of a non-functioning stormwater pump station, including all associated storm piping, storm structures and electrical items.
Installation of approximately 1200 linear feet of storm sewer ranging from 12” to 48” in diameter, 8 storm manholes and 1 storm headwall.
Necessary restoration (including fencing, topsoil, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
| 08/28/2017 05:30 PM UTC |
|
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following:
Combination signal support poles and signal heads.
Traffic signal controller and cabinet.
Installation of fiber optic cable and video detection system.
Other necessary construction items related to traffic signal installation.
| 08/23/2017 06:00 PM UTC |
|
33 Innovation Park, Phase 1
The 33 Innovation Park, Phase 1 project consists of the installation of a new public roadway (including curbing and an asphalt multi-use path) and associated public utilities (sanitary sewer, waterline, and storm sewer). The project also includes the widening of Industrial Parkway for a proposed turn lane. The City's approximate budget for this project is $1,600,000.
| 06/21/2017 05:30 PM UTC |
|
Water Division 2017 Materials
City of Marysville Division of Water 2017 Materials Contract
| 04/24/2017 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.