General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
Colemans Crossing & Honda Marysville Traffic Signal
This project consists of installing a traffic signal, including curb ramp replacement, signage and pavement marking modifications, at the intersection of Colemans Crossing Boulevard and the Honda Marysville/Wal-Mart drive in the City of Marysville, Ohio. There will be a Pre-Bid Meeting held virtually on February 27, 2026 at 10:00 A.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. VIRTUAL Pre-Bid Meeting: Colemans Crossing & Honda Marysville Traffic Signal Friday, February 27 ⋅ 10:00 – 11:00am Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/mnx-qanr-tfy Join by phone: ‪(US) +1 440-652-2236‬ PIN: ‪927 633 336‬#‬‬‬‬
03/13/2026 02:00 PM UTC
2026 Paving Program
The project consists of the following: • Pavement planing and re-surfacing of approximately 8,500 L.F of roadway • Including curb ramp, curb, and sidewalk replacement • Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course • Installation of pavement markings
04/02/2026 05:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
12/04/2018 08:00 PM UTC
Plum Street Improvements
The project consists of the installation of the following: -Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic -Storm Sewer: A 50 foot long 16’x 5’ box culvert -Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better. The Engineer's Estimate for this project is $807,981.63
07/16/2018 07:41 PM UTC
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following: - The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations - This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic. - The Engineer's Estimate for this project is $279,800.00.
06/25/2018 05:30 PM UTC
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following: -Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road -Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. -Maintenance of Traffic and the associated detour signage will be handled by separate contract.
05/15/2018 05:30 PM UTC
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following: - Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path - Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins - Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation - Waterline – 320 feet of 12” waterline and the associated appurtenances - Landscaping – 136 trees and seeding and mulching
05/07/2018 05:30 PM UTC
33 Innovation Park Development Signage
The project consists of the installation of the following: - One (1) 33 Innovation Park Development Sign (including the sign structure) along US 33. - One (1) 33 Innovation Park Development Sign (including the sign structure) along Industrial Parkway. - Associated electric work to provide lighting to each sign. - Necessary grading to achieve the desired elevation of each sign. Per the Bid Documents, Alternate Bids for the sign(s) materials (columns and bases) may be considered.
04/02/2018 05:30 PM UTC
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following: • Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet • Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet • Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
03/14/2018 07:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
03/02/2018 07:00 PM UTC
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 19,000 LF of roadway. 2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk. 3) Installation of pavement markings
03/02/2018 07:00 PM UTC
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
11/16/2017 06:00 PM UTC
121 - 130 of 136 Solicitations
1 2 6 7 8 9 10 11 13