City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
| Name * | Description | |
|---|---|---|
| 2016 odot construction and material specifications.pdf (6.83 MB) | ||
| general plan notes.pdf (18 KB) | ||
| public roadway plan notes.pdf (46.2 KB) | ||
| sanitary sewer plan notes.pdf (50.5 KB) | ||
| storm sewer plan notes.pdf (48.5 KB) | ||
| water plan notes.pdf (47.8 KB) | ||
| sanitary sewer specifications.pdf (1.1 MB) | ||
| water specifications.pdf (9.63 MB) | ||
| sanitary sewer standard drawings.pdf (1.66 MB) | ||
| stormwater standard drawings.pdf (2.11 MB) | ||
| street standard drawings.pdf (3.52 MB) | ||
| water standard drawings.pdf (2.37 MB) | ||
| marysville supplemental specifcations.pdf (773 KB) | ||
| stormwater drainage manual.pdf (2.89 MB) | ||
| marysville_2017 w-9.pdf (75.7 KB) | ||
| Number | Deadline |
|---|---|
|
Colemans Crossing & Honda Marysville Traffic Signal
This project consists of installing a traffic signal, including curb ramp replacement, signage and pavement marking modifications, at the intersection of Colemans Crossing Boulevard and the Honda Marysville/Wal-Mart drive in the City of Marysville, Ohio.
There will be a Pre-Bid Meeting held virtually on February 27, 2026 at 10:00 A.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities.
VIRTUAL Pre-Bid Meeting: Colemans Crossing & Honda Marysville Traffic Signal
Friday, February 27 ⋅ 10:00 – 11:00am
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/mnx-qanr-tfy
Join by phone: (US) +1 440-652-2236 PIN: 927 633 336#
| 03/13/2026 02:00 PM UTC |
|
2026 Paving Program
The project consists of the following:
• Pavement planing and re-surfacing of approximately 8,500 L.F of roadway
• Including curb ramp, curb, and sidewalk replacement
• Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course
• Installation of pavement markings
| 04/02/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
City of Marysville 2019 Water Treatment Chemicals - Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphoshate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |
|
Plum Street Improvements
The project consists of the installation of the following:
-Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic
-Storm Sewer: A 50 foot long 16’x 5’ box culvert
-Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes
-Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better.
The Engineer's Estimate for this project is $807,981.63
| 07/16/2018 07:41 PM UTC |
|
West Fifth Street Sanitary Relief Sewer
The project consists of the installation of the following:
- The installation of 930 feet of 12” sanitary sewer, 35 feet of 6” sanitary sewer, and 6 manhole installations
- This work is located within the eastbound lane of West Fifth Street and will include pavement repair and maintenance of traffic.
- The Engineer's Estimate for this project is $279,800.00.
| 06/25/2018 05:30 PM UTC |
|
SR 38 Vertical Realignment Improvements
The project consists of the installation of the following:
-Full depth replacement of 375 linear feet of SR 38 including the lowering of this roadway by two (2) feet to improve the sight distance from the adjacent Boerger Road
-Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
-Maintenance of Traffic and the associated detour signage will be handled by separate contract.
| 05/15/2018 05:30 PM UTC |
|
Mill Wood Boulevard Extension
The Mill Wood Boulevard Extension project consists of the installation of the following:
- Roadway – 2,800 feet of five lane public roadway between State Route 31 and State Route 4, including lighting, curb, sidewalk and an asphalt shared-use path
- Storm Sewer – 3,600 feet of storm sewer including the associated storm structures, 147 foot 8’x4’ box culvert, and two (2) water quality basins
- Sanitary Sewer – 3,300 feet of sanitary sewer extension including the associated manholes and 200 feet of jack and bore sanitary sewer installation
- Waterline – 320 feet of 12” waterline and the associated appurtenances
- Landscaping – 136 trees and seeding and mulching
| 05/07/2018 05:30 PM UTC |
|
33 Innovation Park Development Signage
The project consists of the installation of the following:
- One (1) 33 Innovation Park Development Sign (including the sign structure) along US 33.
- One (1) 33 Innovation Park Development Sign (including the sign structure) along Industrial Parkway.
- Associated electric work to provide lighting to each sign.
- Necessary grading to achieve the desired elevation of each sign.
Per the Bid Documents, Alternate Bids for the sign(s) materials (columns and bases) may be considered.
| 04/02/2018 05:30 PM UTC |
|
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following:
• Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet
• Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet
• Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet
• The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
| 03/14/2018 07:30 PM UTC |
|
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following:
Combination signal support poles and signal heads.
Traffic signal controller and cabinet.
Installation of fiber optic cable and video detection system.
Other necessary construction items related to traffic signal installation.
| 03/02/2018 07:00 PM UTC |
|
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following:
1) Pavement resurfacing of approximately 19,000 LF of roadway.
2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk.
3) Installation of pavement markings
| 03/02/2018 07:00 PM UTC |
|
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
| 11/16/2017 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.