General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year. The ESTIMATED quantities are: Carbon Dioxide (CO2) - 600,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring. The ESTIMATED quantities are: Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
11/16/2026 08:00 PM UTC
2027 Sanitary Sewer Cured-in-Place Pipe (CIPP) Lining Project
The work consists of completing cured-in-place pipe lining (CIPP). Specifications include Traffic Control, TV Inspection, Cleaning, Chemical Grouting, CIPP, Service Connection Liner, Polyurea Manhole Rehabilitation, Temporary Bypass Pumping. Project Location • Between 7th and 8th Street from Grove Street to S. Court Street • Between 5th and 6th Street from Chestnut Street to Poplar Street Pre-Bid Meeting Information (VIRTUAL) Date: November 12, 2026 Time: 1:00 PM https://teams.microsoft.com/meet/2378991686536148?p=jPklmmYPdA3SNmDhbG Meeting ID: 237 899 168 653 614 8 Password: 2dj2rG66
11/20/2026 03:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
City of Marysville 2019 Water Treatment Chemicals - Ferric Chloride Bulk
The work consists of providing Ferric Chloride Bulk in 300 gallon totes (estimated quantity is 4,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year AND Ferric Chloride Bulk (estimated quantity is 516,000 lbs) for for the City of Marysville's wastewater treatment plant operations during the 2019 calendar year.
12/10/2018 02:30 PM UTC
City of Marysville Dunham Water Tower Painting
The Dunham Water Tower Painting project consists of the following: - Installation of a flap gate on the overflow pipe. - Replacing the roof vent. - Secure overflow pipe to lower leg of tower - Installation of an internal balcony in the bowl. - Pit welding. - Replacing the aviation lights. - Abrasive blast cleaning and repainting the interior. - Abrasive blast cleaning and repainting the exterior with containment. - Applying City logo as directed.
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Chlorine
The work consists of providing Chlorine in 150 lb cylinders (estimated quantity is 50,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Hydroflouricillic Acid
The work consists of providing Hydroflouricillic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
Plum Street Improvements
The project consists of the installation of the following: -Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic -Storm Sewer: A 50 foot long 16’x 5’ box culvert -Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better. The Engineer's Estimate for this project is $807,981.63
07/16/2018 07:41 PM UTC
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following: - The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations - This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic. - The Engineer's Estimate for this project is $279,800.00.
06/25/2018 05:30 PM UTC
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following: -Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. -Maintenance of Traffic and the associated detour signage will be handled by separate contract.
05/15/2018 05:30 PM UTC
121 - 130 of 142 Solicitations
1 2 … 7 8 9 10 11 13 15