General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year. The ESTIMATED quantities are: Carbon Dioxide (CO2) - 600,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring. The ESTIMATED quantities are: Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
11/16/2026 08:00 PM UTC
2027 Sanitary Sewer Cured-in-Place Pipe (CIPP) Lining Project
The work consists of completing cured-in-place pipe lining (CIPP). Specifications include Traffic Control, TV Inspection, Cleaning, Chemical Grouting, CIPP, Service Connection Liner, Polyurea Manhole Rehabilitation, Temporary Bypass Pumping. Project Location • Between 7th and 8th Street from Grove Street to S. Court Street • Between 5th and 6th Street from Chestnut Street to Poplar Street Pre-Bid Meeting Information (VIRTUAL) Date: November 12, 2026 Time: 1:00 PM https://teams.microsoft.com/meet/2378991686536148?p=jPklmmYPdA3SNmDhbG Meeting ID: 237 899 168 653 614 8 Password: 2dj2rG66
11/20/2026 03:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Pump Station # 2
The Pump Station #2 Improvements project will replace the City’s current Pump Station #2 with a pump station that will meet the ever-increasing sewer capacity demands within the southeastern portion of Union County. The existing Pump Station #2 is a 0.5 MGD pump station and is nearing its maximum capacity. The new pump station has a 1.5 MGD pumping capacity and is designed to expand (if needed) in the future to pump up to 2.5 MGD. Engineer's Cost Estimate: $6,474,000.00
06/11/2021 05:15 PM UTC
Hickory Run - Storm Sewer Improvements
- Installation of 400 LF of storm sewer (12", 24", & 36"), a headwall, and 3 manholes along Hickory Gate Drive -Installation of a 52' long 8'X4' box culvert under Pepperbush Court - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $450,000
06/11/2021 05:00 PM UTC
Uptown Alley Improvements
This project consists of: - Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks. - Installation of a dumpster and grease trap enclosure, decorative fencing, planter beds, string lighting, and outdoor seating. - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $548,320.00
05/21/2021 05:00 PM UTC
State Route 4 & Scott Farms Blvd Traffic Signal
City of Marysville Capital Improvement Project
04/06/2021 05:00 PM UTC
S.R. 38 IMPROVEMENTS - PHASE 1
The Project consists of 1,213-ft of pavement edge removal and replacement with 18-inch straight curb, upgrading pedestrian facilities, storm improvements, lighting installation, resurfacing, and other miscellaneous related improvements. Engineer's Estimate is $825,000 (Base Bid) An additional alternate bid project consist of 433-ft of sidewalk extension, drive reconstructions, and storm improvements. Engineer's Estimate is $111,000 (Alternate #1)
03/26/2021 07:00 PM UTC
2021 Paving Program
The project consists of the following 2 projects: 1) City Paving Project includes • Pavement planing and resurfacing of approximately 19,400 LF of roadway • Approximately 3,500 SF of concrete sidewalk including 43 curb ramps and approx. 3,600 LF of curb 2) CDBG Sidewalk Improvements • Approximately 8,600 SF of concrete sidewalk including 8 curb ramps and approx. 800 LF of curb
03/26/2021 07:00 PM UTC
Columbus Avenue Roadway Improvements, Phase 1
The project consists of the following: • Roadway – 2,200 feet of roadway improvements along Columbus Avenue. • Roadway improvements include pavement resurfacing, new curbing, drive approaches, sidewalks, asphalt shared use path, street lighting, and storm sewer. • Storm Sewer – approximately 2,900 feet of new storm sewer, 18 new storm structures • Maintenance of traffic to facilitate the construction of these improvements • Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. The Engineer's Estimate is $2,170,000
03/12/2021 07:00 PM UTC
Marysville Bridge Design RFQ
The City of Marysville, Ohio, wishes to receive Letters of Interest (LOI) from an Engineering Consultant (or team including sub-consultants) to assist the City with the East 4th Street Bridge Replacement and the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge projects. The project scope shall be sufficient to prepare all final construction documents including the necessary survey, soils testing, calculations, permitting (Ohio EPA, Army Corps, Jerome Township, and Union County Building Department, etc.) and construction services for both the East 4th Street Bridge Replacement and the Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. The project will consist of two areas of interest. The first portion of the project will consist of the design, removal, and replacement of the East Fourth Street Bridge over Town Run between Plum Street and Walnut Street. The second portion of the project is the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. This portion of the project includes the installation of 4,562 feet of 10 foot wide trail and a bridge that will span Mill Creek. The proposed bridge will have an approximate length of 170 feet. All submittals should be emailed directly to the Assistant City Engineer, Chad Green, P.E. (cgreen@marysvilleohio.org) by 4:00 p.m. on Friday, February 5, 2021
02/05/2021 09:00 PM UTC
2021 Propane
The work consists of providing PROPANE for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
11/24/2020 03:00 PM UTC
2021 Nitrate Solution
The work consists of providing NITRATE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
11/24/2020 03:00 PM UTC
81 - 90 of 142 Solicitations
1 2 … 5 6 7 9 11 12 13 14 15