2021 Carbon Dioxide
The work consists of providing Carbon Dioxide (estimated quantity is 300,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2021 Chlorine
The work consists of providing Chlorine in 150 lb. cylinders (estimated quantity is 50,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2021 Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2021 Hydrofluorosilicic Acid
The work consists of providing Hydrofluorosilicic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2021 Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphosphate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2021 Ferric Chloride, Bulk
The work consists of providing Ferric Chloride Bulk in 300 gallon totes (estimated quantity is 4,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
2020 Removal of Water Treatment Plant Lime Lagoon Sludge Residual
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
07/14/2020 02:30 PM UTC
US 33 / Scottslawn Rd Traffic Signals
The project consists of the installation of two new traffic signals at the US 33 / Scottslawn Rd interchange and includes the following: • Combination signal support poles and signal heads • Traffic signal controllers and cabinets • Installation of fiber optic cable and video detection system • Other necessary construction items related to traffic signal installation
06/12/2020 06:00 PM UTC
Marysville Water Treatment Plant
The project consists of building a new 7.5 MGD water treatment plant on a greenfield site owned by the City and generally consisting of the following aspects: - Site development including paving, underground utilities, grading, landscaping, and restoration. - Treatment processes including pumping, pretreatment basins, aerator, lime and soda ash storage and feed equipment, solids contact clarifiers, recarbonation basin and liquid carbon dioxide feed equipment, ozone contact basin and ozone generation and feed equipment, gravity media filters, 2 million gallon cast-in-place clearwell, chemical feed systems, residuals pumping and recycle facilities, sludge storage lagoons, and all related process integration items. - A new 37,000 SF building for the administration and main treatment process functions. Administration building also includes offices, conference / break room areas, restrooms, maintenance area, electrical and mechanical rooms, control room, and laboratory. - A new 1,800 SF ozone and recarbonation system building. - A new 1,800 SF high service pumping building. - All related HVAC and plumbing systems associated with the new buildings. - All related electrical infrastructure associated with the new buildings and treatment equipment including a standby diesel generator. The Engineer's Estimate for this project is $50,000,000.00
05/08/2020 06:00 PM UTC
Customer Service Counter Upgrades
The project consists of the installation of the following: • (5) Six-feet wide teller stations with bullet-resistant glazing and built-in secure transaction measures. • New built-in millwork desks including new counters, casework, and divider panels. • Conference area with built-in millwork conference desk and new full-height glass wall divider. • Related necessary mechanical, electrical, fire protection, and technological changes. • Necessary restoration in space including patching, repainting, and other miscellaneous items required to restore the area to its original condition, or better.
04/06/2020 06:00 PM UTC