City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
Name * | Description | |
---|---|---|
2016 odot construction and material specifications.pdf (6.83 MB) | ||
general plan notes.pdf (18 KB) | ||
public roadway plan notes.pdf (46.2 KB) | ||
sanitary sewer plan notes.pdf (50.5 KB) | ||
storm sewer plan notes.pdf (48.5 KB) | ||
water plan notes.pdf (47.8 KB) | ||
sanitary sewer specifications.pdf (1.1 MB) | ||
water specifications.pdf (9.63 MB) | ||
sanitary sewer standard drawings.pdf (1.66 MB) | ||
stormwater standard drawings.pdf (2.11 MB) | ||
street standard drawings.pdf (3.52 MB) | ||
water standard drawings.pdf (2.37 MB) | ||
marysville supplemental specifcations.pdf (773 KB) | ||
stormwater drainage manual.pdf (2.89 MB) | ||
marysville_2017 w-9.pdf (75.7 KB) | ||
Number | Deadline |
---|---|
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway.
U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 2:00 – 3:00pm
Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation
Wednesday, January 8, 2025 · 2:00 – 3:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/uni-crgj-vnq
Or dial: (US) +1 302-316-4650 PIN: 191 862 263#
More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
| 01/22/2025 06:00 PM UTC |
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications.
Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 1:00 – 2:00pm
Pre-Bid : Coleman's Crossing & Industrial Parkway RAB
Wednesday, January 8, 2025 · 1:00 – 2:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/dao-qicj-iqe
Or dial: (US) +1 650-535-0802 PIN: 961 673 407#
More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
| 01/22/2025 06:00 PM UTC |
Number | Deadline |
---|---|
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following:
Combination signal support poles and signal heads.
Traffic signal controller and cabinet.
Installation of fiber optic cable and video detection system.
Other necessary construction items related to traffic signal installation.
| 03/02/2018 07:00 PM UTC |
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following:
1) Pavement resurfacing of approximately 19,000 LF of roadway.
2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk.
3) Installation of pavement markings
| 03/02/2018 07:00 PM UTC |
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
| 11/16/2017 06:00 PM UTC |
Mill Valley Stormwater Improvements
The City of Marysville Mill Valley Stormwater Improvement project includes the following:
Removal of two (2) stormwater detention basins by filling in the detention basins with suitable fill material to the proposed elevations and the removal of a non-functioning stormwater pump station, including all associated storm piping, storm structures and electrical items.
Installation of approximately 1200 linear feet of storm sewer ranging from 12” to 48” in diameter, 8 storm manholes and 1 storm headwall.
Necessary restoration (including fencing, topsoil, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
| 08/28/2017 05:30 PM UTC |
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following:
Combination signal support poles and signal heads.
Traffic signal controller and cabinet.
Installation of fiber optic cable and video detection system.
Other necessary construction items related to traffic signal installation.
| 08/23/2017 06:00 PM UTC |
33 Innovation Park, Phase 1
The 33 Innovation Park, Phase 1 project consists of the installation of a new public roadway (including curbing and an asphalt multi-use path) and associated public utilities (sanitary sewer, waterline, and storm sewer). The project also includes the widening of Industrial Parkway for a proposed turn lane. The City's approximate budget for this project is $1,600,000.
| 06/21/2017 05:30 PM UTC |
Water Division 2017 Materials
City of Marysville Division of Water 2017 Materials Contract
| 04/24/2017 05:00 PM UTC |
City of Marysville South Court Street and West 6th Street Waterline Replacment
City of Marysville Capital Improvement Project involving waterline replacement along sections of South Court Street and West 6th Street.
| 04/11/2017 05:30 PM UTC |
City of Marysville 2017 Paving Program
City of Marysville's annual paving program.
| 03/21/2017 06:00 PM UTC |