City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
Name * | Description | |
---|---|---|
2016 odot construction and material specifications.pdf (6.83 MB) | ||
general plan notes.pdf (18 KB) | ||
public roadway plan notes.pdf (46.2 KB) | ||
sanitary sewer plan notes.pdf (50.5 KB) | ||
storm sewer plan notes.pdf (48.5 KB) | ||
water plan notes.pdf (47.8 KB) | ||
sanitary sewer specifications.pdf (1.1 MB) | ||
water specifications.pdf (9.63 MB) | ||
sanitary sewer standard drawings.pdf (1.66 MB) | ||
stormwater standard drawings.pdf (2.11 MB) | ||
street standard drawings.pdf (3.52 MB) | ||
water standard drawings.pdf (2.37 MB) | ||
marysville supplemental specifcations.pdf (773 KB) | ||
stormwater drainage manual.pdf (2.89 MB) | ||
marysville_2017 w-9.pdf (75.7 KB) | ||
Number | Deadline |
---|---|
Number | Deadline |
---|---|
City of Marysville 2019 Wastewater Chemicals - Propane
The work consists of providing propane for the City of Marysville's Division of Wastewater during the 2019 calendar year:
| 12/17/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Ferric Chloride Bulk
The work consists of providing Ferric Chloride Bulk in 300 gallon totes (estimated quantity is 4,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year AND Ferric Chloride Bulk (estimated quantity is 516,000 lbs) for for the City of Marysville's wastewater treatment plant operations during the 2019 calendar year.
| 12/10/2018 02:30 PM UTC |
City of Marysville Dunham Water Tower Painting
The Dunham Water Tower Painting project consists of the following:
- Installation of a flap gate on the overflow pipe.
- Replacing the roof vent.
- Secure overflow pipe to lower leg of tower
- Installation of an internal balcony in the bowl.
- Pit welding.
- Replacing the aviation lights.
- Abrasive blast cleaning and repainting the interior.
- Abrasive blast cleaning and repainting the exterior with containment.
- Applying City logo as directed.
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Chlorine
The work consists of providing Chlorine in 150 lb cylinders (estimated quantity is 50,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Hydroflouricillic Acid
The work consists of providing Hydroflouricillic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
Plum Street Improvements
The project consists of the installation of the following:
-Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic
-Storm Sewer: A 50 foot long 16’x 5’ box culvert
-Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes
-Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better.
The Engineer's Estimate for this project is $807,981.63
| 07/16/2018 07:41 PM UTC |
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following:
- The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations
- This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic.
- The Engineer's Estimate for this project is $279,800.00.
| 06/25/2018 05:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.