City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
Name * | Description | |
---|---|---|
2016 odot construction and material specifications.pdf (6.83 MB) | ||
general plan notes.pdf (18 KB) | ||
public roadway plan notes.pdf (46.2 KB) | ||
sanitary sewer plan notes.pdf (50.5 KB) | ||
storm sewer plan notes.pdf (48.5 KB) | ||
water plan notes.pdf (47.8 KB) | ||
sanitary sewer specifications.pdf (1.1 MB) | ||
water specifications.pdf (9.63 MB) | ||
sanitary sewer standard drawings.pdf (1.66 MB) | ||
stormwater standard drawings.pdf (2.11 MB) | ||
street standard drawings.pdf (3.52 MB) | ||
water standard drawings.pdf (2.37 MB) | ||
marysville supplemental specifcations.pdf (773 KB) | ||
stormwater drainage manual.pdf (2.89 MB) | ||
marysville_2017 w-9.pdf (75.7 KB) | ||
Number | Deadline |
---|---|
U.S. 42 & Industrial Parkway Waterline Relocation
The project consists of the relocation and replacement of 1.12 miles of waterline on U.S. 42 and Industrial Parkway.
U.S. 42 & Industrial Parkway Waterline Relocation Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 2:00 – 3:00pm
Pre-Bid : U.S. 42 & Industrial Parkway Waterline Relocation
Wednesday, January 8, 2025 · 2:00 – 3:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/uni-crgj-vnq
Or dial: (US) +1 302-316-4650 PIN: 191 862 263#
More phone numbers: https://tel.meet/uni-crgj-vnq?pin=7205934056263
| 01/22/2025 06:00 PM UTC |
Coleman's Crossing & Industrial Parkway Roundabout
The project consists of installing a roundabout at the intersection of Coleman’s Crossing and Industrial Parkway in the City of Marysville. Also included is drainage, lighting, and signage & pavement marking modifications.
Coleman's Crossing & Industrial Parkway Roundabout Virtual Pre-Bid Meeting
Wednesday, January 8th, 2025 · 1:00 – 2:00pm
Pre-Bid : Coleman's Crossing & Industrial Parkway RAB
Wednesday, January 8, 2025 · 1:00 – 2:00pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/dao-qicj-iqe
Or dial: (US) +1 650-535-0802 PIN: 961 673 407#
More phone numbers: https://tel.meet/dao-qicj-iqe?pin=6404319177501
| 01/22/2025 06:00 PM UTC |
Number | Deadline |
---|---|
2019 Paving Program
The 2019 Marysville Paving Program includes the following:
• City Paving Project
o Pavement planing and resurfacing of approximately
21,500 LF of roadway
o Approximately 4,000 SF of concrete sidewalk
including 38 curb ramps and approx. 3,500 LF of
curb.
• CDBG Sidewalk Improvements
o Approximately 7,800 SF of concrete sidewalk
including 10 curb ramps and approx. 750 LF of curb.
| 03/20/2019 05:00 PM UTC |
Columbus Avenue Stormwater Improvements
The project consists of the installation of the following:
• Approximately 2,000 feet of storm sewer ranging from eighteen (18) to forty-two (42) inches in diameter. This work will also include the manholes and catch basins necessary to permit access to the system and promote positive drainage.
• Forty-eight (48) inch drainage culvert and sixty (60) inch steel casing pipe utilizing jack and bore method under the adjacent CSX Railroad
• Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
| 03/13/2019 05:30 PM UTC |
West 5th Street Improvements
The West 5th Street Improvements project consists of the installation of the following:
• Roadway – 3,200 feet of roadway improvements along West 5th Street from Raymond Road / Damascus Road to Grove Street / West 4th Street.
• Roadway improvements include pavement resurfacing, new curbing, drive approaches, sidewalks, asphalt shared use path, street lighting, signal upgrades, and storm sewer.
• Storm Sewer – approximately 2,180 feet of new storm sewer, 11 new storm structures and 1 storm water quality structure
• Maintenance of traffic to facilitate the construction of these improvements
• Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
• Via alternate bids, a shared use path through the City of Marysville’s Oakdale Cemetery may also be included within the scope of this project.
| 03/04/2019 09:00 PM UTC |
Bicentennial Park
New city park project includes:
• Landscaping including shade trees, shrubs, mulching and perennials
• Spreading topsoil and grass placement across the approximate one (1) acre site
• Forty (40) gabion baskets filled with local washed river gravel
• 5,500 square feet of concrete sidewalk
• Necessary restoration (including grading, erosion control, etc.) and other miscellaneous items (including benches, trash / recycling receptacles, etc.).
• Via alternate bids, an irrigation system and park lighting may also be included within the scope of this project.
| 02/11/2019 06:30 PM UTC |
City of Marysville - Removal of Water Treatment Plant Lime Lagoon Sludge
The work consists of the removal of the Water Treatment Plant's lime lagoon sludge. There's approximately 12,500 dry tons of Water Treatment Plant lime lagoon sludge residual to be removed.
| 01/18/2019 07:00 PM UTC |
Plum Street Improvements
The project consists of the installation of the following:
-Roadway: 1,000 feet of public roadway (including a boulevard section) South of East Ninth Street, including lighting, curb, sidewalk and maintenance of traffic
-Storm Sewer: A 50 foot long 16’x 5’ box culvert
-Sanitary Sewer: 150 feet of sanitary sewer relocation including four manholes
-Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items (including a potential waterline relocation) required to restore the area to its original condition, or better.
The original Engineer's Estimate for this project is $804,500. After Addendum #1, the Engineer's Estimate has been revised to $930,000.
| 01/07/2019 06:30 PM UTC |
City of Marysville 2019 Wastewater Chemicals - Propane
The work consists of providing propane for the City of Marysville's Division of Wastewater during the 2019 calendar year:
| 12/17/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Ferric Chloride Bulk
The work consists of providing Ferric Chloride Bulk in 300 gallon totes (estimated quantity is 4,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year AND Ferric Chloride Bulk (estimated quantity is 516,000 lbs) for for the City of Marysville's wastewater treatment plant operations during the 2019 calendar year.
| 12/10/2018 02:30 PM UTC |
City of Marysville Dunham Water Tower Painting
The Dunham Water Tower Painting project consists of the following:
- Installation of a flap gate on the overflow pipe.
- Replacing the roof vent.
- Secure overflow pipe to lower leg of tower
- Installation of an internal balcony in the bowl.
- Pit welding.
- Replacing the aviation lights.
- Abrasive blast cleaning and repainting the interior.
- Abrasive blast cleaning and repainting the exterior with containment.
- Applying City logo as directed.
| 12/04/2018 08:00 PM UTC |
City of Marysville 2019 Water Treatment Chemicals - Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs) for the City of Marysville's water treatment plant operations during the 2019 calendar year:
| 12/04/2018 08:00 PM UTC |