General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway. U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting Wednesday, January 8th, 2025 · 2:00 – 3:00pm Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation Wednesday, January 8, 2025 · 2:00 – 3:00pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/uni-crgj-vnq Or dial: ‪(US) +1 302-316-4650‬ PIN: ‪191 862 263‬# More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
01/22/2025 06:00 PM UTC
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications. Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting Wednesday, January 8th, 2025 · 1:00 – 2:00pm Pre-Bid : Coleman's Crossing & Industrial Parkway RAB Wednesday, January 8, 2025 · 1:00 – 2:00pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/dao-qicj-iqe Or dial: ‪(US) +1 650-535-0802‬ PIN: ‪961 673 407‬# More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
01/22/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
City of Marysville 2019 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Chlorine
The work consists of providing Chlorine in 150 lb cylinders (estimated quantity is 50,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Hydroflouricillic Acid
The work consists of providing Hydroflouricillic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
Plum Street Improvements
The project consists of the installation of the following: -Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic -Storm Sewer: A 50 foot long 16’x 5’ box culvert -Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better. The Engineer's Estimate for this project is $807,981.63
07/16/2018 07:41 PM UTC
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following: - The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations - This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic. - The Engineer's Estimate for this project is $279,800.00.
06/25/2018 05:30 PM UTC
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following: -Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. -Maintenance of Traffic and the associated detour signage will be handled by separate contract.
05/15/2018 05:30 PM UTC
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following: - Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path - Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins - Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation - Waterline – 320 feet of 12” waterline and the associated appurtenances - Landscaping – 136 trees and seeding and mulching
05/07/2018 05:30 PM UTC
33 Innovation Park Development Signage
The project consists of the installation of the following: - One (1) 33 Innovation Park Development Sign (including the sign structure) along US 33. - One (1) 33 Innovation Park Development Sign (including the sign structure) along Industrial Parkway. - Associated electric work to provide lighting to each sign. - Necessary grading to achieve the desired elevation of each sign. Per the Bid Documents, Alternate Bids for the sign(s) materials (columns and bases) may be considered.
04/02/2018 05:30 PM UTC
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following: • Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet • Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet • Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
03/14/2018 07:30 PM UTC
111 - 120 of 129 Solicitations