General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway. U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting Wednesday, January 8th, 2025 · 2:00 – 3:00pm Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation Wednesday, January 8, 2025 · 2:00 – 3:00pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/uni-crgj-vnq Or dial: ‪(US) +1 302-316-4650‬ PIN: ‪191 862 263‬# More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
01/22/2025 06:00 PM UTC
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications. Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting Wednesday, January 8th, 2025 · 1:00 – 2:00pm Pre-Bid : Coleman's Crossing & Industrial Parkway RAB Wednesday, January 8, 2025 · 1:00 – 2:00pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/dao-qicj-iqe Or dial: ‪(US) +1 650-535-0802‬ PIN: ‪961 673 407‬# More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
01/22/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
03/02/2018 07:00 PM UTC
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 19,000 LF of roadway. 2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk. 3) Installation of pavement markings
03/02/2018 07:00 PM UTC
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
11/16/2017 06:00 PM UTC
Mill Valley Stormwater Improvements
The City of Marysville Mill Valley Stormwater Improvement project includes the following: Removal of two (2) stormwater detention basins by filling in the detention basins with suitable fill material to the proposed elevations and the removal of a non-functioning stormwater pump station, including all associated storm piping, storm structures and electrical items. Installation of approximately 1200 linear feet of storm sewer ranging from 12” to 48” in diameter, 8 storm manholes and 1 storm headwall. Necessary restoration (including fencing, topsoil, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
08/28/2017 05:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
08/23/2017 06:00 PM UTC
33 Innovation Park, Phase 1
The 33 Innovation Park, Phase 1 project consists of the installation of a new public roadway (including curbing and an asphalt multi-use path) and associated public utilities (sanitary sewer, waterline, and storm sewer). The project also includes the widening of Industrial Parkway for a proposed turn lane. The City's approximate budget for this project is $1,600,000.
06/21/2017 05:30 PM UTC
Water Division 2017 Materials
City of Marysville Division of Water 2017 Materials Contract
04/24/2017 05:00 PM UTC
City of Marysville South Court Street and West 6th Street Waterline Replacment
City of Marysville Capital Improvement Project involving waterline replacement along sections of South Court Street and West 6th Street.
04/11/2017 05:30 PM UTC
City of Marysville 2017 Paving Program
City of Marysville's annual paving program.
03/21/2017 06:00 PM UTC
121 - 129 of 129 Solicitations
1 2 5 6 7 8 9 10 11 13 Next →